Draft Waste Minimisation Plan - Palmerston North City Council
Draft Waste Minimisation Plan - Palmerston North City Council
Draft Waste Minimisation Plan - Palmerston North City Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Undertake as part of Rubbish &<br />
Recycling operating activities in<br />
2010/11<br />
Strategy 2 Collection of residual waste<br />
Aims 2.1 Residual rubbish collection<br />
To ensure that residual waste is collected in a safe, efficient manner, and disposed of hygienically and in a manner that has a minimal<br />
environmental impact.<br />
Objectives Actions<br />
2.1.1 To review service types and delivery options for the<br />
collection of domestic, commercial and industrial, and<br />
public open space wastes<br />
2.1.1 (a) Initiate a review of the service types and<br />
delivery options for the collection of wastes<br />
Recommended<br />
Timeframe<br />
July 2010<br />
<strong>Draft</strong> 10 Year <strong>Plan</strong> Provision<br />
Undertake as part of Rubbish &<br />
Recycling operating activities in<br />
2010/11<br />
Funding included within<br />
Rubbish & Recycling operating<br />
budget.<br />
2.1.2 To consider the Health and Safety implications of<br />
continuing with the rubbish bag collection system<br />
2.1.1 (b) Continue the user pays kerbside refuse bag<br />
system until a review is completed.<br />
2.1.2 (a) Consider as part of review.<br />
On-going<br />
On-going<br />
<strong>Waste</strong> <strong>Minimisation</strong> <strong>Plan</strong> 2009 - DRAFT What Will We Do 12<br />
2.1.3 To investigate options for the provision of a kerbside,<br />
‘wheelie bin’, domestic waste collection service.<br />
Strategy 3 Disposal of residual waste<br />
Aim 3.1 General <strong>Waste</strong> Disposal<br />
2.1.3 (a) Consider as part of review.<br />
On-going<br />
Undertake as part of Rubbish &<br />
Recycling operating activities in<br />
2010/11<br />
To ensure that residual waste is disposed of in the most cost effective, sanitary and environmentally acceptable manner as possible.<br />
Recommended<br />
Objectives Actions<br />
<strong>Draft</strong> 10 Year <strong>Plan</strong> Provision<br />
Timeframe<br />
3.1.1 To make sure that community needs are being met<br />
for the disposal of residual waste.<br />
Aim 3.2 Cleanfill<br />
3.1.1 (a) Review availability, cost and operation of<br />
landfills utilised as part of regular plan review process.<br />
To provide services and funding that encourage the avoidance of material being placed in cleanfills<br />
3.2.1 To ensure that only appropriate material is<br />
cleanfilled.<br />
Objectives Actions<br />
3.2.2 To ensure that cleanfills are being appropriately<br />
managed<br />
3.2.1 (a) Quantify the source and volumes of materials<br />
being cleanfilled<br />
3.2.2 (a) Consider options for the diversion of this material<br />
from dumping<br />
On-going<br />
Recommended<br />
Timeframe<br />
Undertake as part of Rubbish &<br />
Recycling operating activities in<br />
2010/11<br />
<strong>Draft</strong> 10 Year <strong>Plan</strong> Provision<br />
Currently no provision.<br />
Present for next review of<br />
10 Year <strong>Plan</strong> (2012/22).<br />
Currently no provision.<br />
Present for next review of<br />
10 Year <strong>Plan</strong> (2012/22).