10.07.2015 Views

Manual for External Monitoring of Fortified Maize Flour - A2Z: The ...

Manual for External Monitoring of Fortified Maize Flour - A2Z: The ...

Manual for External Monitoring of Fortified Maize Flour - A2Z: The ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B. TECHNICAL AUDITING AND INSPECTION VISITSI. Objectives and Accountability<strong>The</strong> purpose <strong>of</strong> the technical auditing and inspections visits is to verify that the maize mill has implemented and continues to apply aprogram <strong>for</strong>:• Quality assurance <strong>of</strong> premix receipt, storage and distribution• Quality assurance <strong>of</strong> the maize flour <strong>for</strong>tification process• Quality control <strong>of</strong> the <strong>for</strong>tified maize flour<strong>The</strong> Inspector should visit the premises and plan to spend an hour or two to make detailed examination <strong>of</strong> processes and verifydocumentation. <strong>The</strong> visit should be made with the view to assist the factory per<strong>for</strong>m better and the frequency <strong>of</strong> the visits may be scaleddown or scaled up depending on the per<strong>for</strong>mance <strong>of</strong> the factory. Where possible, and when the <strong>for</strong>tification program is new, the visitsshould be done on a monthly basis and be scaled down depending on the success <strong>of</strong> the <strong>for</strong>tification in the factory. Once the operationis working smoothly, two visits per year may be sufficient.<strong>The</strong> people directly responsible <strong>for</strong> achieving these objectives are the Food Control Authority inspectors, who should pass on the results<strong>of</strong> the visits to their Supervisor. <strong>The</strong> Supervisor is responsible <strong>of</strong> preparing the reports to the maize mills and reporting every threemonths to the Head <strong>of</strong> the Food Control Authority and any other government body involved in the en<strong>for</strong>cement <strong>of</strong> <strong>for</strong>tified foods.II. Procedure (Food Inspectors)a. Opening session1. Start the visit with an opening session where the General Manager, Factory or Production Manager, Quality Assurance and Control4 <strong>of</strong> 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!