I&C Architecture follows Power Plant Processes<br />

Filling,<br />

Venting<br />

Unit<br />

Operati<strong>on</strong><br />

Sec<strong>on</strong>dary Circuit<br />

Primary Circuit<br />

Turbine and<br />

Auxiliare Systems<br />

Waste Processing<br />

Heat Removal<br />

and<br />

and<br />

Generator<br />

Auxiliary Systems<br />

Auxiliary Systems<br />

A B C D E F<br />

OPERATION<br />

OPERATION OPERATION OPERATION OPERATION OPERATION<br />

Unit Auxiliary and<br />

Emergency Power<br />

Supply<br />

Demineralizati<strong>on</strong><br />

Raw Water Supply<br />

Fire Fighting<br />

Dei<strong>on</strong>at<br />

Auxiliary Steam<br />

Equipment<br />

Chemical Supply<br />

Gase Supply<br />

Auxiliary Fluid System<br />

Chilled Water Supply<br />

Heating (Buildings at<br />

<str<strong>on</strong>g>NPP</str<strong>on</strong>g> Site)<br />

Venting and Air<br />

C<strong>on</strong>diti<strong>on</strong>ing of C<strong>on</strong>trolled<br />

Access Area<br />

Activity- and<br />

Radiological Survey<br />

Radioactive Gas<br />

Treatment System<br />

Leakage Water Collecti<strong>on</strong><br />

and Treatment<br />

Radioactive Liquid<br />

Waste Treatment and<br />

Handling<br />

C<strong>on</strong>venti<strong>on</strong>al Water<br />

Treatment and<br />

Storage System<br />

Service Water for<br />

Safety-Related<br />

C<strong>on</strong>sumers<br />

Intermediat Cooling<br />

Water Circuit<br />

Main Cooling System<br />

C<strong>on</strong>venti<strong>on</strong>al Service<br />

and intermediate<br />

Cooling System<br />

Main and Auxiliary<br />

C<strong>on</strong>densat System<br />

Feedwater System<br />

Emergency Feedwater<br />

System<br />

Main Steam System<br />

and Auxiliary Steam<br />

Supply<br />

Plant Make-Up<br />

Water System<br />

Safety Systems<br />

Auxiliary System for<br />

Primary Circuit<br />

Main Coolant Circuit<br />

Turbine Plant<br />

Steam Supply of<br />

Turbine Plant<br />

Generator Unit<br />

Unit Transformer<br />

load change<br />

load input<br />

Page 10<br />

Traditi<strong>on</strong>al Internati<strong>on</strong>al Nuclear C<strong>on</strong>ference<br />

© Siemens AG 2010. All rights reserved.<br />

Energy • Fossil Power Generati<strong>on</strong> • Instrumentati<strong>on</strong>, C<strong>on</strong>trols & Electrical<br />