16.04.2015 Views

A DETAILS OF CONTRACTS PLACED BY OPEN TENDER - Ircon ...

A DETAILS OF CONTRACTS PLACED BY OPEN TENDER - Ircon ...

A DETAILS OF CONTRACTS PLACED BY OPEN TENDER - Ircon ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>DETAILS</strong> <strong>OF</strong> <strong>CONTRACTS</strong> <strong>PLACED</strong> <strong>BY</strong> <strong>OPEN</strong> <strong>TENDER</strong><br />

(For Civil Engg. /Elect. Engg. /S & T/Mech. etc works)<br />

(Status for the Month : From APRIL 2011 To JANUARY 2012)<br />

Annexure: A<br />

S.<br />

N.<br />

Tender<br />

No.<br />

1 IRCON/1029<br />

/RCF-<br />

RBL/10/TEN<br />

DER (Risk &<br />

Cost)<br />

C&R/11/3/O<br />

T/01 Dt.<br />

15.02.2011<br />

2 IRCON/CC/<br />

TN/RSVY-<br />

BIHAR/10/6<br />

13 dated<br />

06.10.2010<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

09.03.2011 RCF-Raebareli Project:<br />

Balance work of<br />

construction of RCC Box<br />

Culverts and Cement<br />

Concrete Roads with<br />

related works at Rail<br />

Coach Factory,<br />

Raebareli at Lalganj<br />

(Risk & Cost)<br />

25.10.2011 RSVY in Bihar:<br />

Balance work for<br />

Improvement/<br />

Upgradation of SH-50<br />

into 2-lane road from<br />

Laheriasarai (CH. – 0.000<br />

Km.) to Hanumannagar<br />

(CH.–16.471 Km.) of<br />

Darbhanga district in the<br />

State of Bihar [Package:<br />

1B(ii)-I(A)]<br />

LOA No.<br />

and date<br />

IRCON/1029/RCF-<br />

RBL/10/<strong>TENDER</strong><br />

(Risk & Cost)<br />

C&R/11/3/OT/01 Dt.<br />

13/15.04.2011<br />

IRCON/CC/TN/RSV<br />

Y-BIHAR/10/613/275<br />

dated 19.04.2011<br />

Works Awarded : APRIL 2011<br />

Contractor’s<br />

Name and<br />

address<br />

M/s High-tech<br />

Competent Builders<br />

Pvt. Ltd., G-17,<br />

RIICO Industrial<br />

Area, Phase-I,<br />

Bhiwadi, Distt.-<br />

Alwar, Rajasthan<br />

Mob:9414012550<br />

M/s Raghav Civcon<br />

Pvt. Ltd.<br />

Rajkumarganj,<br />

P.O.-Lalbagh,<br />

District –<br />

Darbhanga (Bihar)<br />

Quantity<br />

Rate<br />

(for supply<br />

(for supply<br />

contract)/<br />

contract)/<br />

Estimated Cost<br />

Tendered Cost<br />

(For<br />

(For Engg./Elect.<br />

Engg./Elect.<br />

/S&T/Mech. etc<br />

/S&T/ Mech. etc<br />

Works)<br />

Works)<br />

` 7.86 Crores<br />

(Basic cost as per<br />

DSR 2007)<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date<br />

Schedue “A” 29.85<br />

% above the DSR-<br />

2007<br />

schedule “B”<br />

`1325/- per m 3 `10,07,52,666/- 05 Months<br />

`1279.66 Lacs `1279.66 Lacs `17,85,00,314.62 18.10.2011


S.<br />

N.<br />

Tender<br />

No.<br />

1 IRCON/CC/<br />

TN/JBNRL-<br />

2051/EMBA<br />

NK/617<br />

Dtd.18.01.11<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

17.02.2011 New BG Railway Line<br />

Project in Nepal:<br />

Construction of<br />

Embankment, Side<br />

Drains, Retaining Walls<br />

and Blanketing work,<br />

construction of bridges<br />

(minor & major) and<br />

other ancillary works on<br />

India side of alignment<br />

from Km 0+000 to Km<br />

5+445 for new B.G. Rly<br />

line from Jogbani to<br />

Biratnagar (Nepal)<br />

LOA No.<br />

and date<br />

IRCON/CC/TN/JBN<br />

RL-<br />

2051/EMBANK/617/<br />

7 Dtd.25.05.2011<br />

Works Awarded : MAY 2011<br />

Contractor’s<br />

Name and<br />

address<br />

M/s APR-VNR<br />

(JV), Flat No.:<br />

404, 5 th Floor,<br />

Bhanu Enclave,<br />

Sundar Nagar,<br />

Erragadda,<br />

Hyderabad –<br />

500034 FAX No.:<br />

040-23708788<br />

Quantity<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

(For<br />

Engg./Elect.<br />

/S&T/ Mech. etc<br />

Works)<br />

Rate<br />

(for supply<br />

contract)/<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date<br />

`1848.59 Lakhs `1848.59 Lakhs `18,03,27,336.46 15-months from the<br />

date of issue of<br />

LOA


S.<br />

N.<br />

Tender<br />

No.<br />

1 IRCON/Civil<br />

/1029/RCF-<br />

RBL/10/Ten<br />

der/3/OT-16<br />

Dt.17.03.11<br />

2 IRCON/101<br />

4/J&K-DQ/<br />

Addl. Qtrs,<br />

GRPB,<br />

Misc-<br />

Banihal<br />

/SQ-3 Dt.<br />

22.03.11<br />

3 IRCON/Civil<br />

/1029/RCF-<br />

RBL/10/Ten<br />

der/3/OT-17<br />

Dt.17.03.11<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

18.04.2011 RCF Raebareli Project:<br />

Construction of shell<br />

fabrication shop of RCF<br />

Raebareli including<br />

architectural, structural<br />

design, fabrication,<br />

supply and erection of<br />

Pre-Engineered Steel<br />

Buildings<br />

20.04.2011 J&K Rail Link Project –<br />

Dharam – Qazigund<br />

Section : Construction<br />

of Additional Type II & III<br />

Quarters and 111<br />

Bedded GRP Barrack<br />

and other miscellaneous<br />

works at Banihal yard<br />

(Package SQ-3)<br />

18.04.2011 RCF Raebareli Project:<br />

Construction of Flooring,<br />

civil works in shell<br />

fabrication shop and<br />

traverser track at RCF,<br />

Raebareli at Lalganj<br />

LOA No.<br />

and date<br />

IRCON/Civil/1029/R<br />

CF-<br />

RBL/10/Tender/3/OT<br />

-16/107<br />

Dtd.02.06.2011<br />

IRCON/1014/J&K-<br />

DQ/ Addl. Qtrs,<br />

GRPB, Misc-Banihal<br />

/SQ-3/55 Dt.<br />

06.06.2011<br />

IRCON/Civil/1029/R<br />

CF-<br />

RBL/10/Tender/3/OT<br />

-17/117<br />

Dtd.10.06.2011<br />

Works Awarded : JUNE 2011<br />

Contractor’s<br />

Name and<br />

address<br />

M/s Ram Kripal<br />

Singh Construction<br />

Pvt. Ltd., Off No.<br />

208 7 309, Suncity<br />

Shopping Arcade,<br />

Sector – 54,<br />

Gurgaon, Haryana<br />

– 122 002<br />

Ph. No.: 0124-<br />

2572879<br />

M/s Ghulam<br />

Mohammad & Co.<br />

and M/s M.N.<br />

Enterprises,<br />

Kralpora Chadoor,<br />

Budgam, J&K<br />

State, H.O.: Govt.<br />

Colony, Baghi-e-<br />

Mehtab, H.No.120,<br />

SK-19, Srinagar,<br />

Kashmir, 190011<br />

Mob.:9419006575<br />

M/s Gangotri<br />

Enterprises Ltd.,<br />

B-158, Sector-”A” ,<br />

Mananagar,<br />

Lucknow – 226006<br />

Ph. No.: 0522-<br />

2321104<br />

Quantity<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

(For Engg/Elect /S&T/<br />

Mech. etc Works)<br />

Rate<br />

(for supply<br />

contract)/<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date<br />

`5410 Lakhs 17% above `63,29,96,376/- 09-months from the<br />

date of issue of<br />

LOA<br />

`1696.431 Lakhs `1527 Lakhs `1663.56 Lacs 15-months from the<br />

date of issue of<br />

LOA<br />

`2679 Lakhs<br />

Schedule “A”<br />

2.61% above the<br />

DSR (2007)<br />

Schedule “B”<br />

5.00% below<br />

estimate<br />

`27,04,06,445.51 10-months from the<br />

date of issue of<br />

LOA<br />

Continued...../-


S.<br />

N.<br />

Tender<br />

No.<br />

4 IRCON/100<br />

8/J&K-<br />

DLI/Quarter<br />

s-<br />

Budgam/Q-<br />

7R<br />

Dt.18.05.11<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

18.05.2011 Construction of RPF<br />

Quarters Type-II, III and<br />

IV units at Budgam<br />

Railway Station on<br />

Qazigund - Baramulla<br />

New BG Rail Line<br />

Project(J&K)<br />

(Package: Q – 7R)<br />

LOA No.<br />

and date<br />

IRCON/1008/J&K-<br />

DLI/Quarters-<br />

Budgam/Q-7R/122<br />

Dt.30.06.11<br />

Works Awarded : JUNE 2011<br />

Contractor’s<br />

Name and<br />

address<br />

M/s Star<br />

Constructions, 1 st<br />

Floor, AI-Noor<br />

Complex,<br />

Hyderpora, Bypass<br />

(West), Srinagar,<br />

Kashmir-190014<br />

Mob.:<br />

09419001145,<br />

09419006074,<br />

FAX: 0194-<br />

2430631<br />

Quantity<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

(For<br />

Engg./Elect.<br />

/S&T/ Mech. etc<br />

Works)<br />

Rate<br />

(for supply<br />

contract)/<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date<br />

`506 Lakhs `506 Lakhs `5,66,67,665.99 06-months from the<br />

date of issue of<br />

LOA<br />

Works Awarded : JULY 2011<br />

S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

address<br />

NIL<br />

Quantity<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

(For<br />

Engg./Elect.<br />

/S&T/ Mech. etc<br />

Works)<br />

Rate<br />

(for supply<br />

contract)/<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date<br />

Continued...../-


S.<br />

N.<br />

Tender<br />

No.<br />

1 IRCON/CC/<br />

TN/SR/11/<br />

622<br />

Dt.18.03.11<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

29.04.2011 Detailed Design<br />

Consultancy, 3D<br />

Monitoring and<br />

Construction supervision<br />

of Tunnel T-3 (between<br />

Km 5+917 & Km 7+174)<br />

& Tunnel T-4 (between<br />

Km 7+360 & 11+326) in<br />

connection with<br />

construction of Sivok<br />

Rangpo New single line<br />

B.G. Railway Project<br />

Works Awarded : AUGUST 2011<br />

LOA No.<br />

and date<br />

IRCON/2046/SRRP/<br />

DDC/TunnelT3-<br />

T4/526 Dt.26.08.11<br />

Contractor’s<br />

Name and<br />

address<br />

M/s AECOM Asia<br />

Company Ltd, 9 th<br />

Floor, Infinity<br />

Tower C, DLF<br />

Cyber City, DLF<br />

Phase-II, Gurgaon,<br />

Haryana - 122002,<br />

Tel.: 0124-<br />

4830100,<br />

FAX: 0124-<br />

4830108<br />

Quantity<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

(For<br />

Engg./Elect.<br />

/S&T/ Mech. etc<br />

Works)<br />

Rate<br />

(for supply<br />

contract)/<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

Value of<br />

Contract<br />

`1428 Lakhs `1428 Lakhs USD 21,55,262<br />

and INR<br />

6,60,99,481<br />

Scheduled<br />

completion<br />

date<br />

36-months from<br />

the date of issue of<br />

LOA<br />

Continued...../-


S.<br />

N.<br />

Tender<br />

No.<br />

1 IRCON/CC/<br />

TN/RSVY-<br />

BIHAR/11/<br />

631 Dtd.<br />

06.07.2011<br />

2 IRCON/<br />

1014/J&K-<br />

DQ/ UG<br />

Drainage<br />

pipejacking-<br />

Zone VI/ M-<br />

12R<br />

Dt. 29.06.11<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

21.07.2011 Construction of balance<br />

left over works of Box<br />

Culverts between Pupri<br />

to Benipatti (Ch.39.65<br />

Km to 14.72 Km) of SH-<br />

52 in Madhubani district<br />

of Bihar State. Est. Cost:<br />

`413.99 Crores<br />

Package: 1D(i-a)<br />

29.07.2011 J&K Rail Link Project –<br />

Dharam– Qazigund Section.<br />

Construction<br />

of<br />

underground drainage<br />

system from collecting<br />

chambers to disposal<br />

points at various locations<br />

with pipe thrusting<br />

(trenchless pipe jackingpipe<br />

pushing method)<br />

and laying of pipes<br />

(1200mm in diameter) in<br />

open excavation and<br />

other allied works in Zone<br />

VI; Package - M – 12R<br />

Works Awarded : SEPTEMBER 2011<br />

LOA No.<br />

and date<br />

IRCON/CC/TN/<br />

RSVY-BIHAR/11/<br />

631/579<br />

Dtd. 12.09.2011<br />

IRCON/<br />

1014/J&K-DQ/ UG<br />

Drainage Pipe Zone<br />

VI/ M-12R<br />

Dtd. 27.09.2011<br />

Contractor’s<br />

Name and<br />

address<br />

M/s BLA Projects<br />

Pvt. Ltd.,<br />

31/1, N.S.B. Road,<br />

P.O. - Raniganj,<br />

Dist. - Burdwan,<br />

(W.B.)PIN: 713 347<br />

Phone: 0341-<br />

2444163,<br />

2445194<br />

M/s Gypsum<br />

Structural India<br />

Pvt. Ltd.,<br />

185-A, Pocket-B,<br />

Mayur Vihar-II,<br />

Delhi – 110 091<br />

Quantity<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

(For Engg./Elect. /<br />

S&T/ Mech. etc<br />

Works)<br />

Rate<br />

(for supply<br />

contract)/<br />

Tendered Cost<br />

(For Engg./ Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date<br />

`413.99 `413.99 `6,12,70,964.74 06-months<br />

`10,50,45,725/- `945 Lacs `11,13,86,003.00 28.03.2012<br />

Continued...../-<br />

S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity Rate Value of Scheduled


N. No. opening Work and date Name and<br />

address<br />

3 IRCON/CC/<br />

TN/<br />

JBNRL/11/<br />

626 Dtd.<br />

10.05.2011<br />

06.06.2011 Construction of a) Station<br />

Buildings, Passenger and<br />

Goods Platform, PF<br />

Shelter/ sheds, Foot Over<br />

Bridge(FOB), tea stall,<br />

Goods Circulating Area/<br />

roads works etc., b) Staff<br />

Quarters, Guest House,<br />

Pump House, Duty Huts,<br />

Over Head Water Tank,<br />

Garages, Trolley shed,<br />

miscellaneous ancillary<br />

works including internal<br />

sanitary items, pipes etc.<br />

and any other items<br />

required to complete the<br />

above works in<br />

connection “Construction<br />

of New Broad Gauge<br />

Railway Line From<br />

Jogbani To Biratnagar<br />

(Nepal) in Indian portion<br />

from Km0.000 to<br />

Km.5.445”<br />

IRCON/2051/JBNRL/<br />

LOA/Km0.000 to<br />

5.445/Bldg/139<br />

Dt.30.09.11<br />

M/s Jay Mata Di<br />

Construction, Ward<br />

No.: 7/9, Under<br />

Araria Municipality,<br />

Araria, Police<br />

Station – Araria,<br />

District – Araria<br />

Bihar<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

(For Engg./ Elect.<br />

/S&T/ Mech. etc<br />

Works)<br />

(for supply<br />

contract)/<br />

Tendered Cost<br />

(For Engg./ Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

Contract<br />

completion<br />

date<br />

`1932.56 Lakhs `1930 Lakhs `18,14,30,484.31 15-months from the<br />

date of issue of<br />

LOA<br />

Continued...../-<br />

S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

Quantity<br />

(for supply<br />

Rate<br />

(for supply<br />

Value of<br />

Contract<br />

Scheduled<br />

completion


1 IRCON/<br />

1014/ J&K-<br />

DQ/Bridge/<br />

Pkg-10<br />

Dt.18.05.11<br />

24.06.2011 Fabrication and Supply of<br />

Steel Girders (Composite<br />

Type) for Super Structures<br />

of Bridge No: 139 & 145B<br />

for USBRL Project<br />

IRCON/1014/J&K-<br />

DQ/Bridge/Pkg-<br />

10/597<br />

Dtd. 10.10.2011<br />

address<br />

contract)/<br />

Estimated Cost<br />

(For Engg./<br />

Elect./<br />

S&T/Mech. etc<br />

Works)<br />

contract)/<br />

Tendered Cost<br />

(For Engg./<br />

Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

Works Awarded : OCTOBER 2011<br />

M/s Texmaco Rail `432.8 Lacs `3,77,91,200/- `3,77,91,200/- 09.10.2012<br />

& Engg. Ltd.,<br />

Agarpara Works,<br />

P.O. : Belgharia,<br />

Kolkatta – 700 056<br />

date<br />

2 IRCON/<br />

CC/TN/<br />

PMGSY/<br />

09/533<br />

26.08.2009 Construction/Up-gradation<br />

and Maintenance of Rural<br />

Road for five years under<br />

PMGSY<br />

From<br />

Majhwakhurd to Bairagitola<br />

(4.95 Km) and from<br />

Uchakagaon to Harpur<br />

(7.95 Km); i.e. Total 12.90<br />

Km in Block: Uchakagaon<br />

of<br />

BIHAR<br />

PkgNo: BR/13/27A<br />

Distt.-GOPLAGANJ,<br />

IRCON/2035/<br />

PMGSY/<br />

BR-13-<br />

27A/LOA/2284<br />

Dtd. 12.10.2011<br />

M/s Durga Pratap<br />

Singh<br />

Vill. - Korara,<br />

PO – Bishunpura,<br />

Mairwa,<br />

District – Siwan,<br />

Bihar<br />

`590.32 Lacs `6,78,86,694/- `6,78,86,694/- 12-months from the<br />

date of issue of<br />

LOA<br />

3 IRCON/<br />

CC/TN/<br />

PMGSY/<br />

09/570<br />

S.<br />

N.<br />

Tender<br />

No.<br />

26.08.2009 Construction and<br />

Maintenance of Road for<br />

five years under PMGSY<br />

in Block Gopalganj from<br />

Sidhwol to Zeradai via<br />

Bhaiskenal (11.30 Km)<br />

Block:Ziradei/ Hussainganj<br />

in District-SIWAN, BIHAR<br />

Package No.: BR/34/44<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

IRCON/2035/<br />

PMGSY/<br />

BR-34-<br />

44/LOA/2283 Dtd.<br />

12.10.2011<br />

LOA No.<br />

and date<br />

M/s Binod Kumar<br />

Vill. - Korara,<br />

PO – Bishunpura,<br />

Mairwa,<br />

District – Siwan,<br />

Bihar<br />

Contractor’s<br />

Name and<br />

`455.12 `6,37,17,924/- `6,37,17,924/- 12-months from the<br />

date of issue of<br />

LOA<br />

Quantity<br />

(for supply<br />

Rate<br />

(for supply<br />

Value of<br />

Contract<br />

Continued...../-<br />

Scheduled<br />

completion


4 IRCON/<br />

CC/TN/<br />

PMGSY/<br />

10/604<br />

5 Package-<br />

74R<br />

26.08.2010 Construction/Up-gradation<br />

and Maintenance of Rural<br />

Road for five years under<br />

PMGSY in Block<br />

Goplaganj from Bhityerwa<br />

to Mehdia (4.30 Km); in<br />

Block Barauli from Parsa<br />

to Balaha (5.25 Km); in<br />

Block Manjha from<br />

Bhojpurwa to Gausia (5.15<br />

Km); in Block Gopalganj<br />

from Gopalganj to<br />

Khargauli (15.00 Km); in<br />

Block Gopalganj from<br />

Baraipattiq to Niranjana<br />

(3.70 Km) and in Block<br />

Bijaypur from Bijaipur to<br />

Bilarwa (4.58 Km) i.e.<br />

Total Length = 37.98 Km<br />

in District-GOPALGANJ,<br />

BIHAR Pkg. No.: BR/13/20<br />

21.04.2011 J&K Rail Link Project -<br />

Dharam - Quazigund<br />

Section. Construction of<br />

Tunnel T-74R (between<br />

Km 125 & 134) on Dharam<br />

- Quazigund Section of<br />

Udhampur - Srinagar -<br />

Baramula New BG<br />

Railway line Project<br />

IRCON/2035/<br />

PMGSY/<br />

BR-13-<br />

20/LOA/2285 Dtd.<br />

12.10.2011<br />

IRCON/1014/J&K-<br />

DQ/Tunnel-<br />

74R/185 Dtd.<br />

19.10.2011<br />

address<br />

M/s Baibhaw<br />

Construction Pvt.<br />

Ltd.,<br />

Sareya,<br />

Ward No. - 13,<br />

Gopalganj,<br />

Bihar<br />

M/s KMB-IVRCL<br />

JV<br />

C/o IVRCL Ltd.,<br />

“The Corenthum”<br />

A-41, Tower-B,<br />

1 st Floor,<br />

Lobe No.: 4,<br />

Sector – 62,<br />

NOIDA – 201 307<br />

contract)/<br />

Estimated Cost<br />

(For Engg/Elect /S&T/<br />

Mech. etc Works)<br />

contract)/<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

date<br />

`1687.50 `21,09,38,419/- `21,09,38,419/- 12-months from the<br />

date of issue of<br />

LOA<br />

`80500 Lacs `76500.00 Lacs `761,51,81,750/- 18.10.2014<br />

S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

address<br />

Quantity<br />

(for supply<br />

contract)/<br />

Rate<br />

(for supply<br />

contract)/<br />

Value of<br />

Contract<br />

Continued...../-<br />

Scheduled<br />

completion<br />

date


6 IRCON/<br />

MECH/<br />

1029/RCF.<br />

RBL-II/Skin<br />

Tensioning<br />

/15<br />

Date<br />

07.07.11<br />

7 IRCON/<br />

MECH/<br />

1029/RCF.<br />

RBL-II/<br />

RRV/24<br />

Date<br />

07.07.2011<br />

01.08.2011 Supply AND Erection,<br />

Installation<br />

&<br />

Commissioning of 06 Nos.<br />

Skin<br />

Tensioning<br />

Equipments at Rail Coach<br />

Factory at Lalganj,<br />

Raebareli, UP-(INDIA)<br />

29.07.2011 Supply AND Erection,<br />

Installation<br />

&<br />

Commissioning of 01 No.<br />

600 MT Rail Cum Road<br />

Vehicle at Rail Coach<br />

Factory at Lalganj,<br />

Raebareli, UP<br />

LOA No.:<br />

IRCON/MECH/<br />

1029/RCF-RBL-<br />

II/Skin<br />

Tensioning/15 dtd.<br />

28.10.2011<br />

LOA No.:<br />

IRCON/MECH/<br />

1029/RCF-RBL-<br />

II/RRV/24 dtd.<br />

29.10.2011<br />

M/s Unique<br />

Industrial Handlers<br />

Pvt. Ltd.,206-207,<br />

Nahar & Seth<br />

Industrial<br />

Estate,Chakala,<br />

Andheri (E)<br />

Mumbai-400099)<br />

Tel No.:022-<br />

28390071,<br />

28352019; fax<br />

No.:022-<br />

28378226,<br />

28210006<br />

M/s Zagro Bahnund<br />

Baumaschinen<br />

GmbH, MuhlstraBe<br />

11-15 D-74906<br />

Bad Rappenau-<br />

Grombach<br />

Germany (Tel:+49<br />

(0) 7266-9168-0<br />

Estimated Cost<br />

(For Engg/Elect<br />

/S&T/ Mech. etc<br />

Works)<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

06 nos. `1,14,78,030 `6,88,68,178.80 28.03.2012<br />

01 no. `2,12,43,036/- `2,12,43,036/- 29.03.2012<br />

Continued...../-<br />

S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

Works Awarded : NOVEMBER 2011<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

address<br />

Quantity<br />

(for supply<br />

contract)/<br />

Rate<br />

(for supply<br />

contract)/<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date


Estimated Cost<br />

(For Engg/Elect<br />

/S&T/ Mech. etc<br />

Works)<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

1 IRCON/301 12.09.2011 Construction of Road<br />

5/TN/ROB-<br />

Over Bridges (ROB) as<br />

RAJ<br />

per specifications<br />

/CHHITAUR<br />

drawing & design,<br />

GARH/11/0<br />

maintaining all quality<br />

7 Dt.<br />

control standard<br />

11.08.2011<br />

complete at KM 184/13-<br />

14 on LC No. 88-B in<br />

Chittaurgarh - Udaipur<br />

section of Western<br />

Railway near Kumbha<br />

Nagar Chittaurgarh in<br />

Rajasthan State<br />

IRCON/3015/TN/<br />

ROB-RAJ/<br />

CHITTORGARH/<br />

11/07/139 Dated:<br />

01.11.2011<br />

M/s Singla<br />

Engineers &<br />

Contractors Pvt.<br />

Ltd.,<br />

D-98, Indusatrial<br />

Area, Ph-7,<br />

Mohali - 160055<br />

(Punjab)<br />

`1844 Lacs 21.42% above `22,39,91,869.00 30.06.2013<br />

2 IRCON/<br />

MECH/<br />

1029/RCF.<br />

RBL-II/Fork<br />

Lift/23<br />

Date<br />

07.07.2011<br />

28.07.2011 Supply AND Erection,<br />

Installation<br />

&<br />

Commissioning of 25 nos.<br />

3 Ton, 25 nos. 5 Ton & 2<br />

nos. 10 Ton Diesel Fork<br />

Lift Trucks at Rail Coach<br />

Factory at Lalganj,<br />

Raebareli, UP-(INDIA)<br />

IRCON/MECH/<br />

1029/RCF-<br />

RBL-II/Forklift/23<br />

dtd. 23.11.2011<br />

M/s Godrej &<br />

Boyce Mfg. Co.<br />

Ltd., Godrej<br />

Material Handling,<br />

Pirojshanagar,<br />

Vikhroli,<br />

Mumbai-400079.<br />

52 nos. (a) 3 Ton, 25<br />

nos Forklifts cost is<br />

`1,75,38,844/-<br />

(@`7,01,553.77/<br />

Forklift)<br />

(b) 5 Ton, 25<br />

nos Forklifts cost is<br />

` 3,15,52,784/-<br />

(@`12,62,111.36/<br />

Forklift)<br />

(c) 10 Ton, 2<br />

nos Forklifts cost is<br />

`42,68,975/-<br />

(@`21,34,487.50/<br />

Forklift)<br />

`5,33,60,603/- 28.02.2013<br />

Continued...../-<br />

S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

address<br />

Quantity<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

Rate<br />

(for supply<br />

contract)/<br />

Tendered Cost<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date


(For Engg/Elect<br />

/S&T/ Mech. etc<br />

Works)<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

3 IRCON/Civil<br />

/1029/RCF-<br />

RBL/10/ten<br />

der/3/ OT-<br />

18 dtd.<br />

26.07.11<br />

22.09.2011 Construction of three<br />

Sewage Treatment Plants<br />

based on SBR technology<br />

on turnkey basis at RCF-<br />

Raebareli<br />

IRCON/Civil/<br />

1029/RCF-RBL/10<br />

/tender/3/ OT-18/<br />

dtd.29.11.2011<br />

M/s ENVIRO<br />

INFRA Engineers<br />

Pvt. Ltd., 206, IInd<br />

Floor, RG Complex<br />

Community Center<br />

Sector-8, Rohini,<br />

Delhi-110089<br />

`487 Lakhs<br />

1a) STP-1-<br />

`1,84,30,000/-<br />

1b) STP-2-<br />

`2,18,25,000/-<br />

1c) STP-3-<br />

`1,06,70,000/-<br />

`540 Lakhs 28.09.2012<br />

4 IRCON/Civil<br />

/1029/RCF-<br />

RBL/10/ten<br />

der/3/ OT-<br />

19 dtd.<br />

20.09.2011<br />

01.11.2011 Construction of Wheel<br />

shop, Bogie Shop, Paint<br />

Shop, Garnet Blasting<br />

Shop, Machine Shop,<br />

Transport Shop & Shell<br />

Store of RCF Raebareli<br />

IRCON/Civil/1029/<br />

RCF-RBL/10/<br />

tender/3/ OT-19/<br />

C-155 dtd.<br />

29.11.2011<br />

M/s Era Buidsys<br />

Ltd., C-56/41,<br />

Sector 62, Noida-<br />

201303<br />

Ph.0120-4145000<br />

Fax 0120-4145030<br />

`50.95 Crore `52.55 Crore `52.55 Crore 28.09.2012<br />

5 IRCON/Civil<br />

/1029/RCF-<br />

RBL/10/ten<br />

der/3/ OT-<br />

21/<br />

dtd.<br />

26.07.11<br />

02.11.2011 Construction of Officer's<br />

Club & Guest House,<br />

Supervisor & Worker's<br />

Club & Guest House,<br />

Senior Sec. & Primary<br />

Schools, Technical<br />

Trainee & Sports Hostel,<br />

Maintenance office (5<br />

nos.), Hospital and<br />

Shopping Complex etc.,<br />

for RCF, Raebareli at<br />

Lalganj<br />

IRCON/Civil/1029/<br />

RCF-RBL/10/<br />

tender/3/ OT-21/<br />

dtd. 29.11.2011<br />

M/s Era Infra<br />

Engineering Ltd.,<br />

C-56/41, Sector<br />

62, Noida-201303<br />

Fax 0120-4145030<br />

`55.01Crores Sch.-A: 41.7%<br />

above and<br />

Sch.-B: 10.2%<br />

over basic cost<br />

`58.68 Crores 28.02.2013<br />

Continued...../-<br />

S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

address<br />

Quantity<br />

(for supply<br />

contract)/<br />

Rate<br />

(for supply<br />

contract)/<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date


Estimated Cost<br />

(For Engg/Elect<br />

/S&T/ Mech. etc<br />

Works)<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

6 IRCON/<br />

MECH/<br />

1029/RCF.<br />

RBL-II/<br />

Under<br />

Water<br />

Plasma/14<br />

Date<br />

11.08.11<br />

01.09.2011 Supply AND Erection,<br />

Installation<br />

&<br />

Commissioning of 02 Nos.<br />

CNC (under water)<br />

Plasma Profile Cutting<br />

Machines at Rail Coach<br />

Factory at Lalganj,<br />

Raebareli, UP-(INDIA)<br />

IRCON/MECH/<br />

1029/RCF-RBL-<br />

II/Under Water<br />

Plasma/14<br />

dtd. 30.11.2011<br />

M/s Soitab Implant<br />

s.r.l.,D-22,<br />

Sector - 3, NOIDA<br />

(201301)<br />

Tel:0120-<br />

4545428,29<br />

02 nos. `8,02,00,680/- `8,02,00,680/- 02.04.2012<br />

7 IRCON/Civil<br />

/1029/RCF-<br />

RBL/10/ten<br />

der/3/ OT-<br />

20 dtd.<br />

20.09.2011<br />

20.10.2011 Construction of flooring,<br />

foundations and other civil<br />

works in wheel shop,<br />

bogie shop, paint shop,<br />

transport shop and shell<br />

store of RCF Raebareli<br />

8 IRCON/CC/ 21.02.2011 Construction of Civil work<br />

TN/JBRL/11<br />

including Embankment,<br />

/618 Dtd.<br />

Side Drains, Retaining<br />

31.01.2011<br />

Walls, Blanketing, Bridges<br />

and other ancillary works<br />

in Jaynagar to Osrahi<br />

section Km 0+000 to Km<br />

2+975<br />

(Indian side Alignment portion)<br />

IRCON/Civil/1029/<br />

RCF-RBL/10/<br />

tender/3/ OT-19/<br />

C-156 dtd.<br />

30.11.2011<br />

IRCON/2050/<br />

BGL.JBB/Embk-<br />

Bridge-01(India)/<br />

Tender/1<br />

Dtd. 30.11.2011<br />

M/s Sacred<br />

Construction Pvt.<br />

Ltd., Engineers,<br />

Contractors and<br />

Fabricators, AN-<br />

29-B, Shalimar<br />

Bagh, Delhi-88<br />

M/s Jai Mata Dee<br />

Construction,<br />

Chakai<br />

Jokihat,Araria,<br />

Bihar<br />

PIN: 854 311<br />

Tel.: 06453 – 224 882<br />

FAX: 06453 – 224<br />

883<br />

`43.24 Crores `46.95 Crores `46.95 Crores 29.09.2012<br />

`813.10 Lacs `7,23,65,647.20 `7,23,65,647.20 15 Months from<br />

the date of issue<br />

of LOA<br />

Continued...../-<br />

S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

address<br />

Quantity<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

(For Engg/Elect/<br />

Rate<br />

(for supply contract)/<br />

Tendered Cost (For<br />

Engg./Elect./<br />

S&T/Mech. etc<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date


S&T/ Mech. etc<br />

Works)<br />

Works)<br />

Works Awarded : DECEMBER 2011<br />

1 IRCON/301<br />

5/TN/ROB-<br />

RAJ<br />

/BIKANER/<br />

11/06 Dt.<br />

11.08.2011<br />

12.09.2011 Construction of Road Over<br />

Bridges (ROB) as per<br />

specifications drawing &<br />

design, maintaining all<br />

quality control standard<br />

complete at Km 322.30 in<br />

lieu of LC No. 139 in<br />

Lalgarh Bikaner section of<br />

N.W. Railway near<br />

Choukhuti, Bikaner in<br />

Rajasthan State<br />

IRCON/3015/TN/<br />

ROB-<br />

RAJ/BIKANER/11/<br />

06/190<br />

Dated: 01.12.2011<br />

M/s Simplex<br />

Infrastructures Ltd.<br />

Vailunth, 2nd floor,<br />

82-83, Nehru<br />

Place, New Delhi -<br />

110019<br />

`2006 Lacs 24.56% above `24,98,79,267.00 31.07.2013<br />

2 IRCON/301<br />

5/TN/ROB-<br />

RAJ /KOTA<br />

/11/11/194<br />

Dt.<br />

11.08.2011<br />

17.10.2011 Construction of ROB<br />

(Excluding of Pile<br />

Foundation) as per<br />

specifications, drawings &<br />

design, maintaining all<br />

quality control standards<br />

complete as LC No. 108 -<br />

B at KM 918/1-2 at Kota<br />

in Rajasthan State<br />

IRCON/3015/TN<br />

/ROB-<br />

RAJ/KOTA/11/1<br />

1/194 Dated:<br />

01.12.2011<br />

M/s Harish<br />

Chandra (India)<br />

Ltd.<br />

113-A, Kamala<br />

Nagar,<br />

Delhi - 110017<br />

`2006 Lacs 1% below `19,97,94,069.00 28.02.2013<br />

3 RFP No.:<br />

IRCON/<br />

CC/TN/<br />

HSRC/<br />

HDVC/11/<br />

624Date:<br />

21.04.2011<br />

30.06.2011 Pre-feasibility study for<br />

High Speed Rail Corridors<br />

between Hyderabad -<br />

Doranakal - Vijayawada -<br />

Chennai<br />

IRCON/CC/<br />

TN/HSRC-<br />

5/HDVC/11/<br />

624/693 dtd.<br />

02.12.2011<br />

M/s Parsons<br />

Brinckerhoff India<br />

Pvt. Ltd., 3 rd<br />

Floor, A-Wing,<br />

IFCI towers, 61,<br />

Nehru Place,<br />

New Delhi-19<br />

Tel.: 011-43700200<br />

S. Tender Date of Description of Item/ LOA No. Contractor’s Quantity<br />

(for supply<br />

- - `4,62,30,687/- 06-months from<br />

the date of<br />

effectiveness of<br />

Contract<br />

Agreement<br />

Rate<br />

(for supply<br />

Value of<br />

Continued...../-<br />

Scheduled


N. No. opening Work and date Name and<br />

address<br />

contract)/<br />

Estimated Cost<br />

(For Engg/Elect<br />

/S&T/ Mech. etc<br />

Works)<br />

contract)/<br />

Tendered Cost (For<br />

Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

Contract<br />

completion<br />

date<br />

4 IRCON/<br />

ELECT/<br />

J&K-DQ/<br />

1014/T-80<br />

PSS I&II<br />

Date:<br />

19.07.2011<br />

12.09.2011 Supply, Erection, Testing &<br />

Commissioning of Electrical<br />

Sub-stations South & North<br />

Portal of T-80 Tunnel<br />

Consisting of 2x3150KVA<br />

Transformer 33KV/11KV,<br />

2x1500KVA Transformer<br />

11KV/0.433KV, 2x250KVA<br />

Transformer 11kV/0.433kV,<br />

2X1500KVA Silent DG Set<br />

along with GIS Panel,<br />

Battery Charger and other<br />

accessories at each Sub-<br />

Stations, Supply of<br />

Mandatory Spares including<br />

Annual Comprehensive<br />

Maintenance of the<br />

Installation on yearly basis<br />

after Expiry of Defects<br />

Liability Period<br />

LOA No.:<br />

IRCON/J&K-<br />

Cell/JAT/15/<br />

1014/D-Q/T-80<br />

PSS I&II/1164<br />

dtd. 03.12.2011<br />

M/s Hitech JK<br />

Engineers JV,<br />

303, Pragati<br />

Chambers,<br />

Ranjit Nagar,<br />

Commercial<br />

Complex,<br />

New Delhi – 08<br />

Tel:011-25702463<br />

FAX:011-25709321<br />

`1489.78 Lakhs `15,64,27,129/- `15,64,27,129/- 10 Months from<br />

the date of<br />

issue of LOA<br />

5 IRCON/ 04.11.2011 Construction of<br />

Civil/1029/R<br />

Administrative Building &<br />

CF-RBL/ 10/<br />

Technical Training<br />

Tender/3/<br />

OT-22 dated<br />

Centre for RCF,<br />

30.09.2011<br />

Raebareli at Lalganj.<br />

IRCON/Civil/<br />

1029/RCF-<br />

RBL/10/<br />

Tender/3/OT-22<br />

Date:07.12.2011<br />

M/s Apco Infratech<br />

Ltd.<br />

B-9, Vibhuti Khand,<br />

Gomati Nagar,<br />

Luknow- 226010<br />

Fax: 0522-2720479<br />

Email:<br />

admin@apcoinfra.com<br />

`4781 Lakhs Schedule “A”<br />

35.50 % over<br />

DSR rates<br />

Schedule “B”<br />

17.5 % above<br />

`4938.14 Lakhs 06.03.2013<br />

Fifteen Months<br />

Continued...../-<br />

S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

Quantity<br />

(for supply<br />

contract)/<br />

Rate<br />

(for supply<br />

contract)/ Tendered<br />

Value of<br />

Contract<br />

Scheduled<br />

completion


address<br />

Estimated Cost<br />

(For Engg/Elect<br />

/S&T/ Mech. etc<br />

Works)<br />

Cost (For Engg./<br />

Elect. /S&T/Mech.<br />

etc Works)<br />

date<br />

6 IRCON/CC<br />

/TN/SR/<br />

11/623 Dt.<br />

05.04.2011<br />

31.05.2011 Detailed Design<br />

Consultancy, 3D<br />

Monitoring & Supervision<br />

of Tunnel T-5 (Between<br />

Km 11+671 to Km<br />

13+764) & Tunnel T-6<br />

(Between Km 14+934 to<br />

Km18+884)<br />

in<br />

connection with<br />

Construction of Sivok<br />

(West Bengal) to Rangpo<br />

(Sikkim) new Single line<br />

BG Railway Line Project<br />

IRCON/2046/<br />

SRRP/DDC/<br />

Tunnel/<br />

T5-T6/23/299<br />

Dtd. 09.12.2011<br />

M/s AECOM<br />

Asia Co. Ltd.,<br />

9 th Floor, Infinity<br />

Tower C, DLF<br />

Cyber City, DLF<br />

Phase-II,<br />

Guragon-122 002<br />

`1653 Lakhs - USD 27,06,762<br />

and<br />

INR 6,88,12,861/-<br />

36-months from<br />

the date of<br />

issue of LOA<br />

7<br />

IRCON/ELE<br />

CT<br />

/1029/RCF-<br />

RBL/ CSS-<br />

750/22<br />

18.10.2011 Supply, Installation,<br />

Testing<br />

and<br />

Commissioning of 750KVA<br />

11/0.433kV Compact<br />

Substations at RCF,<br />

Raebareli (Uttar Pradesh)<br />

IRCON/ELECT<br />

/1029/RCF-RBL/<br />

CSS-750/22 dtd<br />

16.12.2011<br />

M/s. NKG<br />

Infrastructure<br />

Limited, 124,<br />

Ground Floor,<br />

World Trade<br />

Centre Road,<br />

Connaught Place,<br />

New Delhi-01<br />

`340 Lakhs `312 Lakhs `312 Lakhs 4 months for<br />

date of LOA.<br />

8 IRCON/Civil<br />

/1029/RCF-<br />

RBL/Tender<br />

/ASS/7000/<br />

07 Dt.<br />

29.09.2011<br />

S.<br />

N.<br />

Tender<br />

No.<br />

20.10.2011 Construction of Auxiliary<br />

Sub-Station Buildings in<br />

Factory Area in<br />

Date of<br />

opening<br />

connection with<br />

construction of Rail<br />

Coach Factory Raebareli,<br />

Lalganj, Raebareli(UP)<br />

Description of Item/<br />

Work<br />

IRCON/Civil/1029/<br />

RCF-RBL/1040/<br />

1337<br />

Date: 19.12.2011<br />

LOA No.<br />

and date<br />

M/s Sacred<br />

Constructions Pvt.<br />

Ltd., Engineers &<br />

Contractors &<br />

Fabricators, AN-<br />

29-B, Shalimar<br />

Bagh, Delhi-088<br />

Contractor’s<br />

Name and<br />

`564.32 Lakhs Sch- A 2.95%<br />

above , and<br />

Sch- B 2.95%<br />

above basic<br />

cost + 43%<br />

Quantity<br />

(for supply contract)/<br />

Estimated Cost (For<br />

Rate<br />

(for supply contract)/<br />

Tendered Cost (For<br />

`580.98 Lakhs 18.08.2012<br />

Value of<br />

Contract<br />

Continued...../-<br />

Scheduled<br />

completion


address<br />

Engg/Elect /S&T/<br />

Mech. etc Works)<br />

Engg./Elect. /S&T/Mech.<br />

etc Works)<br />

date<br />

9 IRCON/<br />

ELECT/1029<br />

/RCF-<br />

RBL/Shell<br />

Shop/28<br />

08.12.2011 Supply, installation, testing &<br />

commissioning of electrical<br />

power distribution system<br />

including Lighting in Shell<br />

Fabrication shop at New Rail<br />

Coach Factory, Rae Bareli<br />

ELECT/ 1029/RCF-<br />

RBL/Shell Shop/28<br />

dtd 21.12.11<br />

M/s Sterling &<br />

Wilson Limited,<br />

C-56/38,<br />

Institutional Area,<br />

Sector-62, Noida,<br />

PIN - 201307<br />

`1748 Lakhs `1423 Lakhs `1423 Lakhs 12 months form<br />

the date of issue<br />

of LOA<br />

10 IRCON/<br />

Civil/1029/<br />

RCF-RBL/<br />

10/Tender/3<br />

/OT-23<br />

dated<br />

04.11.2011<br />

30.11.2011 Construction of external<br />

Sewerage, Drainage and<br />

Water supply works<br />

including Overhead<br />

Water Tanks for the Rail<br />

coach Factory Raebareli<br />

complex at Lalganj<br />

IRCON/Civil/1029/<br />

RCF-RBL/10/<br />

Tender/3/OT-23<br />

Date: 21.12.2011<br />

M/s Envirad-Brij (JV)<br />

Avadhpuri Road,<br />

6- Lakhanpur,<br />

Kanpur-208024<br />

Fax: 0512-<br />

2582532,Email:<br />

contact@epplindia.net<br />

`3422 Lakhs Schedule “A”<br />

29.0 % over<br />

DSR rates<br />

Schedule<br />

“AT PAR”<br />

“B”<br />

`3324.29 Lakhs 20.03.2013<br />

Fifteen Months<br />

11 IRCON/ 18.11.2011 Construction of Bituminous<br />

Civil/1029/R<br />

and concrete roads for the<br />

CF-RBL/10/<br />

Rail Coach Factory<br />

Tender/3/O<br />

Raebareli complex at<br />

T-24 Dt.<br />

Lalganj.<br />

18.11.2011<br />

IRCON/Civil/102<br />

9/RCF-RBL/10/<br />

Tender/3/OT-23<br />

Date:21.12.2011<br />

M/s RG Buildwell<br />

Engineers Ltd.,<br />

R-13/84,<br />

Raj Nagar,<br />

Ghaziabad (U.P.)<br />

`43.63 Crores Schedule A<br />

22.8 % above<br />

the DSR (2007)<br />

Schedule B<br />

At the following<br />

item rates<br />

Item no. 1 @<br />

`1350/-per cum<br />

Item no. 2 @<br />

`230/- per cum<br />

Item no. 3 @<br />

`1580/-per cum<br />

Item no. 4 @<br />

`2050/-per cum<br />

Item no. 5 @ `35/-<br />

per sqm<br />

Item no. 6 @<br />

`11.5 per sqm<br />

`38.34 Crores 10.01.2013<br />

12 months<br />

Continued...../-<br />

S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

Quantity<br />

(for supply<br />

Rate<br />

(for supply<br />

Value of<br />

Contract<br />

Scheduled<br />

completion


address<br />

contract)/<br />

Estimated Cost<br />

(For Engg/Elect<br />

/S&T/ Mech. etc<br />

Works)<br />

contract)/<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc<br />

Works)<br />

date<br />

12 IRCON/EL<br />

ECT/1029/<br />

RCF-RBL/<br />

Misc<br />

Shop/35<br />

21.12.2011 Supply, Installation,<br />

Testing & Commissioning<br />

of Electrical Power<br />

Distribution System<br />

including Lighting in<br />

Bogie, Wheel, Paint, Mill<br />

Write & Transport Shops<br />

at New Rail Coach<br />

Factory, Rae Bareli (U.P.)<br />

IRCON/ELECT/<br />

1029/RCF-RBL/<br />

Misc Shop/35 dtd<br />

28.12.2012<br />

M/s Sudhir Power<br />

Projects Limited,<br />

507, International<br />

Trade Tower,<br />

Nehru Place, New<br />

Delhi-110019<br />

`1540 Lakhs `1248 Lakhs `1248 Lakhs 12 months form<br />

the date of issue<br />

of LOA<br />

13 IRCON/ 03.10.2011 Supply and Erection,<br />

MECH/<br />

Installation<br />

&<br />

1029/RCF.<br />

Commissioning of<br />

RBL-II/<br />

Complete Painting System<br />

Paint<br />

for Railway Passenger<br />

Plant/26<br />

Coaches at Rail Coach<br />

dtd.<br />

Factory at Lalganj,<br />

08.09.2011<br />

Raebareli, UP-(INDIA)<br />

LOA No.:<br />

IRCON/MECH/<br />

1029/RCF-RBL-<br />

II/Paint<br />

Plant/26/651 dtd.<br />

30.12.2011<br />

M/s Taikisha<br />

Engineering Pvt.<br />

Ltd.,404,Udyog<br />

Phase IV<br />

Gurgaon-122015<br />

(Haryana)<br />

Ph.no.0124-<br />

2348247<br />

01 no. `32,09,93,492/- `32,09,93,492/- 30.08.2012<br />

Works Awarded : JANUARY 2012


S.<br />

N.<br />

Tender<br />

No.<br />

Date of<br />

opening<br />

Description of Item/<br />

Work<br />

LOA No.<br />

and date<br />

Contractor’s<br />

Name and<br />

address<br />

Quantity<br />

(for supply<br />

contract)/<br />

Estimated Cost<br />

(For Engg/Elect /S&T/<br />

Mech. etc Works)<br />

Rate<br />

(for supply<br />

contract)/<br />

Tendered Cost<br />

(For Engg./Elect.<br />

/S&T/Mech. etc Works)<br />

Value of<br />

Contract<br />

Scheduled<br />

completion<br />

date<br />

1 IRCON/<br />

Civil/1029/<br />

RCF-RBL/10/<br />

Tender/3/OT-<br />

24<br />

dtd.18.11.11<br />

20.12.2011 Construction of<br />

Bituminous and concrete<br />

roads for the Rail Coach<br />

Factory Raebareli<br />

complex at Lalganj<br />

IRCON/Civil/1029<br />

/RCF-RBL/10/<br />

Tender/3/OT-24<br />

dtd. 11.01.2012<br />

M/s RG Buildwell<br />

Engineers Ltd.,<br />

Ghaziabad<br />

`4363.00 Lacs `3834 Lacs `3834 Lacs 10.01.2013<br />

2 IRCON/J&K 24.11.2011 Construction of<br />

Cell/ JAT/<br />

miscellaneous works<br />

including rigid pavements,<br />

14/1014/<br />

RCC retaining/ breast walls,<br />

D-Q/Misc.<br />

Sewerage & water Supply<br />

Works<br />

System, Drainage Works,<br />

M-17/199<br />

Pathways, UG water tanks,<br />

dtd.02.11.11<br />

Pump House and other<br />

related works at Banihal Yard<br />

in Dharma-Qazigund section<br />

of USBRL project (J&K)<br />

(Package-M-17)<br />

IRCON/J&K Cell/<br />

JAT/ 14/1014/<br />

D-Q/Misc. Works<br />

M-17/199<br />

dtd.16.01.2012<br />

M/s M. M. Shawl,<br />

Chinar<br />

Commercial<br />

Complex, The<br />

Bund, Residency<br />

Road, Srinagar,<br />

Kashmir – 190004<br />

Tel.: 0194 –<br />

2477506, 2400153<br />

Fax: 0194 -<br />

2480625<br />

`1211.00 Lacs Schedule – 'A' 68%<br />

above BOQ Rates<br />

Schedule – 'B' 79%<br />

above BOQ Rates<br />

Schedule – 'C' 72%<br />

above BOQ Rates<br />

Schedule – 'D' 40%<br />

above BOQ Rates<br />

`11,56,86,820.03<br />

12-months from<br />

the date of<br />

issue of LOA<br />

3 IRCON/100<br />

8/J&K-Cell/<br />

JAT/ GRP<br />

Barracks-<br />

Awantipura/<br />

GRP-19R<br />

dtd.03.11.11<br />

25.11.2011 Construction of 111<br />

Bedded GRP Barracks<br />

and other miscellaneous<br />

works such as<br />

Compound wall, Chain<br />

Link Fencing etc., at<br />

Awantipora Railway<br />

station Yard (GRP-19R)<br />

on Quazigund –<br />

Baramulla New BG<br />

Railway Line Project<br />

(J&K)<br />

IRCON/1008/J&K-<br />

Cell/ JAT/ GRP<br />

Barracks-<br />

Awantipora/GRP-<br />

19R dtd.16.01.12<br />

M/s Hi-Tech<br />

Engineers, 65,<br />

East Extension,<br />

M.E.T. Road,<br />

Baghat Barzulla,<br />

Srinagar –<br />

190005<br />

(Kashmir)<br />

Mob.:<br />

9419067835<br />

Fax:0194-<br />

2433600<br />

Schedule-A :<br />

`13103460.25<br />

Schedule-B :<br />

`8681483.50<br />

Schedule-C :<br />

`513494.80<br />

Schedule-D :<br />

`100022.50<br />

Schedule-E :<br />

`5678148.90<br />

Schedule-F:`500000/-<br />

Schedule-G:`623120/-<br />

Schedule-H:`1116474/-<br />

+32.00% above<br />

BOQ Rates<br />

+60.00% above<br />

BOQ Rates<br />

+29.00% above<br />

BOQ Rates<br />

+80.00% above<br />

BOQ Rates<br />

+20.00% above<br />

BOQ Rates<br />

At Par<br />

+20% above BOQ Rates<br />

+18% above BOQ Rates<br />

`4,14,08,351.92<br />

06-months from<br />

the date of<br />

issue of LOA<br />

S.<br />

N.<br />

Tender No.<br />

Date of<br />

opening<br />

Description of Item/ Work<br />

LOA No.<br />

and date<br />

Contractor’s Name and<br />

address<br />

Quantity<br />

(for supply contract)/<br />

Estimated Cost (For<br />

Rate<br />

(for supply contract)/<br />

Tendered Cost<br />

Value of Contract<br />

Scheduled completion<br />

date


Engg/Elect /S&T/ Mech.<br />

etc Works)<br />

(For Engg./Elect.<br />

/S&T/Mech. etc Works)<br />

4 IRCON/ 12.09.2011 Supply and Erection,<br />

MECH/1029<br />

Installation<br />

&<br />

/RCF.RBL-II<br />

Commissioning of 03<br />

/TRAVERS<br />

Nos. (50MT) & 04 Nos.<br />

ER/007<br />

(80MT) Traversers<br />

dtd.11.08.11<br />

Machines. at Rail Coach<br />

Factory at Lalganj,<br />

Raebareli, UP-(INDIA)<br />

IRCON/MECH/<br />

1029/RCF-RBL-<br />

II/Traverser/007/<br />

739 dated<br />

27.01.12<br />

M/s Unique<br />

Industrial Handlers<br />

Pvt Ltd, 206-207,<br />

Nahar & Sheth<br />

Industrial Estate,<br />

Chakala, Andheri(E)<br />

Mumbai-400099<br />

Tel.:022-28390071,<br />

28352019<br />

FAX: 022-28378226,<br />

28210006<br />

03 Nos. (50MT)<br />

&<br />

04 Nos. (80MT)<br />

03 Nos. 50MT =<br />

`4,61,03,540/-<br />

04 Nos. 80MT =<br />

`7,80,60,999/-<br />

and<br />

Spares =<br />

`17,29,000/-<br />

`12,58,93,538/- 20.01.2013<br />

5 IRCON/ 15.12.2011 Design, supply, installation<br />

ELECT/1029<br />

testing and commissioning of<br />

/RCF-RBL/<br />

all electrical equipment<br />

MRS<br />

related to 4 sets of standby<br />

Diesel Generator Sets of<br />

ELECT/34<br />

1010kVA, 11kV with<br />

Dt.25.11.11<br />

Synchronising control panels,<br />

U/ground fuel storage tank,<br />

Civil and all associated works<br />

at Rail Coach Factory, Rae<br />

Bareli (U.P.)<br />

IRCON/ELECT/<br />

1029/RCF-RBL/<br />

1010 KVA DG/34<br />

dated 31.01.2012<br />

M/s Sterling &<br />

Wilson Powergen<br />

Limited, A-7,<br />

Sector-6, Noida<br />

`605.00 Lacs `596 Lacs `596 Lacs 6-months from<br />

the date of<br />

issue of LOA<br />

6 IRCON/<br />

1014/J&K.<br />

DQ/<br />

Consultancy<br />

Tunnels<br />

Km.110-<br />

125/186<br />

dated<br />

09.09.2011<br />

02.11.2011 Detailed Design<br />

Consultancy of all structures<br />

including Tunnels, bridges<br />

/viaducts, Station Yards and<br />

associated works and<br />

Construction Supervision of<br />

Tunnels between km 110 &<br />

km 125 in connection with<br />

Construction of Dharam-<br />

Qazigund Section of<br />

Udhampur-Srinagar-<br />

Baramulla New BG Railway<br />

Line Project.<br />

IRCON/1014/J&K.<br />

DQ/Consultancy<br />

Tunnels/Km.110-<br />

125/186 dated<br />

31.01.2012<br />

Ms/ Bernard<br />

Ingenieure ZT<br />

GmbH,<br />

BahnhofstraBe<br />

19, A-6060. Hall<br />

in Tirol, Austria<br />

Tel:+43 (0) 5223/<br />

5840-0<br />

Fax:+43 (0)<br />

5223/ 5840-201<br />

`4878.00 Lacs `4878.00 Lacs EURO48,76,906.79<br />

and INR<br />

`19,17,73,050.40<br />

30.01.2016

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!