Measurement sh. 0003<br />
WWTP Sevlievo<br />
Ground floor<br />
a=35 = 35,000<br />
b=34 = 34,000<br />
F=a*b = 1.190,000<br />
03 .0 1. 00.01 Excavation<br />
5*52*566,65 = 147.329,000 m3 * 271,58 = 40.011.609,82<br />
03 .0 1. 00.02 Backfilling<br />
5*45*456,13 = 102.629,250 m3 * 34,66 = 3.557.129,81<br />
03 .0 1. 00.04 Driving a. extraction<br />
F*1,2 = 1.428,000 m2 * 23,05 = 32.915,40<br />
03 .0 1. 00.07 Concrete Base Slab<br />
456+46+48+9-79/89 = 558,112 m3 * 20,33 = 11.346,42<br />
03 .0 1. 00.10 Walls Ground floor<br />
@012 Pyramide<br />
b<br />
Grundfläche<br />
a<br />
H<br />
±H = 15,000 ±a = 12,000 ±b = 15,300 * = 1,000<br />
918,000 m3 29,94 = * = 27.484,92<br />
03 .0 1. 00.14 Concrete Ceilling<br />
@011 Prisma<br />
b<br />
Grundfläche<br />
a<br />
Aereted Grit chamber<br />
BCC : WP : 004 IP : Checked : N<br />
Item number<br />
Item text<br />
Calc.of measurement Result u. Unit price Amount<br />
±H = 15,000 ±a = 156,000 ±b = 56,000 * = 1,000<br />
131.040,000 m3 656,00 = * = 85.962.240,00<br />
See Measurement sh. 0003.1<br />
Created 22.10.2008 for the contractor checked _ _ . _ _ . _ _ _ _ for the client<br />
/ 09.12.2008 11:05 Project: C:\BS4\DAT\Demoprojekt in English Printed with <strong>AUER</strong> Success Version 5.00 - FA08264E-4C43-4EED-AF95-775CD5FCEDA6<br />
Measurement sheets with<br />
automatically prepared<br />
drawings<br />
At a glance<br />
■ Input of measurement sheets<br />
■ Volume import from the construction<br />
diary<br />
■ Formula catalogue for each valid<br />
standard, including more than 170<br />
formulas<br />
■ Graphic presentation of the formula<br />
catalogue and automatic preparation<br />
of sketches<br />
■ Numerous selection possibilities<br />
for recorded settlement volumes<br />
■ Price recalculation through indexing<br />
method, also for WWF<br />
■ Import of settlement data from<br />
other Success projects<br />
■ Data media exchange and data<br />
export according to the countryspecific<br />
standards<br />
■ E-mail transmission of zipped measurement<br />
sheets<br />
■ Selection of volume calculations by<br />
primary and supplemental orders<br />
Billing Address<br />
Invoice Nr. 00001<br />
Mondsee, 19.11.2008<br />
User:<br />
Invoice printing in one of the<br />
many printing formats<br />
Project<br />
WWTP Sevlievo<br />
Item number<br />
CL Item text<br />
Quantity u. Parts of price Item price<br />
03 .0 1. 00.01 Excavation<br />
Wa.: 34,96<br />
Ot.: 236,62<br />
77.512,500 m3 UP.: 271,58 EUR 21.050.844,75<br />
212,55 GBP 16.475.443,64<br />
03 .0 1. 00.02 Backfilling<br />
Wa.: 34,31<br />
Ot.: 0,35<br />
102.629,250 m3 UP.: 34,66 EUR 3.557.129,81<br />
27,13 GBP 2.783.987,65<br />
03 .0 1. 00.03 Sheet Piles<br />
03 .0 1. 00.04 Driving a. extraction<br />
Wa.: 22,82<br />
Ot.: 0,23<br />
1.615,000 m2 UP.: 23,05 EUR 37.225,75<br />
18,04 GBP 29.134,73<br />
03 .0 1. 00.05 Lean Concrete 10 cm C8/10<br />
Wa.: 135,19<br />
Ot.: 1,37<br />
1.020,000 m2 UP.: 136,56 EUR 139.291,20<br />
106,88 GBP 109.016,26<br />
03 .0 1. 00.07 Concrete Base Slab<br />
Wa.: 17,16<br />
Ot.: 3,17<br />
995,612 m3 UP.: 20,33 EUR 20.240,79<br />
15,91 GBP 15.841,45<br />
03 .0 1. 00.08 Reinforcement 120 kg/m³<br />
Wa.: 34,31<br />
Ot.: 2,35<br />
119,000 kg UP.: 36,66 EUR 4.362,54<br />
28,69 GBP 3.414,34<br />
03 .0 1. 00.09 Formwork BS<br />
Wa.: 39,98<br />
Ot.: 5,40<br />
125,000 m2 UP.: 45,38 EUR 5.672,50<br />