A DETAILS OF CONTRACTS PLACED BY OPEN TENDER - Ircon ...
A DETAILS OF CONTRACTS PLACED BY OPEN TENDER - Ircon ...
A DETAILS OF CONTRACTS PLACED BY OPEN TENDER - Ircon ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
address<br />
Estimated Cost<br />
(For Engg/Elect<br />
/S&T/ Mech. etc<br />
Works)<br />
Cost (For Engg./<br />
Elect. /S&T/Mech.<br />
etc Works)<br />
date<br />
6 IRCON/CC<br />
/TN/SR/<br />
11/623 Dt.<br />
05.04.2011<br />
31.05.2011 Detailed Design<br />
Consultancy, 3D<br />
Monitoring & Supervision<br />
of Tunnel T-5 (Between<br />
Km 11+671 to Km<br />
13+764) & Tunnel T-6<br />
(Between Km 14+934 to<br />
Km18+884)<br />
in<br />
connection with<br />
Construction of Sivok<br />
(West Bengal) to Rangpo<br />
(Sikkim) new Single line<br />
BG Railway Line Project<br />
IRCON/2046/<br />
SRRP/DDC/<br />
Tunnel/<br />
T5-T6/23/299<br />
Dtd. 09.12.2011<br />
M/s AECOM<br />
Asia Co. Ltd.,<br />
9 th Floor, Infinity<br />
Tower C, DLF<br />
Cyber City, DLF<br />
Phase-II,<br />
Guragon-122 002<br />
`1653 Lakhs - USD 27,06,762<br />
and<br />
INR 6,88,12,861/-<br />
36-months from<br />
the date of<br />
issue of LOA<br />
7<br />
IRCON/ELE<br />
CT<br />
/1029/RCF-<br />
RBL/ CSS-<br />
750/22<br />
18.10.2011 Supply, Installation,<br />
Testing<br />
and<br />
Commissioning of 750KVA<br />
11/0.433kV Compact<br />
Substations at RCF,<br />
Raebareli (Uttar Pradesh)<br />
IRCON/ELECT<br />
/1029/RCF-RBL/<br />
CSS-750/22 dtd<br />
16.12.2011<br />
M/s. NKG<br />
Infrastructure<br />
Limited, 124,<br />
Ground Floor,<br />
World Trade<br />
Centre Road,<br />
Connaught Place,<br />
New Delhi-01<br />
`340 Lakhs `312 Lakhs `312 Lakhs 4 months for<br />
date of LOA.<br />
8 IRCON/Civil<br />
/1029/RCF-<br />
RBL/Tender<br />
/ASS/7000/<br />
07 Dt.<br />
29.09.2011<br />
S.<br />
N.<br />
Tender<br />
No.<br />
20.10.2011 Construction of Auxiliary<br />
Sub-Station Buildings in<br />
Factory Area in<br />
Date of<br />
opening<br />
connection with<br />
construction of Rail<br />
Coach Factory Raebareli,<br />
Lalganj, Raebareli(UP)<br />
Description of Item/<br />
Work<br />
IRCON/Civil/1029/<br />
RCF-RBL/1040/<br />
1337<br />
Date: 19.12.2011<br />
LOA No.<br />
and date<br />
M/s Sacred<br />
Constructions Pvt.<br />
Ltd., Engineers &<br />
Contractors &<br />
Fabricators, AN-<br />
29-B, Shalimar<br />
Bagh, Delhi-088<br />
Contractor’s<br />
Name and<br />
`564.32 Lakhs Sch- A 2.95%<br />
above , and<br />
Sch- B 2.95%<br />
above basic<br />
cost + 43%<br />
Quantity<br />
(for supply contract)/<br />
Estimated Cost (For<br />
Rate<br />
(for supply contract)/<br />
Tendered Cost (For<br />
`580.98 Lakhs 18.08.2012<br />
Value of<br />
Contract<br />
Continued...../-<br />
Scheduled<br />
completion