Side Assembly<br />

SECTION-1<br />

Tools Required: -7/16” Box Wrench.<br />

Side parts Pack<br />

(1) Side Cill (Item # 1).<br />

(1) Gutter (Item # 2).<br />

(2) Side Brace (Item # 4). NOTE:- The Side Brace is distinguishable from the<br />

end brace by its length . The side brace is the longer of the two.<br />

Glazing bars (For required number see chart ).<br />

ASSEMBLY<br />

STEP-1 Lay out parts see (PIC-1) Gutter to the top cill at the bottom.<br />

STEP-2 Install “T” bolts in to gutter as (PIC-3) leve lose as shown.<br />

STEP-2 Assemble Glazing bars to the gutter section using bolts from (STEP-2).<br />

STEP-3 place “T” bolts into open end of glazing bar aprox ½” in from end<br />

(see PIC-4) and mount to cill using second hole in from the end, because<br />

this is the outside glazing bar place one end of the side brace onto the<br />

“T” bolt before installing the nut. Install all remaining G/bars repeat the<br />

procedure for the last G/bar using the remaining side brace, remember the<br />

inside face must face out.<br />

NOTE:- The inside face of the brace should face towards the end of the<br />

side wall.<br />

STEP-4 Secure the remaining (2) lose ends of the brace to the end slots in the gutter<br />

section using a ”T” bolt, this is to temporarily support the brace to stop<br />

damage until installing in (SECTION-4 Main assembly)<br />

NOTE:- DO NOT TIGHTEN BOLTS AT THIS TIME “ SNUG UP ONLY”.<br />

REPEAT ABOVE FOR THE SECOND SIDE.