4/12-4/13/07 Board Meeting Minutes<br />

Peru<br />

Acceptance of $8,500 for emergency water system repairs<br />

Acceptance of $212,500 for fire sprinkler system in TJ Majors<br />

Retrieval of $3,933.33 for ADA restroom modifications (materials only) in AV Larson<br />

Retrieval of $938.72 for mechanical equipment insulation (materials<br />

Retrieval of $7,144.73 for design structural/foundation stabilization at Al Wheeler Activity Center<br />

Acceptance of $8,500 for phase II window repairs in TJ Majors<br />

Retrieval of $4,675 for emergency water system repair<br />

Wayne<br />

Acceptance of $212,500 for fire sprinkler system in Benthack Hall<br />

Retrieval of $850.82 for tuckpointing design in U.S. Conn Library<br />

Retrieval of $94,409.50 for water system upgrades<br />

Retrieval of $833.44 for tuckpointing design in Benthack Hall<br />

Retrieval of $839.96 for tuckpointing design in Brandenburg Education<br />

Retrieval of $341.98 for tuckpointing design in Carhart Science<br />

Retrieval of $851.95 for tuckpointing design in Hahn Administration<br />

Retrieval of $851.93 for tuckpointing design in Humanities<br />

Retrieval of $594.08 for tuckpointing design in Peterson Fine Arts<br />

Retrieval of $528.39 for tuckpointing design in Rice Auditorium<br />

Retrieval of $837.66 for tuckpointing design in Studio Arts<br />

Retrieval of $2,380 for HVAC/electrical system study in Peterson Fine Arts<br />

Retrieval of $4,257.66 for fire alarm system installation in U.S. Conn Library<br />

Retrieval of $27,787 for emergency campus electrical repair<br />

Retrieval of $59,620.37 for roof replacement on U.S. Conn Library<br />

Retrieval of $26,261.95 for roof replacement on Studio Arts<br />

Contracts and Change Orders<br />

A motion to approve the following contracts submitted by the colleges was recommended by the<br />

committee to the full Board, which unanimously approved the motion. Voting aye: Bieganski, Peterson,<br />

Roskens, and Teahon. Voting nay: None. Student Opinion aye: Ellis, Jacobsen and Pribbeno.<br />

Chadron <strong>State</strong> Contract<br />

• Campus (2-29 passenger buses) - $186,128<br />

Peru <strong>State</strong> Contract<br />

• Campus (1-29 passenger bus) - $93,926<br />

Wayne <strong>State</strong> Contracts<br />

• Rice Auditorium & Memorial Stadium (Architectural fees – design development, CD,<br />

construction supervision) - $225,000<br />

• Campuswide (Advertising and marketing – recruitment publications) - $82,029<br />

• Campuswide (Advertising and marketing – spring TV campaign for Sioux City and Norfolk) -<br />

$29,031<br />

• Campus Services (Construction of addition and renovation of existing Facility Services<br />

Building) - $4,014,000<br />

Approve Interlocal Agreement Between WSC and Wayne Community Schools<br />

A motion to approve the interlocal agreement between Wayne <strong>State</strong> and the Wayne Community Schools<br />

for facilities use was recommended by the committee to the full Board, which unanimously approved the<br />

motion. (Copy is attached to the official minutes.)<br />