Summa Group News
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Summa</strong> <strong>Group</strong> 2015 – May – PT2<br />
STROYNOVATSIYA TO COMPLETE RAMP ON YAROSLAVL HIGHWAY<br />
Stroynovatsiya, part of the <strong>Summa</strong> <strong>Group</strong>, will be completing a newly constructed U-turn ramp on<br />
the M8 Kholmogory Highway near Moscow. The M8 Kholmogory Highway’s 16-20km section has<br />
been newly renovated in order to provide a turn around for traffic traveling from Moscow and<br />
neighbouring villages. The U-turn ramp will reduce traffic build-up at the Korolev Junction.<br />
During the construction, Stroynovatsiya,<br />
who was contracted for the renovations,<br />
included the installation of 4 pedestrian<br />
crossings with ramps. The 16-20km<br />
section spans over 3441 kilometres and<br />
has 6 highway traffic lanes with 3 lanes in<br />
each direction.<br />
After the renovations, the highway will have<br />
5 lanes in each direction as well as the<br />
inclusion of relief roads and speed change<br />
lanes, and will be able to accommodate<br />
over 250 000 cars per day in both<br />
directions.<br />
FESCO – NCSP - STROYNOVATSIYA – INTEX – YATEC – UNITED GRAIN COMPANY