Appendix B – Pest and Weed Management Plan (5 MB) - Santos
Appendix B – Pest and Weed Management Plan (5 MB) - Santos
Appendix B – Pest and Weed Management Plan (5 MB) - Santos
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
8. Post Construction<br />
8.1 Monitoring <strong>and</strong> Control Program<br />
<strong>Weed</strong> monitoring <strong>and</strong> subsequent weed control will continue for 2 years after project<br />
completion <strong>and</strong> be under the control of the Contractor for this timeframe. This will be<br />
achieved through the development <strong>and</strong> implementation of a <strong>Weed</strong> Monitoring <strong>and</strong><br />
Control Program (to be included as part of the CPWMP). This program will include<br />
(but not limited to):<br />
• The rate of monitoring <strong>and</strong> control post completion will be as follows:<br />
<strong>–</strong> Post rain event <strong>–</strong> once a month for three months<br />
<strong>–</strong> Otherwise, once every two months<br />
<strong>–</strong> In response to l<strong>and</strong>holder or operator request<br />
• <strong>Weed</strong> monitoring <strong>and</strong> control activities shall include all Project Areas (eg tracks,<br />
ROW, camps, laydown <strong>and</strong> storage areas)<br />
• <strong>Weed</strong> control shall be undertaken by appropriately qualified <strong>and</strong> experienced<br />
Contractors who are appropriately licensed under the ACDC Act<br />
Upon completion, the responsibility will be h<strong>and</strong>ed to the Pipeline Operator.<br />
Page 8-24