09.07.2015 Views

REGENERATOR REACTOR HEAD Cutting T

REGENERATOR REACTOR HEAD Cutting T

REGENERATOR REACTOR HEAD Cutting T

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DESTEC PROCEDURE1. Bottom rail showingsecure welds2. Bottom rail with toprail mounting bracketsin position3. Rail positions and brackets 4. Rail positions showingnon-removable obstructions5. Top and bottom rails readyfor dressing6. ‘C’ plate brackets tackedover cut line area7. ‘C’ plate brackets fullywelded and settingmachine on the rail8. Initial cut 9. Finished prep showingrefractory wall10. <strong>Cutting</strong> the refractory11. Grinding frame 12. Re-gen head with‘C’ plates andwedges positioned13. Re-gen head with‘C’ plates andwedges fitted14. Prep completed.‘C’ plates andalignment plates fitted15. Re-gen head lift(Refractory lining of ceramic capable of resisting & maintaining high temperatures).WWW.TEESING.COM | +31 70 413 07 50www.destec.co.uk DESTEC <strong>REGENERATOR</strong> & <strong>REACTOR</strong> VESSEL <strong>HEAD</strong> REMOVAL 03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!