20.04.2015 Views

FINAL Report - Hutchinson River Restoration Project

FINAL Report - Hutchinson River Restoration Project

FINAL Report - Hutchinson River Restoration Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sites 1 & 2 Co Op City Einstein Loop (also referred to as Site 7 when combined as one site)<br />

Site 2<br />

Site 1<br />

Two additional candidate sites were identified in Co-op City on the west shore of the <strong>Hutchinson</strong> in the Einstein Loop neighborhood. Site 1 and 2 occurs<br />

along the western shoreline of the <strong>Hutchinson</strong> <strong>River</strong>, adjacent to recreation areas, northeast of the AmTrack bridge on the southeastern corner of Co-Op City<br />

and would front on Erskine Place. . The property is owned/controlled by the <strong>River</strong>bay Corporation.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!