there is visible permanent deformation.The test pressure shall be applied for not less than 15 minutes. Pressure decay shallnot exceed 0.1kPa per minute.Any evidence <strong>of</strong> leakage or loss <strong>of</strong> pressure shall be investigated, identified <strong>and</strong>recorded.7.6.3.8 Alternatives to hydraulic testingNOTE:RID / ADR Chapters 6.8.2.4.2 requires a hydraulic pressure test to be carried atperiodic examinations but this is qualified by a footnote which states:“In special cases <strong>and</strong> with the agreement <strong>of</strong> the expert approved by the competentauthority, the hydraulic pressure test may be replaced by a pressure test usinganother liquid or gas, where such an operation does not present any danger.”The hydraulic pressure test may be replaced by an equivalent method based on Non-Invasive <strong>Inspection</strong> (NII) accredited by UKASNon Invasive <strong>Inspection</strong> (NII) is an assessment regime that may use a combination <strong>of</strong>Non-Destructive <strong>Testing</strong> (NDT) techniques such as ultrasonics, acoustic emission,radiography, dye penetrant, magnetic particle, electromagnetic, leaking testing or othersuitable non-destructive test method.Suitable methods may be found in Table 9 below:Table 9 - St<strong>and</strong>ards for NDTSt<strong>and</strong>ardApplicationEN 444EN 1435EN 1714EN 1290radiographic techniquesradiographic techniquesultrasonic techniquesmagnetic particle techniquesWhere an inspection body intends to undertake a pressure test with a substance otherthan water then the following shall apply: a detailed procedure, based on theprocedure with water above, including a risk assessment taking account that it will notpresent any danger shall be prepared the procedure shall be accredited by UKAS <strong>and</strong>included in the schedule <strong>of</strong> the inspection body.The requirements <strong>of</strong> EN12972 Annex C shall be complied with if pressure testing withgas. The procedure <strong>and</strong> supporting training shall take account <strong>of</strong> the differingconditions found at the site.20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!