13.07.2015 Views

8.0 References Atherton, N., 2007a. Groundwater ... - Sellafield Ltd

8.0 References Atherton, N., 2007a. Groundwater ... - Sellafield Ltd

8.0 References Atherton, N., 2007a. Groundwater ... - Sellafield Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Groundwater</strong> Monitoring Annual Report 2008<strong>8.0</strong> <strong>References</strong><strong>Atherton</strong>, N., <strong>2007a</strong>. <strong>Groundwater</strong> Annual Report 2007. <strong>Sellafield</strong> <strong>Ltd</strong> Contaminated LandProgramme.<strong>Atherton</strong>, N., 2007b. Contaminated Land 2008 Annual Strategy Review. <strong>Sellafield</strong> <strong>Ltd</strong>Contaminated Land Programme.<strong>Atherton</strong>, N., 2007c. Design of a Site Protection and Monitoring Programme for <strong>Sellafield</strong>,<strong>Sellafield</strong> <strong>Ltd</strong> requiring reference data to be collected. <strong>Sellafield</strong> <strong>Ltd</strong>., Document TransmittalReference EA/03/4603/24.British Nuclear Group (BNG), 2005. Contaminated Land: Combined Clearance Certificate;EHS&Q MSC/2005/003, Contaminated Land/CC/001, Cult: 9266.British Nuclear Group (BNG), 2005. <strong>Sellafield</strong> <strong>Ltd</strong> Guidance on Best Practicable Means andBest Available Technique Assessment, <strong>Sellafield</strong> Site Procedure (SSP) 2.01.03A.British Nuclear Group (BNG), 2006. Site Remediation Strategy Gate C, Appendix A7.Eilbeck, K., 2006. Land and <strong>Groundwater</strong> short to medium term management andremediation strategy. BNFL Contaminated Land Programme.El-Ghonemy, H., 2004. SCLS Phase 1 – <strong>Sellafield</strong> <strong>Groundwater</strong> Conceptual Model. BNFLNuclear Sciences & Technology Services Report NSTS 4443.Environmental Agency (EA), 2007, Environment AgencyRequirement/Approval/Specification/Agreement/Notification (Radioactive Substances Act1993), Authorisation No. BX9838/CA3777, Requirement No. 1/9/003. Date of Issue: 1 April2007.Environmental Agency (EA). 2008. Environment AgencyRequirement/Approval/Specification/Agreement/Notification (Radioactive Substances Act1993), Authorisation No. BX9838/CB9754, Requirement No. 1/9/004. Date of Issue: 1 April2008.Henderson, D.E. and Hunter, J., 2004. SCLS Phase 1 – Interim Design for a Network of<strong>Groundwater</strong> Monitoring Wells at <strong>Sellafield</strong>. BNFL , Report NSTS 4669 (Issue 01).Hoenes, B., 2008. <strong>Sellafield</strong> Contaminated Land Project Leak Management and DetectionProgramme. <strong>Sellafield</strong> <strong>Ltd</strong> Contaminated Land ProgrammeHolmes, D.C. and Hall, D.H., 1980. The 1977-1979 geological and hydro-geologicalinvestigations at the Windscale Works. IGS Report 80/12.Hullock, T., 2007. Contaminated Land – Best Practicable Means Assessment.Contaminated Land, Commercial.BNFLHunter, J., 2004. SCLS Phase 1 – Conceptual Model of Contamination Below Ground at<strong>Sellafield</strong>. BNFL Nuclear Sciences & Technology Services Report NSTS 4920.Hunter, J., 2004. SCLMP – Appraisal of Existing <strong>Groundwater</strong> Monitoring Wells in SeparationArea. BNFL Nuclear Sciences & Technology Services Report NSTS 5155 (Issue 01).NIREX (1997), Synthesis of the Hydrogeological Characteristics of Quaternary Sequences inthe <strong>Sellafield</strong> Area, SA/97/001.Ostridge, C. and Spencer, S., 2007. Stakeholder and Regulator Engagement Plan. <strong>Sellafield</strong><strong>Ltd</strong> Contaminated Land Programme.Page 143 of 144


<strong>Groundwater</strong> Monitoring Annual Report 2008Parton, N., 2005. Review of <strong>Sellafield</strong> Interim Risk Assessment: Off-site Risks.Solutions Report 05/EN0206/4/3 Issue 2.NexiaSears, R. and Thompson, M., 2003. Preliminary Water Balance, <strong>Sellafield</strong>. EnvironmentalSimulations International report prepared for British Nuclear Fuels plc. Report Reference6228R1.<strong>Sellafield</strong> <strong>Ltd</strong>, 2008. Addendum to Combined Clearance Certificate B678/CCC/01: AddendumNumber B678/CCC/01/AD01, Cult: 12187.<strong>Sellafield</strong> <strong>Ltd</strong>., 2005. Best practice guidance note for decision making relating to optimisationof environmental discharges and disposals. <strong>Sellafield</strong> Site Procedure SSP 2.09A, BritishNuclear Group, March 2005).<strong>Sellafield</strong> <strong>Ltd</strong>., 2005. Guidance on Best Practicable Means and Best Available TechniqueAssessment. <strong>Sellafield</strong> Site Procedure (SSP) 2.01.03A, British Nuclear Group, September2005).Smith N.T., Henderson D.E., and Fowler L., 2006. Summary of Current Understanding ofContaminated Land and <strong>Groundwater</strong> at <strong>Sellafield</strong>. Nexia Solutions report (06)7627.Smith. N. and Cooper, S., 2004. SCLS Phase I – <strong>Sellafield</strong> Geologic Conceptual Model.BNFL Nuclear Sciences & Technology Services Report NSTS 4866.Sutton, C., 2007. Quality Assurance Programme Plan for <strong>Groundwater</strong> Monitoring. BNFLContaminated Land, Commercial.Towler, G., Bond, A. E., and Galais, N., 2004. SCLMP Risk Assessment Conceptual Model.BNFL Nuclear Sciences & Technology Services Report NSTS 4902.Vickery, A.C., Coleman, I.C. and Glaister, C.G., 2005a. Review of <strong>Sellafield</strong> perimetergroundwater monitoring programme. Westlakes Scientific Consulting <strong>Ltd</strong>, Report No.040093/01.Vickery, A.C., Coleman, I.C. and Glaister, C.G., 2005b. Review of <strong>Sellafield</strong> ContaminatedLand Monitoring Programme. Westlakes Scientific Consulting <strong>Ltd</strong>, Report No. 050268/01.Vickery, A.C., Coleman, I.C. and Glaister, C.G., 2005c. A practicable and integratedgroundwater monitoring programme proposed for the <strong>Sellafield</strong> site. Westlakes ScientificConsulting <strong>Ltd</strong>, Report No. 050268/02.World Health Organisation, 2006. Guidelines for Drinking Water Quality, 3 rd edition.Page 144 of 144

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!