17.11.2012 Views

Activity to reduce unit consumption of compressed air by its supply in ...

Activity to reduce unit consumption of compressed air by its supply in ...

Activity to reduce unit consumption of compressed air by its supply in ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

National Convention <strong>of</strong> Excellent Examples <strong>in</strong> Energy Conservation for Fiscal 2005<br />

2005_PCECCJ_7_Nissan_Mo<strong>to</strong>r_Co._Ltd._Oppama_Plant<br />

This requires a major improvement <strong>of</strong> the control system, but because the current control<br />

system does not have enough flexibility, we discussed update <strong>of</strong> the entire system.<br />

4. Details <strong>of</strong> Measures<br />

To update the entire control system, we considered the follow<strong>in</strong>g issues that are currently<br />

troubl<strong>in</strong>g:<br />

To <strong>supply</strong> <strong>compressed</strong> <strong>air</strong> <strong>in</strong> sync with production, [1] production <strong>in</strong>formation should be<br />

<strong>in</strong>cluded <strong>in</strong> control <strong>in</strong>formation <strong>to</strong> suppress pressure fluctuation doe <strong>to</strong> production fluctuation.<br />

[2] Control <strong>supply</strong> <strong>of</strong> <strong>compressed</strong> <strong>air</strong> for each process.<br />

(1) Countermeasure 1: Synchronization <strong>of</strong> Compressed Air Supply Control<br />

with Production (Produce as Needed)<br />

・ Feed forward the production <strong>in</strong>formation<br />

Plan <strong>in</strong>put based on the production plan and correction based on the change <strong>of</strong> plan<br />

<strong>in</strong>formation is established and added <strong>to</strong> the control <strong>in</strong>formation. This allows time<br />

management and au<strong>to</strong>matic control <strong>of</strong> operation <strong>of</strong> the base load mach<strong>in</strong>e and load adjuster<br />

<strong>in</strong> synchronization with production <strong>by</strong> judg<strong>in</strong>g the start and end <strong>of</strong> production.<br />

As a result, header presser became stable and lower, and unload wait time was decreased.<br />

Production plan (monthly) Power source<br />

operation<br />

department<br />

Production <strong>in</strong>formation web page<br />

Plan modification (daily)<br />

Air <strong>supply</strong> facility<br />

Power source operation plan and<br />

accrual record web page<br />

Fig.10 Verification <strong>of</strong> production <strong>in</strong>formation<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!