<strong>NX</strong>W REVERSIBLE CHILLER INSTALLATION MANUAL<br />

Field Connected Water Piping<br />

General<br />

System piping should be kept as simple as possible to<br />

minimize the pressure drop, but hand valves should be field<br />

installed to facilitate unit servicing. The piping installation<br />

should provide service personnel with the ability to measure<br />

and/or monitor water temperatures and pressures.<br />

Source and load fluid connections are provided with 2-inch<br />

[50.8mm] Victaulic grooved nipples (see Figure 4). Each<br />

nipple will also have a PT port installed for test and balance<br />

purposes. It will be the installing contractor’s responsibility<br />

to adequately support incoming piping to avoid damage to<br />

the unit’s piping or heat exchangers. The water lines should<br />

be routed so as not to interfere with access to the unit.<br />

For any installation where the transmission of vibration<br />

through the piping connections could cause unacceptable<br />

noise levels in occupied spaces it is important to provide<br />

adequate vibration damping. One method is to use the<br />

optional Adapter Hose Kit (kit number TKC16S-4). This Kit<br />

consists of four pieces of a braided stainless steel flexible<br />

hose with a 2” Victaulic connection on one end and a 2”<br />

MPT connection with pipe union on the other. Overall length<br />

of each piece is 18”.<br />

NOTE: Units are factory run-tested using propylene glycol.<br />

Prior to connecting piping to unit, thoroughly flush heat<br />

exchangers.<br />

Figure 4: Water Connections (<strong>NX</strong>W360 shown)<br />

Figure 5: <strong>Chiller</strong> Back View (<strong>NX</strong>W360 shown)<br />

Brazed Plate Heat Exchanger<br />

P/T Plug<br />

2” Victaulic<br />

Grooved<br />

Nipples<br />

Optional Connection Kit<br />

CKV160FL (Includes four<br />

of each)<br />

Out<br />

In<br />

Water<br />

Connection<br />

Ports<br />

In<br />

TKC16S-4<br />

(1 of 4)<br />

Out<br />

CAUTION: Remove the plastic protective caps in the ends of each of the four water pipes on the heat<br />

exchangers prior to piping connection. Failure to remove the caps will result in serious damage and could void<br />

the warranty.<br />

10