08.05.2015 Views

URANIUM CORPORATION OF INDIA LIMITED - (UCIL).....

URANIUM CORPORATION OF INDIA LIMITED - (UCIL).....

URANIUM CORPORATION OF INDIA LIMITED - (UCIL).....

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(b)<br />

(c)<br />

(d)<br />

(e)<br />

A series of leaching tests of ore<br />

samples of Banduhurang mine<br />

collected from different depth were<br />

carried out to optimize the<br />

parameters of conventional acid<br />

leaching through extensive analysis<br />

of ore samples, leached residues and<br />

leach liquor.<br />

Whole rock analysis of uranium ore<br />

of Bagjata ore was determined.<br />

Variation of leachability of ore of<br />

Narwpahar was observed under<br />

different pH and temperature<br />

condition.<br />

Study on effect of oxidants was<br />

carried out by conducting leaching<br />

tests using different oxidants<br />

pyrolusite, Potassium Permanganate<br />

and Hydrogen Peroxide.<br />

2. Benefits derived as a result of the above<br />

R&D work:<br />

a) The data generated on lab scale and<br />

pilot scale provided the thrust for<br />

better recovery of uranium from<br />

Banduhurang uranium ore.<br />

b) Studies on water dissolution of<br />

uranium and other elements from<br />

Tummalapalle uranium ore have<br />

great significance to plan<br />

environmental management system.<br />

3. Future Plan of Action:<br />

a) Planning has been made to conduct<br />

the detail studies on Tummalapalle<br />

Uranium ore and confirming the<br />

batch scale data of pilot plant by<br />

using continuous leach reactor.<br />

b) Solvent extraction and ion exchange<br />

studies on purification and<br />

concentration of uranium leach<br />

liquors.<br />

c) Study on various raw materials to<br />

optimize its use and to find out new<br />

substitutes.<br />

d) Monitoring the plant to improve the<br />

efficiency at every stage.<br />

e) Development of modified analytical<br />

procedures for the analysis of<br />

uranium and other elements.<br />

4. Expenditure on R&D:<br />

(a) Capital Rs. 42.78 lakh<br />

(b) Revenue Rs. 122.19 lakh<br />

Total Rs. 164.97 lakh<br />

5. Technology Absorption, Adaptation and<br />

Innovation:<br />

The company has taken steps in the field of<br />

uranium mining and milling to absorb latest<br />

available technology to improve productivity<br />

and making the operations more cost<br />

effective. Some of them are –<br />

(a) Future machines with digital<br />

technologies are generally selected for<br />

reducing the power consumption.<br />

(b)<br />

(c)<br />

(d)<br />

The spares for the energy efficient<br />

imported machines are under<br />

development by indigenous suppliers.<br />

Introduction of long hole/extension<br />

drilling using Drill Jumbo for<br />

exploration of ore body.<br />

Introduction of mechanized roof<br />

bolting using ‘Boltec (drill & bolting<br />

jumbo)’.<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!