The Modules Storyboard
The Modules Storyboard
The Modules Storyboard
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Exit<br />
Inactive Drains Module Shipment to Barge<br />
Once the first two modules were fabricated and<br />
packaged for transport a self propelled modular<br />
transporter (SPMT) was driven under the module<br />
support system and then driven out of the facility.<br />
<strong>The</strong> SPMT transported the modules the short distance to<br />
the dock at Ellesmere Port and onto the Terra Marique<br />
(barge) where they were secured.<br />
Primary Contractor<br />
COSTAIN<br />
Back to Beginning<br />
Previous Page<br />
Next Page<br />