10.07.2015 Views

Manual for External Monitoring of Fortified Maize Flour - A2Z: The ...

Manual for External Monitoring of Fortified Maize Flour - A2Z: The ...

Manual for External Monitoring of Fortified Maize Flour - A2Z: The ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MANUAL FOR EXTERNAL MONITORING OF FORTIFIED MAIZE FLOUR(Technical Auditing and Inspection)Technical auditing and inspection activities are carried out at maize mills as part <strong>of</strong> the en<strong>for</strong>cement activities per<strong>for</strong>med by the governmentin order to ensure that <strong>for</strong>tified maize flour meets the nutrient quality and safety specifications established in regulations. During the technicalaudits, the per<strong>for</strong>mance <strong>of</strong> quality assurance and quality control activities conducted by the producer is examined. <strong>The</strong> con<strong>for</strong>mity <strong>of</strong> the<strong>for</strong>tified food with technical specifications is determined through sampling and chemical analysis <strong>of</strong> flour samples collected from the factory.Samples <strong>of</strong> premix are also taken to verify the validity <strong>of</strong> the Certificate <strong>of</strong> Analysis (COA) provided by the supplier.This manual presents steps <strong>for</strong> carrying out technical auditing and inspection in maize mills. <strong>The</strong> Food Control Authority in the country isresponsible <strong>for</strong> carrying out the auditing and inspection activities <strong>of</strong> <strong>for</strong>tified foods, in coordination with other government bodies involvedin the en<strong>for</strong>cement <strong>of</strong> food <strong>for</strong>tification regulations.Since technical audits are based on checking the producer’s records, the objectives which are measured by indicators and criteria <strong>of</strong>success are based on similar objectives used <strong>for</strong> the QA/QC system. <strong>The</strong> manual also describes the people responsible <strong>for</strong> each stage.As any en<strong>for</strong>cement procedure carried out by a government body, the warnings and legal actions to be taken when non-compliance occursshould be defined and applied where necessary.Results <strong>of</strong> auditing and inspection activities should be consolidated twice a year in order to determine the degree <strong>of</strong> success in fulfilling the<strong>for</strong>tification goals identify obstacles to overcome and propose actions to be taken. It is recommended that an annual report be prepared andpublished where data from this external monitoring is presented graphically to describe the status <strong>of</strong> the maize flour <strong>for</strong>tification programin the country, along with in<strong>for</strong>mation from other food control or surveillance activities.<strong>The</strong> sections included in this manual are:• Planning inspection visits• Technical auditing and inspection visits• Inspection by corroborating trials1 <strong>of</strong> 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!