Phase 4 – <strong>ward</strong> 11a reconfiguration<br />
Project Costs<br />
• Total Cost (inc. VAT) £2,224m<br />
• Contingency & Optimism Bias (inc VAT)<br />
£238k = 13.2% of works Also includes<br />
£262k enablers<br />
• Net Present Cost of scheme = £2.277m<br />
(over 30 years)