9.3 Length<br />
It is anticipated that the Main Body of the EIS will run to approximately 50 pages of A3 text not including<br />
graphics, and that the appendices will run to several hundred A3 pages.<br />
10 Membership and management of the EIA team<br />
Erm21c Ltd Project Management, EIA management, and EIS production<br />
Project Manager: Axel Fabritius<br />
Energy Engineering James J. Nolan, Sean Wyse<br />
Civil Engineering Brian Walsh, Niall Fitzsimons & Co.<br />
Soils and Geology Robert Meehan<br />
Hydrology Robert Meehan<br />
Archaeologist Maurice Hurley<br />
Noise & Vibration Dixon Brosnan<br />
Ecology Dixon Brosnan<br />
11 Work plan and resourcing for the environmental studies<br />
• Baseline studies commenced June 2008<br />
• Project defined June 2008<br />
• Pre-<strong>planning</strong> consultations to be completed 30th September 2008<br />
• EIS to be completed 30th September 2008<br />
• Anticipated Planning Application 1st week October 2008<br />