InputIncrease Mine life to 20 yearsCapital cost changes by $30mMining cost changes by 50c/tSilver price changes by $3/ozSilver recovery changes 5%<strong>Copper</strong> recovery changes 5%Exchange rate changesDiscount rate changed to 8%Increase in strip ratio by 1Full Site Diesel Power GenerationNPV Impact$10m (at $2.00/lb copper)$4.5m assumes 50% debt funded$43.5m$5.6m$2.4m$21.4mMain impact on capital will be in <strong>BFS</strong>$29.6m$8.7m$35.3m(20c/lb copper produced)September 2009<strong>Copper</strong> price sensitivity reported separately18