Dam Synchronisation and Flood Releases - agriwaterpedia.info
Dam Synchronisation and Flood Releases - agriwaterpedia.info
Dam Synchronisation and Flood Releases - agriwaterpedia.info
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
DAM SYNCHRONISATION AND FLOOD RELEASES IN THE ZAMBEZI RIVER BASIN PROJECT: ANNEX 1 OF FINAL REPORT<br />
<br />
<br />
<br />
Provide for a study to clean, patch <strong>and</strong> extend available observed data <strong>and</strong> carry out statistical<br />
analysis of stream flows to <strong>info</strong>rm dam operations. Provide for on-going service as the data<br />
provided often has gaps that need to be filled.<br />
Carry out verification of existing data from different stations to assess the consistency <strong>and</strong><br />
quality of <strong>info</strong>rmation.<br />
Put in place systems which require the regular updating of rating curves <strong>and</strong> calculate flows<br />
from observed gauge records.<br />
vii