12.05.2015 Views

Metric Engineering - KeyWestCity.com

Metric Engineering - KeyWestCity.com

Metric Engineering - KeyWestCity.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHARLES ALFARO, PE<br />

Highway Engineer<br />

<strong>Metric</strong> <strong>Engineering</strong>, Inc. – July 2010 - Present<br />

US 1 Bayside Shared Use Path, Monroe County, Florida – Design of a shared use path<br />

adjacent to the north side of US 1 from approximately mile marker106 to mile marker 99.5.<br />

Services also include drainage, surveying, impacts to wetlands, permitting and MOT. Client:<br />

Monroe County, FL, Contact: Judith Clarke, PE (305)292-4329, Begin/End Dates: October<br />

26, 2011-Ongoing<br />

On-Call Professional <strong>Engineering</strong> Services, Monroe County, Florida - Provide<br />

transportation engineering design services for road and bridge construction and rehabilitation<br />

projects, including design, traffic studies, lighting and signalization, permitting, drainage<br />

engineering, assisting with review of contractor bids, environmental engineering including<br />

environmental assessments water quality studies and structural engineering services<br />

including facility inspections and assessments and rehabilitation and/or retrofit of County<br />

facilities and buildings. Client: Monroe County, FL Contact: Clark Briggs (305) 295-4306,<br />

Begin/End Dates: January 2010 – Ongoing<br />

North Roosevelt Boulevard, Key West, Florida - Lighting and signal design for 3 miles of<br />

SR-A1A North Roosevelt Blvd. from Truman Avenue to US-1. Client: FDOT District 6,<br />

Contact: Ali Toghiani, PE (305) 470-5343, Begin/End Dates: August 2006 – Ongoing,<br />

Role: Project Manager<br />

Northlake Boulevard from Seminole Pratt to Coconut Road in Palm Beach County,<br />

Florida – Preliminary and final roadway design, drainage design and permitting of a 3.4-mile<br />

reconstruction project. Client: Palm Beach County, Contact: Kristine Frazell-Smith, PE (561)<br />

478-5777, Begin/End Dates: May 2008 – Ongoing, Role: Project Manager<br />

Haverhill Road and Dyer Blvd. Intersection Improvements, Palm Beach County, Florida<br />

- Improvements to the intersection of Haverhill Road & Dyer Boulevard, 0.68 miles, including<br />

modifications to the drainage system and addition of a permanent outfall to canal EPB-9.<br />

Client: Palm Beach County, Contact: Basher Khan, PE (561) 684-4191. Begin/End Dates:<br />

December 2008 – Ongoing, Role: Project Manager<br />

Hypoluxo Road and I-95 Intersection Improvements, Palm Beach County, Florida -<br />

Improvements to the intersection of Hypoluxo Road & I-95 (0.24 miles). Client: Palm Beach<br />

County, Contact: Serge Jerome, PE (561) 684-4150 Begin/End Dates: July 2010 –<br />

Ongoing, Role: Project Manager<br />

US 1 from SW 168 th Street to SW 136 Street, Miami-Dade County, FL - Resurfacing,<br />

Restoration and Rehabilitation (RRR), 2.26 miles, including pavement milling and<br />

resurfacing, minor intersection improvements, upgrading of ADA ramps, minor signalization<br />

improvements and new signing and pavement markings. Client: FDOT District 6, Contact:<br />

Hong Benitez, PE (305) 470-5471, Begin/End Dates: October 2010 – Ongoing, Role:<br />

Project Manager<br />

Sanchez-Zeineli & Associates, Inc. (*) May 2005-July 2010<br />

SR-5/US-1 Federal Highway from Young Circle to Sheridan Street – Lead project<br />

engineer responsible for the design of the roadway and signing and pavement markings<br />

plans for this 1.3 mile RRR project. After <strong>com</strong>pletion of the first design phase of this project,<br />

the FDOT added a second design phase consisting of replacing the existing lighting system<br />

along the corridor with decorative light poles including pedestrian features and banners. The<br />

second phase also includes the addition of new sections of median with landscape and<br />

irrigation. Client: FDOT D-4, Contact: Mr. James Hughes, P.E. 954-777-4419, Begin/End<br />

Dates: March 2006 – Present, Role: Lead Project Engineer<br />

South Roosevelt Boulevard (US-1) from Bertha Street to Sta. 41+10 – Project Engineer<br />

assisting in the preparation of the roadway and signing and pavement markings plans for this<br />

0.9 -mile project which includes a <strong>com</strong>plete roadway reconstruction with new drainage and<br />

lighting for a major four lane facility in the City of Key West. This project also includes the<br />

design of a new shared used path. Client: City of Key West, Contact: Mr. Roland Flowers<br />

(305) 809-3975, Begin/End Dates: April 2005-Present, Role: Project Engineer<br />

(*) SZA was acquired by <strong>Metric</strong> <strong>Engineering</strong>, Inc. on July 2010<br />

EDUCATION:<br />

Masters of Business<br />

Administration, Florida<br />

International University,<br />

2003<br />

B.S.C.E., Florida<br />

International University,<br />

2000<br />

PROFESSIONAL<br />

REGISTRATIONS:<br />

Florida PE #61411, 2004<br />

YEARS OF<br />

EXPERIENCE:<br />

10 years<br />

PROFESSIONAL<br />

EXPERIENCE:<br />

Mr. Alfaro has over 10<br />

years of experience in the<br />

preparation of the design<br />

and production of roadway,<br />

drainage, signing and<br />

pavement markings, signal,<br />

and lighting plans for<br />

projects from FDOT, Miami-<br />

Dade County, and other<br />

municipalities. Mr. Alfaro<br />

also has extensive<br />

experience in preparing<br />

drainage reports to be<br />

submitted to DERM for<br />

approval on Miami-Dade<br />

County. He is intimately<br />

familiar with roadway<br />

design and drainage<br />

requirements for Miami-<br />

Dade County Public Works<br />

Department’s and FDOT<br />

plans preparation criteria.<br />

He also has broad<br />

experience preparing<br />

construction cost estimates<br />

and schedules for a wide<br />

variety of projects.<br />

CERTIFICATIONS:<br />

Advanced Maintenance of<br />

Traffic,<br />

OFFICE LOCATION:<br />

Miami

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!