08.07.2015 Views

Overview Quality Assurance at LANL - Acquisition Services ...

Overview Quality Assurance at LANL - Acquisition Services ...

Overview Quality Assurance at LANL - Acquisition Services ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Exhibit F Requirements – GeneralTo perform subcontract work <strong>at</strong> <strong>LANL</strong>, SUBCONTRACTOR is required to complywith CONTRACTOR’S 10 CFR 851 Worker Safety and Health Program, therequirements of which are set forth in Exhibit F.• Minimum Performance Eligibility Factors• Subcontractor and all sub-tiers• Three-year average (confirmed with OSHA 300 logs)Experience Modific<strong>at</strong>ion R<strong>at</strong>e (EMR) Maximum Allowable Average 1.0Total Recordable Injury/Illness Case R<strong>at</strong>e (TRC) Maximum Allowable Average 3.2Days Away From Work , Restriction, or Job TransferR<strong>at</strong>e (DART)Maximum Allowable Average 1.4• R<strong>at</strong>es th<strong>at</strong> are above the maximum allowable average will be reviewed on a case by case basisU N C L A S S I F I E DSlide 15Oper<strong>at</strong>ed by Los Alamos N<strong>at</strong>ional Security, LLC for the U.S. Department of Energy’s NNSA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!