At a glance<br />
<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />
Correction protocol<br />
WWTP Sevlievo<br />
<strong>AUER</strong> - <strong>Die</strong> <strong>Bausoftware</strong> GmbH<br />
Summary Sheet<br />
WWTP Sevlievo<br />
03 .0 1. 00.04 Driving a. extraction m2<br />
0002 Aereted Grit chamber 000 004 21.10.2008 N 459,000 m2<br />
Sum of item 03 .0 1. 00.04 459,000 m2<br />
03 .0 1. 00.05 Lean Concrete 10 cm C8/10 m2<br />
0002 Aereted Grit chamber 000 004 21.10.2008 N 1.020,000 m2<br />
Sum of item 03 .0 1. 00.05 1.020,000 m2<br />
03 .0 1. 00.07 Concrete Base Slab m3<br />
0002 Aereted Grit chamber 000 004 21.10.2008 N 437,500 m3<br />
Sum of item 03 .0 1. 00.07 437,500 m3<br />
03 .0 1. 00.08 Reinforcement 120 kg/m³ kg<br />
0002 Aereted Grit chamber 000 004 21.10.2008 N 119,000 kg<br />
Sum of item 03 .0 1. 00.08 119,000 kg<br />
03 .0 1. 00.09 Formwork BS m2<br />
0002 Aereted Grit chamber 000 004 21.10.2008 N 125,000 m2<br />
Sum of item 03 .0 1. 00.09 125,000 m2<br />
03 .0 1. 00.12 Formw. walls m2<br />
0002 Aereted Grit chamber 000 004 21.10.2008 N 84,000 m2<br />
Sum of item 03 .0 1. 00.12 84,000 m2<br />
03 .0 1. 00.23 Doors a. Gates 200x300 ST<br />
0001 Aereted Grit chamber 000 004 09.10.2008 N 2,000 ST<br />
Sum of item 03 .0 1. 00.23 2,000 ST<br />
MESH Nr. BCC WP IP Note<br />
Measurement 03 .0 sh.title 3. 00.01<br />
Calculation figure<br />
Lean Concrete m2<br />
Line no.Item no. Quantity u.<br />
0001 004 09.10.2008 Aereted Grit chamber 000 N 5,077 m2<br />
Sum of item 03 .0 3. 00.01 5,077 m2<br />
0001 Aereted Grit chamber 004<br />
03 .0 3. 00.02 Base Slabe<br />
(4)<br />
(1,915+0,09625+0,066+0,561)*2<br />
5,277 m2<br />
0001 Aereted Grit chamber 000 004 09.10.2008<br />
m3<br />
m3<br />
N 36,360<br />
5 03.03.00.01 (1,815+0,09625+0,066+0,561)*2<br />
=<br />
of<br />
5,077<br />
item 03<br />
m2<br />
.0 3.<br />
ß<br />
Sum 00.02 36,360 m3<br />
(4,95+0,395+1,65+0,815+0,078+0,51+3,74)*3<br />
36,414 m3<br />
(8)<br />
9 03.03.00.02 (4,95+0,395+1,65+,815+0,06+0,51+3,74)*3<br />
= 36,360 m3 ß<br />
(13)<br />
1*3<br />
3,000 ST<br />
14 03.01.00.23 1*2<br />
= 2,000 ST ß<br />
Original<br />
Item number Item text u.<br />
MESH Nr. Measurement sh.title BCC IP WP State Checked Result u.<br />
■ Checking of the bills of quantities<br />
■ Protocol of corrections<br />
■ Summary sheets with corrections<br />
■ Password protection<br />
■ Catalogue of formulas in accordance<br />
with current standard with<br />
more than 170 formulas<br />
■ Graphic display of the catalogue of<br />
formulas<br />
■ Price conversion according to the<br />
indexing process also for WWF<br />
■ Certificate of threshold value by<br />
price differences with an index<br />
■ Transfer of invoice data from<br />
<strong>AUER</strong> Success projects<br />
■ Data exchange and export according<br />
to the respectively applicable<br />
country specific norms and standards<br />
0002 Aereted Grit chamber 004<br />
(5)<br />
H*R/2<br />
6 03.01.00.04 H*R<br />
(14)<br />
H*R*3,9 ;m*m*m<br />
15 03.01.00.07 H*R*3,5 ;m*m*m<br />
(17)<br />
34*3,2<br />
18 03.01.00.08 34*3,5<br />
(20)<br />
H*R*0,8<br />
21 03.01.00.09 H*R<br />
229,500 m2<br />
= 459,000 m2 ß<br />
487,500 m3<br />
= 437,500 m3 ß<br />
108,800 kg<br />
= 119,000 kg ß<br />
100,000 m2<br />
= 125,000 m2 ß<br />
Billing Address<br />
0003 Aereted Grit chamber 004 No correction<br />
Project: C:\BS4\DAT\Demoprojekt in English Page: 1<br />
/ 19.11.2008 15:31 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />
Partial Invoice Nr. 00001<br />
Mondsee, 19.11.2008<br />
User:<br />
Project<br />
WWTP Sevlievo<br />
Item number<br />
CL Item text<br />
Quantity u. Parts of price Item price<br />
03 .0 1. 00.03 Sheet Piles<br />
03 .0 1. 00.04 Driving a. extraction<br />
Wa.: 22,82<br />
Ot.: 0,23<br />
459,000 m2 UP.: 23,05 EUR 10.579,95<br />
18,04 GBP 8.280,40<br />
Concrete 10 cm C8/10<br />
03 .0 1. 00.05 Lean<br />
Wa.: 135,19<br />
Ot.: 1,37<br />
1.020,000 m2 UP.: 136,56 EUR 139.291,20<br />
106,88 GBP 109.016,26<br />
Concrete Base Slab<br />
03 .0 1. 00.07<br />
Wa.: 17,16<br />
Ot.: 3,17<br />
437,500 m3 UP.: 20,33 EUR 8.894,38<br />
15,91 GBP 6.961,19<br />
Project: C:\BS4\DAT\Demoprojekt in English Page: 1<br />
/ 19.11.2008 16:22 Reinforcement 120 kg/m³<br />
FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />
03 .0 1. 00.08 Printed with <strong>AUER</strong> Success Version 5.00 - License<br />
Wa.: 34,31<br />
Ot.: 2,35<br />
119,000 kg UP.: 36,66 EUR 4.362,54<br />
28,69 GBP 3.414,34<br />
Formwork BS<br />
03 .0 1. 00.09<br />
Wa.: 39,98<br />
Ot.: 5,40<br />
125,000 m2 UP.: 45,38 EUR 5.672,50<br />
35,52 GBP 4.439,58<br />
Formw. walls<br />
03 .0 1. 00.12<br />
Wa.: 54,91<br />
Ot.: 3,56<br />
84,000 m2 UP.: 58,47 EUR 4.911,48<br />
45,76 GBP 3.843,97<br />
a. Gates 200x300<br />
03 .0 1. 00.23 Doors<br />
Wa.: 50,00<br />
Ot.: 785,00<br />
2,000 ST UP.: 835,00 EUR 1.670,00<br />
653,51 GBP 1.307,03<br />
Piles 175.382,05<br />
03 .0 1. 00.03 Sheet<br />
03 .0 1. 00.00 Inlet Pump Station Structure 175.382,05<br />
Project: C:\BS4\DAT\Demoprojekt in English Page: 2<br />
/ 19.11.2008 16:31 Printed with <strong>AUER</strong> Success Version 5.00 - License FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />