A DETAILS OF CONTRACTS PLACED BY OPEN TENDER - Ircon ...
A DETAILS OF CONTRACTS PLACED BY OPEN TENDER - Ircon ...
A DETAILS OF CONTRACTS PLACED BY OPEN TENDER - Ircon ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
S.<br />
N.<br />
Tender<br />
No.<br />
4 IRCON/100<br />
8/J&K-<br />
DLI/Quarter<br />
s-<br />
Budgam/Q-<br />
7R<br />
Dt.18.05.11<br />
Date of<br />
opening<br />
Description of Item/<br />
Work<br />
18.05.2011 Construction of RPF<br />
Quarters Type-II, III and<br />
IV units at Budgam<br />
Railway Station on<br />
Qazigund - Baramulla<br />
New BG Rail Line<br />
Project(J&K)<br />
(Package: Q – 7R)<br />
LOA No.<br />
and date<br />
IRCON/1008/J&K-<br />
DLI/Quarters-<br />
Budgam/Q-7R/122<br />
Dt.30.06.11<br />
Works Awarded : JUNE 2011<br />
Contractor’s<br />
Name and<br />
address<br />
M/s Star<br />
Constructions, 1 st<br />
Floor, AI-Noor<br />
Complex,<br />
Hyderpora, Bypass<br />
(West), Srinagar,<br />
Kashmir-190014<br />
Mob.:<br />
09419001145,<br />
09419006074,<br />
FAX: 0194-<br />
2430631<br />
Quantity<br />
(for supply<br />
contract)/<br />
Estimated Cost<br />
(For<br />
Engg./Elect.<br />
/S&T/ Mech. etc<br />
Works)<br />
Rate<br />
(for supply<br />
contract)/<br />
Tendered Cost<br />
(For Engg./Elect.<br />
/S&T/Mech. etc<br />
Works)<br />
Value of<br />
Contract<br />
Scheduled<br />
completion<br />
date<br />
`506 Lakhs `506 Lakhs `5,66,67,665.99 06-months from the<br />
date of issue of<br />
LOA<br />
Works Awarded : JULY 2011<br />
S.<br />
N.<br />
Tender<br />
No.<br />
Date of<br />
opening<br />
Description of Item/<br />
Work<br />
LOA No.<br />
and date<br />
Contractor’s<br />
Name and<br />
address<br />
NIL<br />
Quantity<br />
(for supply<br />
contract)/<br />
Estimated Cost<br />
(For<br />
Engg./Elect.<br />
/S&T/ Mech. etc<br />
Works)<br />
Rate<br />
(for supply<br />
contract)/<br />
Tendered Cost<br />
(For Engg./Elect.<br />
/S&T/Mech. etc<br />
Works)<br />
Value of<br />
Contract<br />
Scheduled<br />
completion<br />
date<br />
Continued...../-