address<br />

Estimated Cost<br />

(For Engg/Elect<br />

/S&T/ Mech. etc<br />

Works)<br />

Cost (For Engg./<br />

Elect. /S&T/Mech.<br />

etc Works)<br />

date<br />

6 IRCON/CC<br />

/TN/SR/<br />

11/623 Dt.<br />

05.04.2011<br />

31.05.2011 Detailed Design<br />

Consultancy, 3D<br />

Monitoring & Supervision<br />

of Tunnel T-5 (Between<br />

Km 11+671 to Km<br />

13+764) & Tunnel T-6<br />

(Between Km 14+934 to<br />

Km18+884)<br />

in<br />

connection with<br />

Construction of Sivok<br />

(West Bengal) to Rangpo<br />

(Sikkim) new Single line<br />

BG Railway Line Project<br />

IRCON/2046/<br />

SRRP/DDC/<br />

Tunnel/<br />

T5-T6/23/299<br />

Dtd. 09.12.2011<br />

M/s AECOM<br />

Asia Co. Ltd.,<br />

9 th Floor, Infinity<br />

Tower C, DLF<br />

Cyber City, DLF<br />

Phase-II,<br />

Guragon-122 002<br />

`1653 Lakhs - USD 27,06,762<br />

and<br />

INR 6,88,12,861/-<br />

36-months from<br />

the date of<br />

issue of LOA<br />

7<br />

IRCON/ELE<br />

CT<br />

/1029/RCF-<br />

RBL/ CSS-<br />

750/22<br />

18.10.2011 Supply, Installation,<br />

Testing<br />

and<br />

Commissioning of 750KVA<br />

11/0.433kV Compact<br />

Substations at RCF,<br />

Raebareli (Uttar Pradesh)<br />

IRCON/ELECT<br />

/1029/RCF-RBL/<br />

CSS-750/22 dtd<br />

16.12.2011<br />

M/s. NKG<br />

Infrastructure<br />

Limited, 124,<br />

Ground Floor,<br />

World Trade<br />

Centre Road,<br />

Connaught Place,<br />

New Delhi-01<br />

`340 Lakhs `312 Lakhs `312 Lakhs 4 months for<br />

date of LOA.<br />

8 IRCON/Civil<br />

/1029/RCF-<br />

RBL/Tender<br />

/ASS/7000/<br />

07 Dt.<br />

29.09.2011<br />

S.<br />

N.<br />

Tender<br />

No.<br />

20.10.2011 Construction of Auxiliary<br />

Sub-Station Buildings in<br />

Factory Area in<br />

Date of<br />

opening<br />

connection with<br />

construction of Rail<br />

Coach Factory Raebareli,<br />

Lalganj, Raebareli(UP)<br />

Description of Item/<br />

Work<br />

IRCON/Civil/1029/<br />

RCF-RBL/1040/<br />

1337<br />

Date: 19.12.2011<br />

LOA No.<br />

and date<br />

M/s Sacred<br />

Constructions Pvt.<br />

Ltd., Engineers &<br />

Contractors &<br />

Fabricators, AN-<br />

29-B, Shalimar<br />

Bagh, Delhi-088<br />

Contractor’s<br />

Name and<br />

`564.32 Lakhs Sch- A 2.95%<br />

above , and<br />

Sch- B 2.95%<br />

above basic<br />

cost + 43%<br />

Quantity<br />

(for supply contract)/<br />

Estimated Cost (For<br />

Rate<br />

(for supply contract)/<br />

Tendered Cost (For<br />

`580.98 Lakhs 18.08.2012<br />

Value of<br />

Contract<br />

Continued...../-<br />

Scheduled<br />

completion