17.11.2012 Views

References

References

References

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hörmann Funkwerk Kölleda<br />

<strong>References</strong>


Inhaltsverzeichnis<br />

1 Mobile radio systems 3<br />

1.1 Analogue Mobile Radio – Train Radio 2002 (mobile and stationary systems; 450 MHz)<br />

1.1.1 Germany<br />

1.1.1.1 Mobile Systems<br />

1.1.1.2 Tracks and Dispatching stations<br />

1.1.2 Export<br />

3<br />

3<br />

3<br />

3<br />

4<br />

1.2 Digital Mobile Radio GSM-R 5<br />

1.2.1 Deutschland GSM-R für Deutsche Bahn AG 5<br />

1.2.2 Schwiterland 6<br />

1.2.3 Frankreich 7<br />

1.2.4 Belgium GSM-R for SNCB 8<br />

1.2.5 Italy 8<br />

1.2.6 Spain 9<br />

1.2.7 Austria GSM-R for ÖBB 9<br />

1.2.8 Sweden 10<br />

1.2.9 Netherlands 11<br />

1.2.10 Norwegen 11<br />

1.2.11 Hungaria 12<br />

1.2.12 Further <strong>References</strong> GSM-R and Dual-Mode 12<br />

2 Stationary Communication systems 14<br />

2.1 Dispaching centers 14<br />

2.2 Communication Systems / ESTW DIKOS 210 und 310 16<br />

2.2.1 Railway 16<br />

2.2.1.1 Germany 16<br />

2.2.1.2 Export 19<br />

2.2.2 Waterway administrations 20<br />

2.2.3 Fraport AG 21<br />

2.2.4 Private Railways 21<br />

2.2.5 Export 21<br />

2.2.6 Other 21<br />

2.2.7 Public Customers ( Systemhaus Technik) 21<br />

2.3 Passenger Information and Public Address Systems 22<br />

2.4 Public address systems / electro-acoustics 26<br />

2.5 Cable projects and miscellaneous stationary communication systems 28<br />

3 Mobile Communication Systems 32<br />

3.1 Akustisches Fahrgastinformationssystem LAR 32<br />

3.2 Board computer SMC / FMC 33<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 2 / 36


1 Mobile radio systems<br />

1.1 Analogue Mobile Radio – Train Radio 2002 (mobile and stationary<br />

systems; 450 MHz)<br />

1.1.1 Germany<br />

1.1.1.1 Mobile Systems<br />

Delivery, assembly, installation and service of mobile systems (MESA 2002)<br />

equipment of 7.200 vehicles with train radio systems MESA 2002<br />

� ICE 3<br />

� E-engines<br />

� V-engines<br />

� railcars<br />

� specific vehicles<br />

� vehicles of private railways<br />

1.1.1.2 Tracks and Dispatching stations<br />

1997<br />

Delivery, assembly, installation and service of mobile systems (MESA 2002)<br />

equipment of 7.200 vehicles with train radio systems MESA 2002<br />

Main contractor of Deutsche Bahn AG (German Railways) for tracks to be equipped with train<br />

radio systems and the corresponding services.<br />

� Express route Hanover – Berlin<br />

section Staaken – Ruhleben ordered by SIEMENS Berlin<br />

� Saalebahn 1. phase Saalfeld – Probstzella<br />

Ordered by ARCOR Erfurt<br />

Planning, delivery and installation of radio systems for operation and maintenance<br />

� Erfurt - Sömmerda - Artern<br />

ordered by ARCOR Erfurt<br />

Planning, delivery, assembly and installation of radio systems for operation,<br />

maintenance and shunting radio<br />

construction of concrete masts and concrete switching boxes<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 3 / 36


1998 - 2000<br />

2001 - 2002<br />

1.1.2 Export<br />

� UZ Ruhleben<br />

ordered by SIEMENS Berlin<br />

� ESTW (electronic interlocking station) Saalfeld (workstation dispatcher) connected to<br />

dispatching station (BL) Erfurt<br />

ordered by ARCOR Erfurt<br />

� ESTW (electronic interlocking station) Sömmerda (workstation dispatcher) connected to<br />

BL Erfurt<br />

ordered by ARCOR Erfurt<br />

� BO Wittenberg (train driver centre) connected to BL Halle<br />

ordered by Bosch Telecom<br />

� ESTW (electronic interlocking station) Salzwedel<br />

� Leipzig – Dresden project 9 with ESTW (electronic interlocking station) Wurzen<br />

� Staaken - Oebisfelde project 4 (1. BA)<br />

� SPNV Gotha – Leinefelde<br />

� Halle/Leipzig – Berlin<br />

� Hamburg - Berlin<br />

� Saalebahn<br />

� Knot Erfurt<br />

� Weimar-Göschwitz-Jena-Glauchau<br />

(Chemnitz)<br />

� SPNV Halle – Halberstadt<br />

� SPNV Leinefelde – Gotha<br />

� Knot Magdeburg<br />

� Interim signal box Schwerin<br />

� ESTW Grünauer Kreuz<br />

Delivery, assembly, installation and service of stationary and mobile systems<br />

850 devices to:<br />

� Bulgaria<br />

specific tunnel radio track (16 Tunnel)<br />

� Czech Republic<br />

� Switzerland<br />

� Austria<br />

� China<br />

1997 test track of 215 km Neijiang - Chengdu<br />

� Romania<br />

� Ireland<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 4 / 36


1.2 Digital Mobile Radio GSM-R<br />

1.2.1 Deutschland<br />

GSM-R für Deutsche Bahn AG<br />

Costomer<br />

End user<br />

Network environment<br />

Volume<br />

Realisation<br />

► Supply of Dual Mode Train Radio solution including analogue and digital radio<br />

modes. The analogue train radio module implements analogue modes, e.g. for<br />

Austria, Belgium, Czech Republic, France, Luxembourg, Netherlands and<br />

Switzerland.<br />

Nortel Networks Germany GmbH<br />

Deutsche Bahn AG<br />

Nortel<br />

10.000 Terminals, 15.000 MMIs<br />

1999 - 2006<br />

Together with Nortel Networks<br />

Germany GmbH, HÖRMANN<br />

Funkwerk Kölleda GmbH designed<br />

the dual mode train radio in<br />

compliance with GSM-R -EIRENE/<br />

MORANE specification. The project<br />

includes not only the delivery of train<br />

radio but also engineering,<br />

commissioning, first of class<br />

installation and after sales service.<br />

In 2002, the first high speed railway<br />

line on the ICE-track Cologne-<br />

Rhine/Main operating under GSM-R<br />

coverage was inaugurated. All trains in the line were equipped with GSM-R train radio from<br />

HFWK. Up to today, 10,000 train radio terminals have been delivered to the German<br />

Railways. The actual production capacity amounts to 550 terminals per month. Additionally,<br />

HFWK equipped with ETCS cab radios trains running in the ETCS test line in the Leipzig<br />

area.<br />

► Train Radio Terminals and Operating Devices for Deutsche Bahn AG<br />

According to the requirements of Deutsche Bahn AG Funkwerk developed different variants<br />

which are chosen depending on place of installation, train type and requested features. The<br />

different configurations are determined by:<br />

� environmental conditions of installation<br />

temperature; protection grade etc.<br />

� interfaces to the train MVB, RS422, UIC etc.<br />

� applications<br />

analogue voice radio; GSM-R voice radio; data services etc.<br />

MTRS 1 RIH / MESA 23-02<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 5 / 36


1.2.2 Schwiterland<br />

Costomer /End user<br />

Network environment<br />

Volume<br />

Realisation<br />

Costomer<br />

End user<br />

Network environment<br />

Project<br />

Volume<br />

Realisation<br />

► The operating device of MESA 23<br />

The operating device of MESA 23 provides both modes - analogue and digital (GSM-R) train<br />

radio. It is available in variants as follows:<br />

� Standard operating device MMIS and<br />

� ICE operating device MMIE<br />

Standard operating device MMIS<br />

► Central unit MESA 25-01: ZG25-1 for SBB<br />

By order of the Swiss Railways (SBB) a new generation of cab radios (GSM-R CAB Radio<br />

MESA 25-01) is developed, based on the already successfully integrated and reliable type<br />

series MESA. By integration of current new developments and adaptation to the Swiss train<br />

technology - requirements of the SBB will be met for a sophisticated, innovative cab radio<br />

with high stability.<br />

The GSM-R application is compliant to EIRENE/MORANE specifications.<br />

Central unit MESA 25-01: ZG25-1<br />

SBB Swiss Railways<br />

Siemens<br />

1.500 Terminals, 2.000 MMI’s<br />

2004 – 2008<br />

► ETCS test line Olten - Luzern als - SBB<br />

Supply of an ETCS cab radio integrating<br />

Power Supply and FFFIS interface to the EVC<br />

on board. Installation engineering on different<br />

train types.<br />

Bombardier<br />

SBB Swiss Railways<br />

Siemens<br />

Test Line ETCS Level 2: Zofingen - Zempach<br />

60 Terminals<br />

2000 – 2003<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 6 / 36


1.2.3 Frankreich<br />

Partner<br />

End user<br />

Network environment<br />

Volume<br />

Realisation<br />

Milestones of the project:<br />

► Development and Supply of Cab Radios Dual-Mode and Mono-Mode fort he<br />

consortium Alstom – Funkwerk<br />

Alstom Transportation<br />

SNCF<br />

Nortel<br />

9.000 Terminals, 12.000 MMIs<br />

2002 - 2014<br />

Supply of a new analogue train radio module. The analogue train radio module implements<br />

all French and Belgium analogue features.<br />

Supply of a dual mode MMI, analogue and GSM-R train radio application. Supply of test<br />

equipment.<br />

MESA 24F MMI<br />

� Project start: May 2002<br />

� First MMI-Prototyp: August 2002<br />

� First Rack-Prototyp: December 2002<br />

� First “Cab Radio“-Prototyp: July 2003<br />

� First pre-series supply: November 2003<br />

� First series supply: July 2004<br />

� Roll-out: 2004 - 2014<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 7 / 36


1.2.4 Belgium<br />

GSM-R for SNCB<br />

Costomer<br />

End user<br />

Network environment<br />

Volume<br />

Realisation<br />

Milestones of the projektes:<br />

1.2.5 Italy<br />

Costomer<br />

Project<br />

Realisation<br />

► Devolopment and supply of GSM-R Cab Radios for SNCB<br />

Supply of a complete dual mode GSM-R and analogue train radio system. The analogue train<br />

radio module implements all French and Belgian analogue features.<br />

The GSM-R application is compliant to EIRENE/MORANE specifications.<br />

MESA 24B-B (Mono block) MESA 24B MMI-B/R<br />

Siemens Belgium<br />

SNCB<br />

Siemens<br />

2.100 Terminals, 3.500 MMIs<br />

2003 – 2009<br />

Project start: June 2003<br />

First prototyp: July 2004<br />

First roll-out: January 2005<br />

Roll-out: 2005 - 2009<br />

► Supply of GSM-R Cab Radios (Ansaldo)<br />

for High Speed Aliance Line with ETCS Level 2, Test installation of „ETCS Cab Radio“.<br />

Ansaldo Signalling, Genova<br />

Integration tests to ETCS Ansaldo EVC on-board.<br />

2003<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 8 / 36


1.2.6 Spain<br />

Costomer and user<br />

Network environment<br />

Project<br />

Volume<br />

Realisation<br />

Follow-up order<br />

Realisation<br />

1.2.7 Austria<br />

GSM-R for ÖBB<br />

Customer and End-user<br />

Volume<br />

Realisation<br />

Versions<br />

► ETCS and voice for Ansaldo-Group<br />

Supply of a voice and ETCS redundant cab radio. This solution integrates the ETCS and<br />

voice application optimising the use of MMIs.<br />

The redundant ETCS MMI is used in the first instance for GSM-R voice application. The<br />

system solution proposed offers a fall-back capability for the voice security functionalities like<br />

emergency call and intercom in case the ETCS MMI redundant will be switched on to the<br />

ETCS application.<br />

DMI-Adapter (Driver Machine Interface)<br />

CSEE, Ansaldo Group<br />

Siemens<br />

Line Madrid - Zaragoza ETCS Level 2<br />

24 Cab Radios for 12 trains<br />

2003<br />

87 Single Mode Cab Radios<br />

from 2007<br />

► Order – Supply of GSM-R Cab Radios for ÖBB Austrian Railways<br />

Supply of dual mode cab radios MESA 23 for refitting of several ÖBB train type series.<br />

According to the different type-specific train installation locations varied types of Funkwerk<br />

cab radios will be installed.<br />

The GSM-R application is compliant to EIRENE/MORANE specifications..<br />

MTRS 1+A RSH / MESA 23-03<br />

ÖBB Austrian Railways<br />

222 terminals, 424 MMIs<br />

2004 – 2006<br />

of MESA 23:<br />

- MTRS 1+A RSH<br />

- MTRS 1+A RIH<br />

- MMIS<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 9 / 36


1.2.8 Sweden<br />

Costomer and end user<br />

Network environment<br />

Volume<br />

Realisation<br />

Costomer and end user<br />

Network environment<br />

Volume<br />

Realisation<br />

Costomer and end user<br />

Network environment<br />

Volume<br />

Realisation<br />

► GSM-R for A-Train AB (Arlanda Express)<br />

Since 2006 A-Train AB - Operator of the Arlanda Express - is also using Funkwerk’s MESA<br />

23, the widespread and highly demanded Train Radio System all over Europe. Arlanda<br />

Express is a high-speed train connecting Stockholm’s central station with the airport<br />

Stockholm-Arlanda since 1999.<br />

The GSM-R application fulfils the EIRENE/MORANE specifications.<br />

MESA 23-05: MTRS 1 RS<br />

A-Train AB (Operator von Arlanda Express)<br />

Siemens<br />

7 systems MESA 23 (MTRS 1 RS)<br />

2006<br />

► GSM-R for Green Cargo<br />

Green Cargo as the biggest freight operator in Scandinavia has decided to order Funkwerk’s<br />

technology, too. The already signed contract contains delivery and installation of the GSM-R<br />

Cab Radio MESA 23 GTM+ including appropriate services.<br />

The GSM-R application is compliant to EIRENE/MORANE specifications.<br />

GTM with connector for second MMI<br />

Green Cargo AB<br />

Siemens<br />

336 units GTM+, 231 MMIs<br />

2005 - 2007<br />

► GSM-R for Alstom and Bombardier<br />

Funkwerk overtook the Swedish cab radio technology for supplying the Swedish Railway<br />

market. The Swedish solution implements GSM-R voice train radio according to MORANE<br />

specifications.<br />

Swedisch Cab Radio CAB II<br />

Green Cargo AB<br />

Siemens<br />

235 units<br />

2004 - 2006<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 10 / 36


1.2.9 Netherlands<br />

Costomer<br />

End user<br />

Network environment<br />

Volume<br />

Realisation<br />

1.2.10 Norwegen<br />

Cotomer<br />

Network environment<br />

Volume<br />

Realisation<br />

Cotomer<br />

Network environment<br />

Volume<br />

Realisation<br />

► Lieferung von GSM-R Cab Radios<br />

KPN<br />

Railion<br />

Siemens<br />

120 units (Single- and Dual-Mode)<br />

2005 - 2006<br />

► GSM-R Cab Radios for Norwegian CargoNet<br />

Supply of GSM-R cab radios MESA 23 in the construction variant Box.<br />

MTRS 1BS / MESA 23-04<br />

CargoNet<br />

Siemens<br />

80 Terminals<br />

2005 -2007<br />

► GSM-R Cab Radios for NSB Norway<br />

Supply of GSM-R cab radios basing on the already successfully integrated and reliable type<br />

series MESA. By integration of current new developments - requirements of the NSB will be<br />

met for a sophisticated, innovative cab radio with high stability.<br />

The GSM-R application is compliant to EIRENE/MORANE specifications.<br />

Central unit MESA 25-02: ZG25-2<br />

NSB AS<br />

Siemens<br />

400 Terminals<br />

2005 -2007<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 11 / 36


1.2.11 Hungaria<br />

Costomer<br />

Network environment<br />

Project<br />

Realisation<br />

► Supply of a GSM-R cab radio for the GSM-R test track in Hungary.<br />

The faultless operation and the fulfilment of all functions were confirmed in a test report by the<br />

MÁV.<br />

MAV Hungarian Railways<br />

Siemens<br />

Test track in Bekeszaba<br />

2002<br />

1.2.12 Further <strong>References</strong> GSM-R and Dual-Mode<br />

► Bombardier: Type Series ”TALENT“ for ÖBB - Austrian Railways<br />

- 186 Cab Radios MESA 23<br />

► Bombardier: Type Series ”TALENT” for MAV - Hungarian Railways<br />

- 10 Cab Radios MESA 23<br />

► Bombardier: Motor Coaches for CFL - Luxembourg Railways<br />

- 18 Cab Radios MESA 23<br />

► Bombardier Germany: RIU-ETCS for RENFE - Spanish Railways<br />

- 200 Data Radios RIU-ETCS, Realisation: from 2005<br />

► Nortel India: ZFM04 for Easter Railways<br />

Easter Railways: Indian Railways<br />

- 10 Train Radio Systems ZFM04, Realisation: 2005<br />

► RFF: RECBridge for SNCF: French Railways<br />

- 60 RECBridges, Realisation: from 2005<br />

► Siemens: Type Series 2016 for ÖBB - Austrian Railways<br />

- 16 Cab Radios MESA 23<br />

► Siemens: Type Series 642 for ÖBB - Austrian Railways<br />

- 30 Dual Mode systems MESA 23<br />

- 40 Dual Mode systems MESA 23<br />

► Siemens: ZFM04 for ÖBB - Austrian Railways<br />

- 400 Train Radio Systems ZFM04, Realisation: from 2004<br />

► SIEMENS Transportation Systems, Limited: MT for NS Reiziger<br />

- 1800 GSM-R - Modules MT, Realisation: 2003-2005<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 12 / 36


► Stadler: RM - Regional Transport Mittelland (CH)<br />

- 11 Dual Mode systems MESA 23<br />

► Stadler: Type Series “FLIRT“<br />

- 84 Cab Radios MESA 23 for SBB<br />

- 20 Cab Radios MESA 23 for the project “NOH”<br />

► Stadler: Type Series ”TILO”<br />

- 26 Cab Radios MESA 23<br />

► Stadler: Type Series “FLIRT“ for MÁV - Hungarian Railways<br />

- 30 Cab Radios MESA 23<br />

► Vossloh Spain: Type Series “EURO4000“<br />

- 12 Cab Radios MESA 23<br />

► Arriva<br />

- 36 Cab Radios MESA 23 for Type Series ”FLIRT“<br />

► Butzbach-Licher Eisenbahn AG today: Hessischen Landesbahn GmbH - HLB<br />

- 33 Dual Mode systems MESA 23<br />

► Connexxion<br />

- 6 Cab Radios MESA 23 for Type Series “PROTOS“<br />

► Nedtrain<br />

- 120 cab radios MESA 23 for type series “G2000”<br />

- 60 Cab Radios MESA 23 for type series “Class 66”<br />

- 60 cab radios MESA 23 for track laying machinery<br />

► Syntus<br />

- 46 Cab Radios MESA 23 for Type Series “LINT“<br />

► Zenitel: EMS-ISDN for DSB: Danish Railways<br />

- 20 EMS-ISDN<br />

Realisation: from 2004<br />

► Italy<br />

- 94 Cab Radios MESA 23<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 13 / 36


2 Stationary Communication systems<br />

2.1 Dispaching centers<br />

with integrated passenger information and public address<br />

► 7 dispatching centres in Germany – equipped by Funkwerk<br />

Funkwerk has equipped the dispatching centres with a modern telecommunication system for<br />

DB AG, which firstly allowed to control different infrastructure and to integrate into one<br />

terminal.<br />

Seven dispatching centres have been equipped by Funkwerk between 1999 and 2001.<br />

There is a 24 h telephone hotline for dispatching centres in Germany.<br />

► GSM-R-network access Frankfurt/Main and Duisburg<br />

With the beginning of the installation of the GSM-R network in 2004 the first dispatching<br />

centres have been connected to the GSM-R network as well. Since that time train traffic<br />

successfully runs on the highspeed track Cologne/Rhine/Main controlled by the dispatching<br />

centres of Frankfurt and Duisburg.<br />

► Reference centre of DB Telematik (TRZ)<br />

A test and reference system for GSM-R integration was installed in the test and reference<br />

centre of DB Telematik.<br />

► GSM-R – access in dispatching centres<br />

Since 11/2004 successful test for dispatching centres level 1 at TRZ DB Telematik.<br />

� Hanover<br />

� Berlin<br />

� Leipzig<br />

� Duisburg<br />

� Frankfurt<br />

� Karlsruhe<br />

� Munich<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 14 / 36


Volumen<br />

Customer<br />

Realisation<br />

Volume<br />

Customer<br />

Realisation<br />

BZ 2002 Order Volume Realisation<br />

BZ Leipzig 4,5 M€ 2000<br />

BZ Berlin 3,1 M€ 2000<br />

BZ Hanover 2,0 M€ 2000<br />

BZ Duisburg 1,5 M€ 2003<br />

BZ Frankfurt 1,4 M€ 2001<br />

BZ Karlsruhe 1,8 M€ 2001<br />

BZ Munich 1,4 M€ 2002<br />

Test- & Reference centre of DB<br />

Telematik in Eschborn<br />

GSM-R-access of the BZ Frankfurt and<br />

the BZ Duisburg<br />

1,0 M€ 03 – 12/2003<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 15 / 36<br />

2003<br />

BZ Dublin / Ireland 0,5 M€ 2002<br />

► BZ München Connection – ESTW Nürnberg<br />

163.000 €<br />

DB Telematik GmbH<br />

2004<br />

► BZ Karlsruhe Connection – ESTW Friedrichshafen<br />

144.000 €<br />

DB Netz AG<br />

2004


2.2 Communication Systems / ESTW<br />

DIKOS 210 und 310<br />

2.2.1 Railway<br />

2.2.1.1 Germany<br />

1997<br />

1998<br />

1999<br />

Extract: Funkwerk with the digital communication<br />

system DIKOS 210/BF 80 at main tracks of the DB AG<br />

equipped stations – engineering, assembly, measuring<br />

and service<br />

� Main station Prenzlau<br />

� S-Bahn Halle/ Möckern<br />

� extension BTL Halle<br />

� extension main station Cottbus<br />

� ESTW Sömmerda<br />

� Knot Erfurt<br />

� extension Saale-Bahn<br />

� main station Schwerin<br />

� station Bornitz<br />

� track Hannover – Berlin<br />

� ESTW/nnot Erfurt<br />

� Knot Bitterfeld<br />

� track Hamburg – Berlin 1. and 2. section<br />

� ESTW Velgast<br />

� track Velgast – Stralsund<br />

� ESTW Jüterbog<br />

� track Gotha – Leinefelde<br />

� track Hamburg - Berlin 3. section<br />

� ESTW Weißenfels<br />

� ESTW Werdau<br />

� public address of station Riesa<br />

� track Oebisfelde- Staaken<br />

� station Beilrode<br />

� S-Bahn Berlin/ Warschauer Str.<br />

� BW Eisenach<br />

� S-Bahn Halle/ Steintorbrücke<br />

� Digital connection of the SST in the<br />

area of Schwerin<br />

� track Wurzen Oschatz<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 16 / 36


2000<br />

2001<br />

2002<br />

� ESTW Apolda<br />

� ESTW Klingenberg<br />

� ESTW Görlitz<br />

� ESTW Pristewitz<br />

� ESTW Dresden<br />

� ESTW Hamburg/Harburg<br />

� ESTW Reichenbach<br />

� ESTW Waldshut<br />

� ESTW Mannheim<br />

� ESTW Bischofswerda<br />

� ESTW Schifferstadt<br />

� ESTW Finnentrop<br />

� ESTW Dortmund<br />

� ESTW Genshagener Heide<br />

� NBS Cologne-Rhine/Main<br />

� ESTW Wüstenbrand<br />

� section Borsdorf/Engelsdorf<br />

� ESTW Tharandt<br />

� ESTW Siegmar<br />

� ESTW Erfurt 2.BA<br />

� Stollberg-Hammer<br />

� Switching of ESTW Saalfeld<br />

� ESTW A-Neuwiederitzsch<br />

� ESTW Görlitz 2. Bauphase<br />

� ESTW Troisdorf<br />

� BZ Munich connection to ESTW<br />

Petershausen<br />

� ESTW Nauen<br />

� ESTW Bingen<br />

� S-Bahn Station Wedding<br />

� ESTW Berkenbrück<br />

� Falkenhagener Kreuz<br />

� Köln-Deutz tief<br />

� ESTW Güstrow<br />

� ESTW Herlasgrün<br />

� ESTW Bredstedt<br />

� ESTW Fürstenwalde<br />

� ESTW Bad Doberan<br />

� ESTW Kiel<br />

� ESTW Krefeld<br />

� ESTW Niederwiesa<br />

� ESTW Blankensee<br />

� ESTW Aschaffenburg<br />

� ESTW Heidenau<br />

� connection ESTW Wurzen<br />

� Genshagener Heide 2. construction<br />

phase<br />

� Knot Magdeburg<br />

� UZ Freiberg<br />

� ABS Hamburg-Berlin switching of<br />

station<br />

Wittenberge<br />

� UZ Ruhleben<br />

� NBS Erfurt-Leipzig-Halle ESTW<br />

Gröbers<br />

Neuwiederitzsch<br />

� Cottbus-Peitz<br />

� ESTW Köthen<br />

� DSZ Magdeburg<br />

� UZ Wittenberg-Delitzsch-Bitterfeld<br />

� Public address station Berlin-<br />

Friedrichstraße<br />

� Berlin inner circle BA 30 northern<br />

section<br />

� ESTW Stein<br />

� ESTW Petershausen<br />

� Ingolstadt Nord<br />

� SST Aumühle<br />

� ESTW Plattling<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 17 / 36


2003<br />

2004<br />

2005<br />

Realisation<br />

Volume<br />

Customer<br />

Realisation<br />

Volume<br />

Customer<br />

� ESTW Bad Segeberg<br />

� ESTW Einsiedlerhof<br />

� Adaption of BZ-S-Bahn Zehlendorf<br />

� ESTW Burg<br />

� ESTW Lübeck<br />

� Colone -Deutz<br />

� ESTW Gießen<br />

� ESTW Frankfurt/Main – Ost<br />

� ESTW Singen und Villingen<br />

� ESTW Michendorf<br />

� GWB Hamburg – Lübeck<br />

� ESTW Heidenheim<br />

► Knot Magdeburg<br />

Largest ESTW project (according to area) in Europe<br />

2001 – 2004<br />

3,5 Mio. €<br />

DB Projektbau Magdeburg<br />

� ESTW Anklam<br />

� ESTW Angermünde<br />

� ESTW Sömmerda<br />

� Annaberg-Buchholz<br />

� ZU Moabit<br />

� ESTW Schwerin Los 1-5<br />

� ESTW Königs-Wusterhausen<br />

► North-South-Connection<br />

2005 – 2006<br />

3,25 Mio. €<br />

DB Netz AG<br />

� SST Willibadessen<br />

� ESTW Saarbrücken<br />

� ESTW Krefeld<br />

� ESTW Friedrichshafen<br />

� ESTW Briesen und Fangschleuse<br />

� ESTW Fürstenberg<br />

� Tunnel Aubing München<br />

� Interims switching box Schwerin<br />

� ESTW A Halbe-ESTW Z/ZU<br />

Lübbenau<br />

� New track Nünberg-Ingolstadt BOS<br />

radio<br />

� New track AVG (Karlsruhe)<br />

Heilbron-Öhringen<br />

� S-Bahn Halle-Leipzig<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 18 / 36


2006<br />

2.2.1.2 Export<br />

Realisation<br />

Volume<br />

Customer<br />

► ESTW Frankfurt a.M. main station<br />

2004-2006<br />

1,1 Mio. €<br />

DB ProjektBau GmbH<br />

� ESTW Lübbenau (continuation)<br />

� KAP Frankfurt/Oder<br />

� NBS Nürnberg-Ingolstadt<br />

(continuation)<br />

� North-South-Connection<br />

(continuation)<br />

� Main Station Leipzig Announcement<br />

Center<br />

� TK-Systems station Haren<br />

(continuation)<br />

� ESTW Michendorf<br />

(continuation)<br />

� ESTW Angermünde<br />

(continuation)<br />

� ESTW Frankfurt/M.HBF<br />

(continuation)<br />

� ESTW Neukirch/West<br />

� NBS München-Ingolstadt<br />

(continuation)<br />

� ESTW Stendal<br />

� Announcement Center<br />

Kaiserslautern<br />

� Public Address System Speyer-<br />

Germersheim<br />

� ASAG for Station Berlin ZOO<br />

� ESTW GERA<br />

� ESTW Fürstenberg<br />

� ESTW Plauen<br />

� TKA for UZ Stendal<br />

� TKA for UZ Jüterbog<br />

� Connection UZ Pirna to BZ Leipzig<br />

� KAP Stralsund<br />

� ESTW Stendal<br />

(continuation)<br />

� ESTW Anklam<br />

(continuation)<br />

� UZ Jüterbog to BZ Berlin Pankow<br />

� Public Address System station<br />

Lübeck (continuation)<br />

� Schwerin Main Station<br />

(continuation)<br />

� ABS Leipzig Dresden: D210 Bhf<br />

Neustadt (continuation)<br />

� ESTW Warburg<br />

� Schwitzerland 1997/98<br />

� Africa 2001<br />

� Norway 2001<br />

� Belgium 2001<br />

� Hungaria 1997/98, 2000, 2002, 2006, 2007<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 19 / 36


Realisation<br />

Partner<br />

Customer<br />

Realisation<br />

Partner<br />

Customer<br />

► Pilot project DIKOS 310 for the Hungarian Railways MAV, Pusztaszabolcz<br />

Remote control, monitoring and surveillance of the stations Ercsi and Ivancsa from the station<br />

Pusztaszabolcz based on<br />

� DIKOS 310 (Digital communcation system),<br />

� H-ELA 3000 (Public address/ announcement system),<br />

� KAP 400 standard and<br />

� video surveillance components from Funkwerk<br />

2006<br />

Paracomtel Kft.<br />

Hungarian Railways MAV<br />

► Supply DIKOS 310 for the Hungarian Railways MAV<br />

Station Ujszasz<br />

2007<br />

Funkwerk Hungary<br />

Hungarian Railways MAV<br />

2.2.2 Waterway administrations<br />

► DIKOS Software adaption<br />

� Magdeburg<br />

� Datteln<br />

� Koblenz<br />

� Berlin<br />

� Nuremberg<br />

► EL/WL DIKOS<br />

� channel stepp Forchheim, Hausen, Erlangen, Kriegenbrunn (Main-<br />

Donau-channel)<br />

� channel step Eibach<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 20 / 36


2.2.3 Fraport AG<br />

2.2.4 Private Railways<br />

2.2.5 Export<br />

2.2.6 Other<br />

► Realisation of a complex communication system Fraport AG Frankfurt a.M., 50<br />

systems<br />

� Dürener Kreisbahn<br />

� Bayerische Oberlandbahn BOB<br />

� Stadtbahn Dortmund<br />

� Hungary 1997/98 2000 2002<br />

� Switzerland 1997/98<br />

� Africa 2001<br />

� Norway 2001<br />

� Belgium 2001<br />

HFWK has equipped all main, extension and new tracks in the area of the German State<br />

Railroad<br />

(former GBR area) with telecommunication systems.<br />

2.2.7 Public Customers ( Systemhaus Technik)<br />

� City of Dortmund ( public address of stops Westfalen hall)<br />

[BFMA + Variodyn]<br />

� DB AG Heißläuferortungsanlage- HOA Brannenburg, HOA Herbertshofen<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 21 / 36


2.3 Passenger Information and Public Address Systems<br />

Customer<br />

Project value<br />

Realisation period<br />

Share of development<br />

Customer<br />

Project value<br />

Realisation period<br />

Share of development<br />

Customer<br />

Project value<br />

Realisation period<br />

Share of development<br />

► Main Station Erfurt<br />

Dynamic and automatic passenger information.<br />

installation of a automatic public address and display system and the corresponding control<br />

system.<br />

Deutsche Bahn AG<br />

250.000 €<br />

Oct. 2002 to May 2003<br />

50%<br />

► Main Station Dresden/Neustadt<br />

Dynamic and half-automatic passenger information.<br />

Operation with regular schedule data as train stop data are not available yet.<br />

Deutsche Bahn AG<br />

500.000 €<br />

March 2000 to Dec. 2000<br />

75%<br />

► Project Enztalbahn<br />

Stationary video surveillance<br />

Live public address and display control<br />

Multimedia network with „SmartSwitch“-transmission technology<br />

Albthaler Verkehrsgesellschaft<br />

750.000 €<br />

2002<br />

50%<br />

► Project S-Bahn Hamburg ( ATM )<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 22 / 36


Realisation period<br />

Customer<br />

Project value<br />

Realisation period<br />

Share of development<br />

Customer<br />

Project value<br />

Realisation period<br />

Share of development<br />

Customer<br />

Project value<br />

Realisation<br />

Passenger information system to control the public address and display modules at main<br />

stations and stops.<br />

2002<br />

► Track Budapest – Dunakeczi (Hungary)<br />

Paracomtel PCT and MAV (Hungarian Railways)<br />

250.000€<br />

Sep. 2002 to May 2003<br />

80% new development<br />

► S-Bahn Berlin passenger information and public address system with<br />

integrated remote clearance<br />

Remote clearance within the S-Bahn network Berlin/level I.<br />

Public address and display control.<br />

Installation of a mulitmedia network along the track (SmartSwitch transmission).<br />

Video surveillance for the safety on platforms and for remote clearance.<br />

Communication between stops and connection to train radio.<br />

S-Bahn Berlin<br />

1.200.000 €<br />

Oct. 2002 to Apr. 2003<br />

50% new development<br />

► North-South connection station Papestraße<br />

Passenger information/public address<br />

DB AG<br />

2,2 Mio. €<br />

2005<br />

► ABS Hamburg RWS Hamburg-Berlin<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 23 / 36


Project value<br />

Realisation period<br />

Customer<br />

Realisation<br />

Customer<br />

Realisation<br />

Customer<br />

Realisation<br />

Passenger information/public address<br />

Customer: Siemens Building Technologies<br />

2 Mio. €<br />

2004<br />

► Regional Announcement centre Stuttgart<br />

Passenger information / announcement technology / communication-workstation KAP, Live<br />

announcements and announcement control<br />

Announcement centre for 18 Stations<br />

Tracks:<br />

Stuttgart-Nürnberger Straße to Schorndorf<br />

Stuttgart-Nürnberger Straße to Maubach<br />

DB AG<br />

2004-05<br />

► Regional Announcement centre Nuremberg<br />

Passenger information / announcement technology / communication-workstation KAP, Live<br />

announcements and announcement control Announcement centre for 58 Stations<br />

Tracks: Whole local traffic area of the region of Nuremberg<br />

DB AG<br />

2005<br />

► Passenger information main station Erfurt<br />

Technology: IBA conformal passenger formation arrangement with 6 indicators of type 3 ds,<br />

two 40 duties(customs) TFT monitors and an info board type 6 for the first introduction step.<br />

Other introduction steps in November, 2006 and March, 2007 planned.<br />

DB AG<br />

2005<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 24 / 36


Customer<br />

Project value<br />

Realisation period<br />

► More passenger information and public address systems on the following<br />

tracks:<br />

� track Weimar – Kranichfeld<br />

� track Bischofswerda-Dresden<br />

� ESTW Tharandt<br />

� ESTW Wüstenbrand<br />

� ESTW Siegmar<br />

� ESTW Troisdorf<br />

� track Basel-Erzingen<br />

� ESTW Waldshut<br />

� station Grünhufe<br />

� Public address system Saarmund<br />

� ESTW Hohenstein-Ernstthal, St.<br />

Egidien<br />

� Station Obernau<br />

� Ingolstadt north<br />

� Falkenhagener Kreuz<br />

� Building control department<br />

Dortmund<br />

� Station Schnelldorf<br />

� Station Rechberg<br />

� Station Burgholzhausen<br />

� Announcer workstations Magdeburg<br />

� ESTW Krefeld<br />

� ESTW Lövenich<br />

� ESTW Düren<br />

Deutsche Bahn AG<br />

from 20.000 to 1.000.000 €<br />

1999 to 2005<br />

� S-Bahn Dresden-Pirna<br />

� S-Bahn Stuttgart Bahnhof Filderstadt<br />

� Dresden-Cotta<br />

� ESTW Nauen<br />

� ESTW Bingen<br />

� ESTW Bergenbrück<br />

� Köln-Deutz tief<br />

� Public address system station<br />

Berlin-Friedrichstraße<br />

� Main stationLübeck<br />

� Station Osterrode Leege<br />

� Station Osterrode Mitte<br />

� Station Hamburg-Hitfeld<br />

� Station Hamburg-Klecken<br />

� ESTW Michendorf section<br />

ELA/MAS 90<br />

� SPNV Leipzig-Chemnitz, BA<br />

Leipzig-Geithain<br />

� Prignitzexpress<br />

� ESTW Freiberg<br />

� Station Freiburg<br />

� Station Baden-Baden<br />

� Passenger information Bruchsal<br />

(Karlsruhe)<br />

� Citytunnel Leipzig<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 25 / 36


2.4 Public address systems / electro-acoustics<br />

Series: Variodyn (Lizenz Siemens Wien AG )<br />

Producer: Hörmann Funkwerk Kölleda GmbH<br />

► More than 500 public address systems with different configurations between<br />

1997-2007<br />

� Main stations and stations Erfurt, Halle, Herrenkrug, Montabaur, Naumburg,<br />

Saalfeld, Sondershausen, S – Bahn station Olympia –<br />

Stadium Berlin, Jena-Paradies, Limburg,<br />

Lehrter Bahnhof Berlin, Potsdamer Platz Berlin,<br />

Friedrichstraße Berlin, Schwerin, Frankfurt/Oder<br />

� Grammar schools and schools e. g. Gymnasium Sangerhausen<br />

� Hotels e. g. Forum Hotel Berlin, „Welcome“ Hotel Meschede<br />

� Churches e. g. Frauenkirche Munich<br />

� Sporting areas e. g. Ski stadium Kanzlersgrund Oberhof, Sportpark<br />

„Herrenkrug“ Magdeburg<br />

� Sports halls e. g. Sports hall, Wilmersdorf<br />

� Banks e. g. Administration building Dresdner Bank Leipzig,<br />

City Bank Düsseldorf<br />

� Supermarkets e. g. OBI market Salzgitter and Schwarzenberg<br />

� Shopping centres e. g. Glockenzentrum, Apolda<br />

� Malls e. g. Kaufhof, Chemnitz<br />

� Office buildings e. g. chamber of handicrafts and AOK in Coburg<br />

� Adminstrations e. g. district administration Eisleben, historical city hall<br />

Nuremberg<br />

� Homes e. g. old people’s home "Wartburgblick", Eisenach<br />

� Transport operators e. g. Logisticcentre Apfelstädt/Erfurt<br />

� Industrial plants u. a. LAUBAG Cottbus, EON<br />

� Fire brigade depots e. g. Köln<br />

� Hospitals e. g. Catholic hospital Erfurt, KKH Sondershausen,<br />

Neanderklinik,<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 26 / 36


� Sports and leisure centres<br />

Harzwald, building of health resort treatment Bad<br />

Frankenhausen<br />

e. g. Bad Saarow<br />

� Prisons e. g. JVA Würzburg, JVA Ülzen<br />

� Harbors e. g. Sea harbor Rostock<br />

� Cultural centres e. g. Telephone system opera house Nuremberg<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 27 / 36


2.5 Cable projects and miscellaneous stationary communication<br />

systems<br />

2001 - 2005<br />

2002 - 2007<br />

Realisation<br />

Volume<br />

Customer<br />

Realisation<br />

Volume<br />

Customer<br />

Realisation<br />

Customer<br />

► Delivery, installation, measurement of telecommunication cables on the basis<br />

of CU and optical waveguide (mainly for railway operators)<br />

� ESTW Genshagener Heide<br />

� HVT Forststraße/Berlin<br />

� HVT Säntisstraße/Berlin<br />

� ESTW Hangelsberg<br />

� ESTW Friedrichshafen<br />

► Station telecommunication cables<br />

� Buchholz-Zauche<br />

� Pirna<br />

� Bhf. Dittfurt<br />

� Mühlenbeck-Mönchmühle<br />

� Bahnhof Lövenich<br />

� Düren-Langerwehe<br />

� Brackwede-Bad Rothefelde<br />

� Hauptbahnhof Rostock<br />

� Frankfurt/Oder<br />

� Brannenburg<br />

► Test track Rostock-Sanitz-Tessin<br />

34’’ track cables, all together 27 km, civil engineering 1,5 km<br />

construction of 3 concrete switching boxes<br />

2001<br />

1,1 Mio. DM<br />

DB Telematik<br />

► HOA Herbertshofen<br />

switching boxes<br />

2003<br />

170.000 €<br />

DB Telematik Munich<br />

► Track cabling Prenzlau-Pasewalk-Anklam<br />

70.000 m optical waveguide cable 60’, incl. road and track crossings<br />

ESTW and GSMR connection<br />

2002-2003<br />

Siemens AG<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 28 / 36


Realisation<br />

Customer<br />

Realisation<br />

Customer<br />

Realisation<br />

Cutomer<br />

Realisation<br />

Cutomer<br />

Realisation<br />

Cutomer<br />

Realisation<br />

► Track cabling Berliner inner ring BA 30<br />

Underground engineering, laying and installation of 25.000 m cable 50“,<br />

Further assembly sections: Installation of digital communication system, private mobile<br />

radio<br />

2003-2004<br />

DB Netz AG<br />

► Track cabling Berliner inner ring BA 93<br />

Underground engineering, laying and installation of 15.000 m cable 24“, incl. cable fittings,<br />

end devices and switching boxes,<br />

Further assembly sections: tunnel radio, emergency call<br />

2003-2004<br />

DB Netz AG<br />

► ESTW Michendorf<br />

Cabling and installation of transmitting system, MAS90, ELA, EMA, BMA<br />

2004-2006<br />

DB Netz AG<br />

► Track cabling Angermünde – Schwedt<br />

Underground engineering, laying and installation of 14.500 m cable 34“<br />

and mounting of digital communication system and adaptation of TC-systems<br />

2005-2006<br />

DB Netz AG<br />

► Track cabling Angermünde (several constructing stages)<br />

Underground engineering, laying and installation of 30.000 m cable 34“, 6.500 m cable 52“,<br />

incl. cable fittings, end devices, road and track crossings,<br />

Further assembly sections: mounting of digital communication system , radio system,<br />

transmission system, switching technique and power supply<br />

2004-2006<br />

DB Netz AG<br />

► Track cabling Anhalter Bahn (Cu and optical waveguide equipment)<br />

Underground engineering, laying and installation of 20.000 m cable 34“, incl. cable fittings,<br />

end devices,<br />

Underground engineering, laying and installation of 18.500 m optical waveguide cable 48’,<br />

incl. cable fittings, end devices,<br />

Further assembly sections: MAS90, public address, EMA and digital communication<br />

system<br />

2005-2006<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 29 / 36


Cutomer<br />

Realisation<br />

Cutomer<br />

Realisation<br />

Cutomer<br />

Realisation<br />

Cutomer<br />

DB Netz AG<br />

► North-South-Connection (intercity railway) telecommunication system TEH<br />

601/6601<br />

(Berlin Südkreuz, Berlin Potsdamer Platz and central station Berlin),<br />

Underground engineering, laying and installation of 8.600 m cable 34“, incl. cable fittings,<br />

end devices, Underground engineering, laying and installation of 51.200 m cable, incl. cable<br />

fittings, end devices,<br />

Underground engineering, laying and installation of 17.000 m optical wave guide cable 48’,<br />

incl. cable fittings, end devices, inhouse cabling of 49.500 m E30/ 90 4 DA – 20 DA and patch<br />

cable<br />

Further assembly sections: digital communication systems, public address, tunnel<br />

emergency call, transfer mode system,<br />

2004-2006<br />

DB Netz AG<br />

► North-South-Connection, VP 11.1<br />

Underground engineering, laying and installation of 25.000 m cable 50“ - 100“, incl. cable<br />

fittings, end devices,<br />

Underground engineering, laying and installation of 28.000 m cable in station, incl. cable<br />

fittings, end devices,<br />

Inhouse cabling of 17.000 m cable 2 DA – 100 DA<br />

Underground engineering, laying and installation of 31.000 m divers cables (optical wave<br />

guide cable and other)<br />

Further assembly sections: digital communication systems, MAS90, PMR radio<br />

2004-2006<br />

DB Netz AG<br />

► ESTW-A Halbe – ESTW-Z / UZ Lübbenau<br />

Underground engineering, laying and installation of 53.000 m cable 24“, incl. cable fittings,<br />

end devices and railroad crossings,<br />

Underground engineering, laying and installation of 80.000 m optical wave guide cable 24’,<br />

incl. cable fittings, end devices and railroad crossings,<br />

Further assembly sections: digital communication systems, MAS90, transfer mode system,<br />

public address systems, mobile train radio, power supply devices, door speak systems, clock<br />

system, facility installation,<br />

2005-2006<br />

DB Netz AG<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 30 / 36


Realisation<br />

Cutomer<br />

Realisation<br />

Cutomer<br />

► ESTW Lübbenau, 2. BA<br />

Underground engineering, laying and installation of 12.000 m cable 24“, incl. cable fittings,<br />

end devices and railroad crossings,<br />

Underground engineering, laying and installation of 50.000 m optical waveguide cable 24’,<br />

incl. cable fittings and end devices,<br />

Further assembly sections: digital communication systems, MAS90, mobile train radio,<br />

power supply devices, facility installation,<br />

2006<br />

DB Netz AG<br />

► Neubaustrecke Nürnberg-Ingolstadt<br />

Underground engineering, laying and installation of 27.200 m cable in tunnel<br />

Further assembly sections: digital communication systems, public address systems, power<br />

supply devices for PMR tunnel radio<br />

2006<br />

Marconi<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 31 / 36


3 Mobile Communication Systems<br />

3.1 Akustisches Fahrgastinformationssystem LAR<br />

1997<br />

1998<br />

1999<br />

2000 - 2007<br />

� Deutsche Bahn AG 600 loudspeaker systems<br />

� GSP Berlin/Waggonbau Görlitz 100 double stack waggons with loudspeaker systems<br />

and GSM<br />

� OFV Verona (Italien) 100 passenger compartments<br />

� Deutsche Bahn AG 450 loudspeaker systems<br />

� GSP Berlin/Wagonbau Görlitz 80 double stack waggons with loudspeaker andGSM<br />

� GSP Berlin/PFA Weiden 40 passenger compartments „PUMA“ with<br />

loudspeaker system and GSM<br />

� GSP Berlin/Waggonbau Görlitz 80 double stack waggons with loudspeaker system<br />

and GSM<br />

� GSP Berlin/PFA Weiden 40 passenger compartment „PUMA“ with loudspeaker<br />

systems and GSM<br />

� Deutsche Bahn AG 100 loudspeaker systems<br />

� GSP Berlin/Waggonbau Görlitz 80 double stack waggons mit loudspeaker systems<br />

� Deutsche Bahn AG 60 loudspeaker systems<br />

� GSP Berlin/Waggonbau Görlitz 80 double stack waggons with loudspeaker systems<br />

and GSM<br />

� Loetec Wittenberge 30 loudspeaker systems for railway passenger car in<br />

China<br />

� DB Schlaf- und Liegewagen 50 LAR-TIS<br />

� ICE 3 300 LAR amplifier modules<br />

� RUF Schweiz 15 LAR-TIS<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 32 / 36


3.2 Board computer SMC / FMC<br />

Data processing, passenger information and public announcement system with integrated mobile and<br />

stationary video surveillance<br />

Customer<br />

Volume<br />

Realisation<br />

Volume<br />

Realisation<br />

Volume<br />

Realisation<br />

► STIB Brüssel<br />

Video surveillance<br />

Within a public transport project (PRISMATICA) Funkwerk has realised a live picture<br />

transmission over a distance of 4 stations via Wireless LAN out of a driving underground into<br />

the surveillance centre.<br />

Video recording system SMC IV and V<br />

42 busses with video recording (in 2004), Turnover volume: 189,000 €<br />

130 trams with video recording (in 2002), Turnover volume: 1,300,000 €<br />

42 undergrounds with video surveillance (in 2003), Turnover volume: 180,000 €<br />

Société des Transports Intercommunaux de Bruxelles (STIB)<br />

Passenger information<br />

In each of the 217 metro trains of Brussels transport operator is the VVAS passenger<br />

information system installed. The system locates the position of the vehicles in the route<br />

network and controls the display and public announcement system in the passenger<br />

compartment.<br />

1,300,000 €<br />

2004-2007<br />

Data processing<br />

Project in metro trains to collect the passenger count-system data in trains as well as in<br />

defined points in the route network, automatic transfer via WLAN transmission to the data<br />

centre<br />

30,000 €<br />

2005<br />

Im Rahmen eines internationalen ÖPNV Projektes ( PRISMATICA ) ist die Live-<br />

Bildübertragung aus den fahrenden U-Bahnen in die Überwachungszentrale über Wireless<br />

LAN mit dem Funkwerk MTSS System über eine Strecke von 4 Stationen realisiert.<br />

Parallel dazu erfolgt die Speicherung der Videodaten im Fahrzeug auf einer<br />

Wechselfestplatte, die im Bedarfsfalle entnommen mit der entsprechenden MBSS- Station<br />

ausgewertet werden kann.<br />

► Infra Fürth Verkehrs GmbH<br />

Video recording in 22 busses with WLAN transmission in the depot<br />

Video recording system SMC IV including Wireless LAN option<br />

100.000 € (2003)<br />

2004<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 33 / 36


Volume<br />

Realisation<br />

Customer<br />

Volume<br />

Realisation<br />

Customer<br />

► Underground Nuremberg (RUBIN): driverless<br />

underground<br />

In a venture which is unique in Germany, the Nuremberg public transport operator, VAG<br />

Nürnberg, plan to introduce completely automatic driverless trains to two of its underground<br />

rail routes: to the U3 line in 2006, followed by the U2 line during 2007. At the same time it<br />

intends that security and safety standards in stations and trains will be further upgraded, and<br />

to facilitate this, the transport authority and the Nuremberg civil works department have<br />

awarded the Funkwerk Group for the part of the video surveillance, data processing and<br />

WLAN infrastructure.<br />

Passenger compartment surveillance via WLAN with live-pictures directly to the centre control<br />

room.<br />

20 km distance of the underground are equipped with WLAN.<br />

30 trains from Siemens Transportation Systems are equipped with SMC VI video recording<br />

system including Wireless LAN option.<br />

1.500.000 €<br />

2005 - 2007<br />

VAG Nuremberg and municipality Nuremberg<br />

► Project CAF / STIB, Metro M6<br />

IIntegrated system for optical and visual passenger information and video surveillance<br />

Funkwerk delivers for the new metro-train units of the Spanish vehicle producer<br />

Construcciones y Auxiliar de Ferrocarriles, S.A. (CAF) and integrated communication system<br />

that integrates the following applications and components:<br />

� Video recording in the passenger compartments<br />

� Localisation of the vehicle position via transponder<br />

� Exterior and interior displays<br />

� Audio components ( amplifiers and loudspeakers )<br />

� Emergency intercoms for passengers<br />

� Operating components for the driver ( MMI for announcements,<br />

� MMI radio communication, handset )<br />

� Wireless LAN components (interface, antenna)<br />

The system’s control is managed through the SMC video surveillance computer. The wireless<br />

data transmission allows data transmission and a picture transmission from the passenger<br />

department to the security centre. For the optical and visual passenger information the<br />

Funkwerk's Isytrack system is used.<br />

1.230.000 €<br />

2004-2007<br />

CAF-Construcciones y Auxiliar<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 34 / 36


Kunde<br />

Projektvolumen<br />

Realisierung<br />

► Project Metro Torino / GTT<br />

Delivery of stationary and mobile video technology for the transmission of images from the<br />

stations and the moving trains. The video surveillance system SMC is installed in the 48<br />

trains (manufacturer: Siemens Transportation) of the Metro Torino including the transmission<br />

of the images into the centre. The transmission is via Wireless LAN that is installed in the<br />

several tunnel sections.<br />

The presentation of the stationary and mobile video data take place via Funkwerk's<br />

standardized management system p.o.s.a<br />

GTT (Gruppo Torinese Transporti)<br />

640.000 € (für die ersten 48 Zugeinheiten),<br />

12 weitere sind 2006 vom Betreiber nachbestellt und werden 07/2007 in Betrieb genommen.<br />

2005-2007<br />

Project Data:<br />

Transportation performance: 30.000 passengers/h<br />

In rush hours: Every two minutes a train<br />

Driving duration of entire first step section only 11 minutes<br />

Up to 440 passengers per train<br />

Maximum speed 80km/h<br />

Average speed over all 11 stations 32km/h<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 35 / 36


Customer<br />

Volume<br />

Realisation<br />

► Project KDI - Suburban Railway Berlin<br />

The suburban railway implements the train dispatching process by the driver within the<br />

operating and information system project.. Therefore the equipment of the passenger<br />

information attach a great importance.<br />

The project target is the implementation of an integrative communication, data and<br />

information system for the vehicle types 481, 485 and 480 that displace the existing IBIS<br />

control units in the mentioned vehicles.<br />

The vehicle types will be directly at the S-Bahn Berlin GmbH equipped with Funkwerk's<br />

Modular Computer (FMC).<br />

The integrative communication, data and information system combines a huge amount of<br />

new functionalities such as:<br />

� Energy-saving operation mode<br />

� Improved diagnostic function<br />

� IP ability, Voice over IP<br />

� Redundancy conept<br />

� Wireless, site-related data supply<br />

� Synthetic voice (TTS)<br />

� Synchronisation of the network data<br />

S-Bahn Berlin GmbH<br />

1.000.000 € (250 Vehicles BR481)<br />

2006 – 2007<br />

Hörmann Funkwerk Kölleda GmbH<br />

Im Funkwerk 5 | D-99625 Kölleda | Tel.: +49 3635 458-0 | Fax: +49 3635 458-399 | Internet: www.hfwk.de<br />

Version: 7.0 from 22.01.2008 e Subject to change without notice! Page 36 / 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!