MITIE in healthcare brochure
MITIE in healthcare brochure
MITIE in healthcare brochure
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
CASE STUDY - Addenbrooke’s<br />
Hospital, Cambridge<br />
University Hospitals NHS<br />
Foundation Trust<br />
Services provided:<br />
• Develop<strong>in</strong>g and operat<strong>in</strong>g a stateof-the-art<br />
energy centre.<br />
What the Trust was look<strong>in</strong>g for?<br />
The Trust needs to upgrade its exist<strong>in</strong>g<br />
low carbon energy provision on its<br />
expand<strong>in</strong>g medical and biomedical<br />
campus, which <strong>in</strong>cludes the world<br />
renowned Addenbrooke’s Hospital.<br />
How are we help<strong>in</strong>g?<br />
We’re preferred bidder to develop a<br />
new energy centre for the campus<br />
over a 25-year contract term. We will<br />
also reduce on-site energy demand<br />
throughout the hospital. The energy<br />
centre will save almost 30,000 tonnes<br />
of carbon a year, surpass<strong>in</strong>g the Trust’s<br />
susta<strong>in</strong>ability targets by 27%. This means<br />
a 47% cut <strong>in</strong> carbon emissions and<br />
more than a 50% reduction <strong>in</strong> grid<br />
electricity and gas consumption over<br />
the contract term. The new energy<br />
centre will also provide low-carbon<br />
heat<strong>in</strong>g, hot water and electricity for<br />
Addenbrooke’s and Rosie hospitals. The<br />
centre will use advanced, <strong>in</strong>novative<br />
technology <strong>in</strong>clud<strong>in</strong>g a brand new<br />
<strong>in</strong>c<strong>in</strong>erator, a highly efficient Rolls-<br />
Royce comb<strong>in</strong>ed heat and power<br />
plant and biomass boilers that use<br />
susta<strong>in</strong>able wood chip as fuel source.