Waste Water Treatment Plant Dalaman/ Turkey - PSE Engineering ...
Waste Water Treatment Plant Dalaman/ Turkey - PSE Engineering ...
Waste Water Treatment Plant Dalaman/ Turkey - PSE Engineering ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>PSE</strong> <strong>Engineering</strong> GmbH<br />
Pfaffenstr. 11<br />
49610 Quakenbrück, Germany<br />
Phone +49 5431 14-0<br />
Fax +49 5431 14-191<br />
E-Mail info@pse-eng.de<br />
<strong>Waste</strong> <strong>Water</strong> <strong>Treatment</strong> <strong>Plant</strong> <strong>Dalaman</strong>/ <strong>Turkey</strong><br />
Client: <strong>Dalaman</strong> Municipality, <strong>Turkey</strong><br />
Location: <strong>Dalaman</strong>, <strong>Turkey</strong><br />
Engineer: INTERPLAN<br />
Architectural, <strong>Engineering</strong>, Consulting<br />
Abidin Davur Sokak<br />
No 5/11 0 6680<br />
Cankaya - Ankara / <strong>Turkey</strong><br />
Joint Venture Partner: ECE<br />
Insaat ve Turizm Limited Sirtketi<br />
Ugur Mumcu`nun Sok. 6/1<br />
TR - 06700 Gaziosmanpasa - Ankara<br />
(civil works)<br />
Capacity in Volume: 9120 m 3 /d<br />
Capacity in Inhabitant Equivalent: 60.000<br />
Year of Award of Contract: 1998<br />
Year of Completion: 2001<br />
incl.1 Year operation and maintenance<br />
Contract Amount: DM 26 Mio.<br />
Process Description: Construction of a turnkey plant<br />
Process Stages: • Screens/ mechanical treatment/<br />
aerated grit chamber/ primary<br />
sedimentation<br />
• Activated sludge biology<br />
• Final sedimentation<br />
• Raw sludge thickening/ sludge<br />
thickening/ mechanical dewatering<br />
Page 1 of 2
<strong>PSE</strong> <strong>Engineering</strong> GmbH<br />
Pfaffenstr. 11<br />
49610 Quakenbrück, Germany<br />
Phone +49 5431 14-0<br />
Fax +49 5431 14-191<br />
E-Mail info@pse-eng.de<br />
<strong>Waste</strong> <strong>Water</strong> <strong>Treatment</strong> <strong>Plant</strong> <strong>Dalaman</strong>/ <strong>Turkey</strong><br />
Scope of Delivery: Complete mechanical part<br />
Scope of Services: • Detail engineering<br />
• Supply of mechanical equipment<br />
• Supervision of installation<br />
• Commissioning<br />
• <strong>Plant</strong> operation<br />
• Leadership of consortium<br />
Operation and Maintenance for 1 Year: • Supervision<br />
• Local personal<br />
• Consumption (chemicals / electricity)<br />
• Maintenance<br />
• Start in April 2000<br />
Peculiarities: Complete financing of the project<br />
Page 2 of 2