DETAILS OF CONTRACTS PLACED BY OPEN TENDER<br />
(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)<br />
(Status for the Month of APRIL 2013-JUNE 2013)<br />
LOA No.<br />
and date<br />
Works Awarded : APRIL 2013<br />
Contractor’s<br />
Name and<br />
address<br />
Quantity<br />
(for supply<br />
contract)/<br />
Estimated Cost<br />
(For Engg./Elect.<br />
/S&T/ Mech. etc<br />
Works)<br />
Rate<br />
(for supply<br />
contract)/<br />
<strong>Tender</strong>ed Cost<br />
(For<br />
Engg./Elect./S&T/<br />
Mech. etc Works)<br />
Value of<br />
Contract<br />
Annexure: A<br />
Scheduled<br />
completion<br />
date<br />
180-days from the<br />
date of issue of LOA<br />
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)<br />
1 IRCON/ 24.01.2013 Supply of (05 Nos.) 10/3 IRCON/MECH/ M/s Unique (05 nos.) (05 nos.) `8,62,46,984/-<br />
MECH/1029/<br />
RCF.RBL-<br />
Ton Electric Overhead 1029/RCF-RBL- Industrial Handlers `962.00 Lacs `8,62,46,984/-<br />
II/EOT<br />
Travelling Cranes at Rail II/EOT Crane/44/2262 Pvt. <strong>Ltd</strong>., 206-207,<br />
Crane/44<br />
Coach Factory, Lalganj, dtd 15.04.13 Nahar & Seth Ind.<br />
dtd.<br />
Raebareli, UP-(INDIA)<br />
Estate Chakala,<br />
25.12.2012<br />
Andheri (East),<br />
Mumbai-400 099<br />
Contd.../-
S.<br />
N.<br />
<strong>Tender</strong><br />
No.<br />
Date of<br />
opening<br />
Description of Item/<br />
Work<br />
LOA No.<br />
and date<br />
Works Awarded : MAY 2013<br />
Contractor’s<br />
Name and<br />
address<br />
Quantity<br />
(for supply<br />
contract)/<br />
Estimated Cost<br />
(For Engg./Elect.<br />
/S&T/ Mech. etc<br />
Works)<br />
Rate<br />
(for supply<br />
contract)/<br />
<strong>Tender</strong>ed Cost<br />
(For<br />
Engg./Elect./S&T/<br />
Mech. etc Works)<br />
Value of<br />
Contract<br />
Scheduled<br />
completion<br />
date<br />
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)<br />
1 IRCON/MEC 05.02.2013 Pipelines for IRCON/MECH/ M/s Legris India `1607.00 Lacs `17,21,50,978/- `17,21,50,978/-<br />
H/1029/RCF-<br />
RBL-II/<br />
Compressed Air, Argo 1029/RCF-RBL-II/ Pvt. <strong>Ltd</strong>., Plot No.:<br />
+<br />
Pipelines/<br />
mix, Nitrogen & Oxygen Pipelines/028B dtd 99, Pace City-1,<br />
AMC for 5 years<br />
028B dtd<br />
Gas Supply and Storage 10.05.2013 Sector-37,<br />
`2,59,91,027/-<br />
30.10.2012<br />
System in Shell & Bogie<br />
Gurgaon-122 001<br />
Fax:0124-66173708<br />
2 IRCON/2049<br />
/ROB-II-<br />
BIHAR/TEN<br />
DER/LC-<br />
3SPL/I/2013/<br />
13 Dtd.<br />
12.04.2013<br />
3 IRCON/Civil/102<br />
9/RCF-<br />
RBL/10/<strong>Tender</strong>/<br />
3/OT/28<br />
Dtd.12.03.2013<br />
Shops<br />
03.05.2013 Construction of Road over<br />
Bridge both railway span<br />
and adjacent approaches<br />
span including Reinforced<br />
Earth wall/ Retaining wall<br />
in lieu of LC No 3SPL at<br />
Km. 51/09-10 between<br />
Hajipur- Muzaffarpur<br />
section on Barauni-<br />
Gorakphur Route in<br />
Sonepur Division of East<br />
Central Railway,Bihar<br />
09.04.2013 Connection of two nos.<br />
Road Under bridges<br />
(RUB) by cut & cover<br />
technique comprising box<br />
of approximate opening<br />
sixe 7.0 x 3.65 m and 20<br />
m length along with its<br />
approaches, drainage and<br />
allied road works etc.<br />
complete for RCF,<br />
Raebareli at Lalganj<br />
IRCON/2049/ROB-II-<br />
BIHAR/LC-<br />
3SPL/LOA/104/1239<br />
Dtd.27.05.2013<br />
IRCON/Civil/1029/RC<br />
F-RBL/10/<strong>Tender</strong>/3/<br />
OT/28/3383<br />
Dtd.28.05.2013<br />
M/s BSC-C&C JV<br />
Plot No.:70,<br />
Sector-32,<br />
Gurgaon – 122 001,<br />
Haryana<br />
M/s Hi-Tech<br />
Competent Builders<br />
Pvt. <strong>Ltd</strong>, G-17, RIICO<br />
Industrial Area,<br />
Phase-I, Bhiwadi –<br />
301019<br />
Distt.- Alwar (Raj.)<br />
Ph.: 01493-512248,<br />
226343,<br />
Mob.: 09314234530<br />
Email:<br />
htcbpl_123@yahoo.co.in<br />
210-days from GAD<br />
approval<br />
`3044.70 Lacs 12.50% above `34,25,29,193/- 15-months<br />
including the<br />
monsoon period<br />
from the date of<br />
issue of LOA<br />
`650.97 Lacs `650.97 Lacs `722.57 Lacs 12-months from the<br />
date of issue of<br />
LOA i.e. 27.05.2014<br />
Contd.../-
S.<br />
N.<br />
<strong>Tender</strong><br />
No.<br />
Date of<br />
opening<br />
Description of Item/<br />
Work<br />
LOA No.<br />
and date<br />
Works Awarded : JUNE 2013<br />
Contractor’s<br />
Name and<br />
address<br />
Quantity<br />
(for supply<br />
contract)/<br />
Estimated Cost<br />
(For Engg./Elect.<br />
/S&T/ Mech. etc<br />
Works)<br />
Rate<br />
(for supply<br />
contract)/<br />
<strong>Tender</strong>ed Cost<br />
(For<br />
Engg./Elect./S&T/<br />
Mech. etc Works)<br />
Value of<br />
Contract<br />
Scheduled<br />
completion<br />
date<br />
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)<br />
1 IRCON/2034/<br />
ROB-II-BIHAR/<br />
TENDER/LC-<br />
45AB/I/2013/12/<br />
dtd.08.04.2013<br />
2 IRCON/2034/<br />
ROB-BIHAR/<br />
TENDER/LC-<br />
79/Mithapur/<br />
<strong>Tender</strong>/2013/14<br />
Date:30.04.13<br />
30.04.2013 Construction of Road<br />
over Bridge both railway<br />
span and adjacent<br />
approaches span<br />
including Reinforced<br />
Earth wall/ Retaining<br />
wall in lieu of LC No 45<br />
AB at Km. 324/13-14<br />
between Chapra<br />
kacheri-Goldengunj<br />
section in Varanasi<br />
Division of North Eastern<br />
Railway,Bihar<br />
21.05.2013 Construction of Balance<br />
Work (Balance Portion of<br />
Railway Triangular<br />
Portion, Pun-Pun Arm &<br />
Mithapur Arm) For Road<br />
Over Bridge in Lieu of<br />
LC- 79 At Mithapur,<br />
Patna (Bihar) Including<br />
Railway Span of<br />
Mithapur Arm,<br />
Reinforced Earth Wall/<br />
Retaining Wall<br />
IRCON/2049/ ROB-II-<br />
BIHAR/LC-<br />
45AB/LOA/ 105/1316<br />
Dtd. 07.06.2013<br />
IRCON/2034/ ROB-I-<br />
BIHAR/LC-79/LOA/<br />
110/1408<br />
Date:21.06.13<br />
M/s Tribeni<br />
Construction <strong>Ltd</strong>.,<br />
New Town Square,<br />
Office No.: 4M,<br />
Chinar Park,<br />
New Town,<br />
Rajarhat, Kolkata –<br />
700 136<br />
M/s Mehar<br />
Foundations & Civil<br />
Engineers Pvt. <strong>Ltd</strong>.,<br />
31, Dun Shoping<br />
Centre,<br />
Lallubhai Amichand<br />
Compound, Tardeo<br />
Road, Mumbai –<br />
400 007<br />
`2430.44 Lacs Schedule-A :<br />
3.00% above<br />
Schedule-B :<br />
3.00% above<br />
Schedule-A :<br />
`2,04,81,796/-<br />
Schedule-B :<br />
`22,98,53,968/-<br />
Total amount: `25,03,35,764/-<br />
15-months<br />
including the<br />
monsoon period<br />
from the date of<br />
issue of LOA<br />
`2502.93 Lacs 8.50% above `27,15,67,756/- 15-months<br />
including the<br />
monsoon period<br />
from the date of<br />
issue of LOA<br />
Contd.../-
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)<br />
3 IRCON/2034/<br />
ROB-BIHAR/<br />
TENDER/LC-72<br />
(3leg)/2013/15<br />
Date:07.05.13<br />
28.05.2013 Construction of Third leg<br />
of Road over Bridge<br />
including foundation,<br />
substructure,<br />
superstructure, slip road,<br />
Reinforced Earth wall,<br />
Retaining wall etc. in lieu<br />
of LC- 72 at Km 536<br />
between Gulzarbagh<br />
and Patna Saheb<br />
Section in Danapur<br />
Division of E C Railway ,<br />
Bihar<br />
IRCON/2049/ ROB-II-<br />
BIHAR/LC-72<br />
(3leg)/LOA/109/1400<br />
Dtd.21.06.2013<br />
M/s Naraindas<br />
Construction Pvt.<br />
<strong>Ltd</strong>., 14/441,<br />
Vinodpur, Katihar<br />
(Bihar)<br />
PIN-854105<br />
`893.39 Lacs 8.96% above `9,73,43,754/- 15-months<br />
including the<br />
monsoon period<br />
from the date of<br />
issue of LOA<br />
4 IRCON/2049/R<br />
OB-II-<br />
BIHAR/TENDE<br />
R/LC-<br />
159/I/2013/2<br />
Date:11.01.13<br />
01.02.2013 Construction of Road<br />
over Bridge both railway<br />
span and adjacent<br />
approaches span<br />
including Reinforced<br />
Earth wall/ Retaining<br />
wall in lieu of LC No:159<br />
A/SPL at Km.164/15-16<br />
between Jivdhara-<br />
Motihari Section on<br />
Barauni-Gorakhpur<br />
Route in Samastipur<br />
Division of East Central<br />
Railway<br />
IRCON/2049/ROB-II-<br />
BIHAR/LC-<br />
159A/LOA/112/1422<br />
Date:24.06.2013<br />
M/s TRG Industries<br />
Pvt. <strong>Ltd</strong>.,<br />
E-461, Greater<br />
Kailash-II, Delhi-<br />
110 048<br />
`5112.03 Lacs Schedule-A :<br />
8.80% above<br />
Schedule-B :<br />
8.80% above<br />
Schedule-A :<br />
`2,37,86,997/-<br />
Schedule-B :<br />
`53,24,01,511/-<br />
Total amount: `55,61,88,508/-<br />
15-months<br />
including the<br />
monsoon period<br />
from the date of<br />
issue of LOA