<strong>Inspection</strong> Checklist – <strong>Drainage</strong><br />

BCA T-30t<br />

Ver: 2<br />

Date: 22/07/2010<br />

Address:<br />

Building Consent No.:<br />

Tradesperson:<br />

Tradesperson:<br />

Reg.No.: Contact Details: Reg. No.: Contact Details:<br />

Date:<br />

Time:<br />

Item to be inspected for compliance:<br />

with the Building Act 2004,<br />

NZBC & Approved Documents<br />

G12, G13, G14 & AS/NZS 3500.2.2:2003,<br />

AS/NZS 1546.1:1998<br />

Conditions of consent/site instructions read?<br />

Proposed plans sighted?<br />

Identify type of systems<br />

Pipe sizes 2<br />

Main drain<br />

Branch sizes<br />

Branch drains over 10m vented<br />

Gradient for 100mm pipe 3<br />

Gradient for 65mm pipe 4<br />

Branches enter at grade 5<br />

<strong>Inspection</strong> points/openings 6<br />

Level inverts installed correctly 7<br />

Provision for vent(s) identified<br />

Joints primed and cemented<br />

As laid plans recorded<br />

Drains bedded in granular fill<br />

Drain under water test observed 8<br />

Discharge pipes sealed through foundation<br />

ORG/Gully traps 9<br />

Gully trap installed?<br />

Gully trap charged 10<br />

Water Toby location in accordance with<br />

Water Supply Bylaw<br />

Stormwater 11<br />

Pipe size 12<br />

Outcome 1<br />

Pass<br />

N/A<br />

Fail<br />

Staged/Partial <strong>Inspection</strong>:<br />

Details of <strong>Inspection</strong> & Comments:<br />

Comments must be made for:<br />

1. Non-complying Items<br />

2. Items/work deviates from approved documents<br />

3. Detail alternative solution & how compliance achieved<br />

Yes/No<br />

Yes/No<br />

AS/NZ 3500.2.2:2003 / G13<br />

Gradient:<br />

Gradient:<br />

Yes/No<br />

mm<br />

mm<br />

mm<br />

mm<br />

mm<br />

Yes/No<br />

Discharge pipe/ Hose tap/ HWC relief drain<br />

Discharge to main / kerb / lift sump (450mm) 13<br />

Rodding points/ access points 14<br />

Y junctions @ 45° 15<br />

Soak pit as per plans 16<br />

Liner perforated<br />

Paved areas and sumps discharge to<br />

approved outfall<br />

Septic Tank 17<br />

Sited as per plan<br />

Fresh air inlet<br />

Risers above finished ground level<br />

Effluent Disposal<br />

Design matches as laid plans<br />

Siting<br />

Minimum 3m from boundaries<br />

Minimum 20m from watercourse<br />

Minimum 3m from house<br />

Stormwater cut off drain<br />

mm<br />

mm<br />

of<br />

<strong>Inspection</strong> - <strong>Drainage</strong>.<strong>DOC</strong><br />

Page 1 of 2


<strong>Inspection</strong> Checklist – <strong>Drainage</strong><br />

BCA T-30t<br />

Ver: 2<br />

Date: 22/07/2010<br />

Item to be inspected for compliance:<br />

with the Building Act 2004,<br />

NZBC & Approved Documents<br />

G12, G13, G14 & AS/NZS 3500.2.2:2003,<br />

AS/NZS 1546.1:1998<br />

Water Tanks<br />

Siting as per plans<br />

Overflow piped to approved water course<br />

Notes 18 :<br />

Outcome 1<br />

Pass<br />

N/A<br />

Fail<br />

Details of <strong>Inspection</strong> & Comments:<br />

Comments must be made for:<br />

1. Non-complying Items<br />

2. Items/work deviates from approved documents<br />

3. Detail alternative solution & how compliance achieved<br />

Amended plans required? Yes/No Officer:<br />

Amended specifications required?<br />

Yes/No<br />

Reinspection required? Yes/No Signed:<br />

Site instruction issued?<br />

Yes/No<br />

<strong>Drainage</strong> inspection passed? Yes/No Date:<br />

1 Pass = Compliance with approved plans & documentation, N/A = Not applicable to this project, Fail = Non-compliance with approved plans &<br />

documentation.<br />

2 AS/NZS 3500.2.2:2003 3.3 Size of drains Table 3.2 / G13 3.5 Table 2<br />

3 100mm (1:100 = 10mm/m, 1:80 = 12mm/m, 1:60 = 16mm/m)<br />

4 65mm : 25mm/metre<br />

5 AS/NZS 3500.2.2:2003 4.9.1 Branches shall enter at the top of main drains<br />

6 AS/NZS 3500.2.2:2003 Section xxxx<br />

7 AS/NZS 3500.2.2:2003 Figs. 3.1, 3.3.5<br />

8 water test held sound<br />

9 AS/NZS 3500.2.2:2003 Section 4.4.6<br />

10 AS/NZS 3500.2.2:2003 Section 4.6.3<br />

11 NZBC E1 AS1<br />

12 NZBC E1 AS1Section 3.1<br />

13 AS/NZS 3500.2.2:2003 Section 3.4.2 Fig. 6<br />

14 AS/NZS 3500.2.2:2003 Section 3.7<br />

15 AS/NZS 3500.2.2:2003 Section 3.3.2 Fig. 5<br />

16 NZBC E1 VM 1 Section 9<br />

17 AS/NZS 1546:1998<br />

18 Note any additional information, including safety issues<br />

<strong>Inspection</strong> - <strong>Drainage</strong>.<strong>DOC</strong><br />

Page 2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!