CHARLES ALFARO, PE<br />
Highway Engineer<br />
<strong>Metric</strong> <strong>Engineering</strong>, Inc. – July 2010 - Present<br />
US 1 Bayside Shared Use Path, Monroe County, Florida – Design of a shared use path<br />
adjacent to the north side of US 1 from approximately mile marker106 to mile marker 99.5.<br />
Services also include drainage, surveying, impacts to wetlands, permitting and MOT. Client:<br />
Monroe County, FL, Contact: Judith Clarke, PE (305)292-4329, Begin/End Dates: October<br />
26, 2011-Ongoing<br />
On-Call Professional <strong>Engineering</strong> Services, Monroe County, Florida - Provide<br />
transportation engineering design services for road and bridge construction and rehabilitation<br />
projects, including design, traffic studies, lighting and signalization, permitting, drainage<br />
engineering, assisting with review of contractor bids, environmental engineering including<br />
environmental assessments water quality studies and structural engineering services<br />
including facility inspections and assessments and rehabilitation and/or retrofit of County<br />
facilities and buildings. Client: Monroe County, FL Contact: Clark Briggs (305) 295-4306,<br />
Begin/End Dates: January 2010 – Ongoing<br />
North Roosevelt Boulevard, Key West, Florida - Lighting and signal design for 3 miles of<br />
SR-A1A North Roosevelt Blvd. from Truman Avenue to US-1. Client: FDOT District 6,<br />
Contact: Ali Toghiani, PE (305) 470-5343, Begin/End Dates: August 2006 – Ongoing,<br />
Role: Project Manager<br />
Northlake Boulevard from Seminole Pratt to Coconut Road in Palm Beach County,<br />
Florida – Preliminary and final roadway design, drainage design and permitting of a 3.4-mile<br />
reconstruction project. Client: Palm Beach County, Contact: Kristine Frazell-Smith, PE (561)<br />
478-5777, Begin/End Dates: May 2008 – Ongoing, Role: Project Manager<br />
Haverhill Road and Dyer Blvd. Intersection Improvements, Palm Beach County, Florida<br />
- Improvements to the intersection of Haverhill Road & Dyer Boulevard, 0.68 miles, including<br />
modifications to the drainage system and addition of a permanent outfall to canal EPB-9.<br />
Client: Palm Beach County, Contact: Basher Khan, PE (561) 684-4191. Begin/End Dates:<br />
December 2008 – Ongoing, Role: Project Manager<br />
Hypoluxo Road and I-95 Intersection Improvements, Palm Beach County, Florida -<br />
Improvements to the intersection of Hypoluxo Road & I-95 (0.24 miles). Client: Palm Beach<br />
County, Contact: Serge Jerome, PE (561) 684-4150 Begin/End Dates: July 2010 –<br />
Ongoing, Role: Project Manager<br />
US 1 from SW 168 th Street to SW 136 Street, Miami-Dade County, FL - Resurfacing,<br />
Restoration and Rehabilitation (RRR), 2.26 miles, including pavement milling and<br />
resurfacing, minor intersection improvements, upgrading of ADA ramps, minor signalization<br />
improvements and new signing and pavement markings. Client: FDOT District 6, Contact:<br />
Hong Benitez, PE (305) 470-5471, Begin/End Dates: October 2010 – Ongoing, Role:<br />
Project Manager<br />
Sanchez-Zeineli & Associates, Inc. (*) May 2005-July 2010<br />
SR-5/US-1 Federal Highway from Young Circle to Sheridan Street – Lead project<br />
engineer responsible for the design of the roadway and signing and pavement markings<br />
plans for this 1.3 mile RRR project. After <strong>com</strong>pletion of the first design phase of this project,<br />
the FDOT added a second design phase consisting of replacing the existing lighting system<br />
along the corridor with decorative light poles including pedestrian features and banners. The<br />
second phase also includes the addition of new sections of median with landscape and<br />
irrigation. Client: FDOT D-4, Contact: Mr. James Hughes, P.E. 954-777-4419, Begin/End<br />
Dates: March 2006 – Present, Role: Lead Project Engineer<br />
South Roosevelt Boulevard (US-1) from Bertha Street to Sta. 41+10 – Project Engineer<br />
assisting in the preparation of the roadway and signing and pavement markings plans for this<br />
0.9 -mile project which includes a <strong>com</strong>plete roadway reconstruction with new drainage and<br />
lighting for a major four lane facility in the City of Key West. This project also includes the<br />
design of a new shared used path. Client: City of Key West, Contact: Mr. Roland Flowers<br />
(305) 809-3975, Begin/End Dates: April 2005-Present, Role: Project Engineer<br />
(*) SZA was acquired by <strong>Metric</strong> <strong>Engineering</strong>, Inc. on July 2010<br />
EDUCATION:<br />
Masters of Business<br />
Administration, Florida<br />
International University,<br />
2003<br />
B.S.C.E., Florida<br />
International University,<br />
2000<br />
PROFESSIONAL<br />
REGISTRATIONS:<br />
Florida PE #61411, 2004<br />
YEARS OF<br />
EXPERIENCE:<br />
10 years<br />
PROFESSIONAL<br />
EXPERIENCE:<br />
Mr. Alfaro has over 10<br />
years of experience in the<br />
preparation of the design<br />
and production of roadway,<br />
drainage, signing and<br />
pavement markings, signal,<br />
and lighting plans for<br />
projects from FDOT, Miami-<br />
Dade County, and other<br />
municipalities. Mr. Alfaro<br />
also has extensive<br />
experience in preparing<br />
drainage reports to be<br />
submitted to DERM for<br />
approval on Miami-Dade<br />
County. He is intimately<br />
familiar with roadway<br />
design and drainage<br />
requirements for Miami-<br />
Dade County Public Works<br />
Department’s and FDOT<br />
plans preparation criteria.<br />
He also has broad<br />
experience preparing<br />
construction cost estimates<br />
and schedules for a wide<br />
variety of projects.<br />
CERTIFICATIONS:<br />
Advanced Maintenance of<br />
Traffic,<br />
OFFICE LOCATION:<br />
Miami