Preliminary Technical Assessment of the Architectural and Archaeological Heritage in South East Europe<br />

14<br />

________________________________________________________________________________________________<br />

a. Technical Description<br />

Appendix 2<br />

1. The foundations<br />

1.a Description, weaknesses: Geological problems of the rocky massif, and soil erosion problems.<br />

1.b Damages, (effects) threats: There are extend cracks in the rock and soil erosion.<br />

1.c Deterioration measures - Rate of deterioration: High<br />

1.d Supposed interventions:<br />

• Consolidation of the massif and elimination of the effects of soil erosion.<br />

• Conservation and consolidation intervention to the foundations and the surrounding wall of the citadel.<br />

1.e Priority of intervention : Urgent<br />

1.f Cost:<br />

• Consolidation of the massif 3 million US$<br />

• Conservation and consolidation of the foundations and defensive walls 2 million US$<br />

5 million US$<br />

2. The walls and the sustaining structure<br />

2.a Description, weaknesses: Constructional and structural problems<br />

2.b Damages, (effects) threats: There are vertical cracks, deterioration and detachments of the walls.<br />

2.c Deterioration measures: Static affected anomalies of the massif, the deterioration of the internal wall<br />

structures, humidity.<br />

Rate of deterioration: High.<br />

2.d Supposed interventions: Consolidation of the internal structures of the walls (cleaning, washing and filling);<br />

protection against humidity.<br />

2.e Priority of intervention: Urgent<br />

2.f Cost: 2 million US$<br />

3. The floor of the galleries<br />

3.a Description, weaknesses: Loss of grazing material.<br />

3.b Damages, (effects) threats: There are cracks in the alcoves<br />

3.c Deterioration measure: Amortisation of materials.<br />

Rate of deterioration: Medium<br />

3.d Supposed interventions: Restoration of the floors.<br />

3.e Priority of intervention: Medium<br />

3.f Cost: 150 000 US$<br />

6. Doors and windows<br />

6 . a Description, weaknesses: The majority have been destroyed.<br />

6.b Damages, (effects) threats: Lack of maintenance.<br />

6.c Deterioration measures - Rate of deterioration: Medium.<br />

6.d Supposed interventions: Restoration and filling.<br />

6.e Priority of intervention: Medium.<br />

6.f Cost: 150 000 US$<br />

8. Infrastructure<br />

8.a Description, weaknesses: The infrastructure has degraded.<br />

8.b Damages, (effects) threats: Paths partly destroyed, the water and electrical systems do not work properly.<br />

8.c Deterioration measures: Lack of maintenance.<br />

Rate of deterioration: Medium.<br />

8.d Supposed interventions: Total reconstruction works and restoration.<br />

8.e Priority of intervention: Medium.<br />

8.f Cost: 1 million US$<br />

TOTAL COST 8 300 000 US$<br />

________________________________________________________<br />

Fortress of <strong>Gjirokastra</strong> –<strong>Gjirokastra</strong> –<strong>Albania</strong> 12 December 2006

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!