10.07.2015 Views

2012 SERC CMEP Implementation Plan - SERC Home Page

2012 SERC CMEP Implementation Plan - SERC Home Page

2012 SERC CMEP Implementation Plan - SERC Home Page

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Resource and Demand Balancing<strong>SERC</strong> Filing Due Dates (Revised 1-17-12)<strong>SERC</strong> Filing Due Dates<strong>2012</strong> Compliance Program for Data Submittals (filing deadlines in <strong>2012</strong>)BAL-001-0.1aReal Power Balancing Control PerformanceMonthly Previous Month All BABAL-002-0Disturbance Control PerformanceFacilities Design, Connections, and MaintenanceFAC-003-1Vegetation Management ProgramTransmission <strong>Plan</strong>ningQuarterly Previous Quarter All BA RSGQuarterly Previous Quarter 3 TOTPL-001-0.1TPL-002-0aTPL-003-0aSystem Performance Under Normal Conditions6/1/<strong>2012</strong> 4/1/2011 - 3/31/<strong>2012</strong> 3 PA TPSystem Performance Following Loss of a Single BESElement 6/1/<strong>2012</strong> 4/1/2011 - 3/31/<strong>2012</strong> 3 PA TPSystem Performance Following Loss of Two or MoreBES Elements 6/1/<strong>2012</strong> 4/1/2011 - 3/31/<strong>2012</strong> 3 PA TPTPL-004-0 System Performance Following Extreme BES Events6/1/<strong>2012</strong> 4/1/2011 - 3/31/<strong>2012</strong> 2 PA TPCritical Infrastructure Protection<strong>2012</strong> Compliance Program for Self-Certifications (filing deadlines in 2013)CIP-002-3CIP-003-3CIP-004-3CIP-005-3aCIP-006-3cCIP-007-3CIP-008-3Critical Cyber Asset IdentificationSecurity Management ControlsPersonnel & TrainingElectronic Security Perimeter(s)Physical Security of Critical Cyber AssetsSystems Security ManagementIncident Reporting and Response <strong>Plan</strong>ning1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA GO GOP IA LSE RC TO TOP TSP1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA GO GOP IA LSE RC TO TOP TSP1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA GO GOP IA LSE RC TO TOP TSP1/31/2013 2/2/2011 - 12/31/<strong>2012</strong> All BA GO GOP IA LSE RC TO TOP TSP1/31/2013 5/19/2011 - 12/31/<strong>2012</strong> All BA GO GOP IA LSE RC TO TOP TSP1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA GO GOP IA LSE RC TO TOP TSP1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA GO GOP IA LSE RC TO TOP TSPCIP-009-3Recovery <strong>Plan</strong>s for Critical Cyber Assets1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA GO GOP IA LSE RC TO TOP TSPInterconnection Reliability Operations and Coordination and Transmission OperationsIRO-004-2Reliability Coordination - Operations <strong>Plan</strong>ning1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA TOP TSPTOP-007-0Reporting SOL and IROL ViolationsPersonnel Performance, Training, and Qualifications1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All RC TOPPER-002-0Operating Personnel Training1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA TOPPER-003-0Operating Personnel Credentials1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA RC TOPAnnual Self-Certification of Monthly and Quarterly Data SubmittalsBAL-001-0.1aBAL-002-0Real Power Balancing Control PerformanceDisturbance Control Performance1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA1/31/2013 1/1/<strong>2012</strong> - 12/31/<strong>2012</strong> All BA RSG<strong>Page</strong> 3 of 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!