28.05.2015 Views

Summa Group News

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Summa</strong> <strong>Group</strong> 2015 – May – PT2<br />

STROYNOVATSIYA TO COMPLETE RAMP ON YAROSLAVL HIGHWAY<br />

Stroynovatsiya, part of the <strong>Summa</strong> <strong>Group</strong>, will be completing a newly constructed U-turn ramp on<br />

the M8 Kholmogory Highway near Moscow. The M8 Kholmogory Highway’s 16-20km section has<br />

been newly renovated in order to provide a turn around for traffic traveling from Moscow and<br />

neighbouring villages. The U-turn ramp will reduce traffic build-up at the Korolev Junction.<br />

During the construction, Stroynovatsiya,<br />

who was contracted for the renovations,<br />

included the installation of 4 pedestrian<br />

crossings with ramps. The 16-20km<br />

section spans over 3441 kilometres and<br />

has 6 highway traffic lanes with 3 lanes in<br />

each direction.<br />

After the renovations, the highway will have<br />

5 lanes in each direction as well as the<br />

inclusion of relief roads and speed change<br />

lanes, and will be able to accommodate<br />

over 250 000 cars per day in both<br />

directions.<br />

FESCO – NCSP - STROYNOVATSIYA – INTEX – YATEC – UNITED GRAIN COMPANY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!