POWER SUPPLY GUIDELINES FOR MAJOR PROJECTS

POWER SUPPLY GUIDELINES FOR MAJOR PROJECTS

POWER SUPPLY GUIDELINES FOR MAJOR PROJECTS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 Requirements2.2 General Requirements• Generally, in case of private switchgear, approval for singleline diagram should be obtained prior to purchase.• All the distribution network requirements and guidelines for11kV and 22kV supply mentioned in Annexure - 2 shall bestrictly followed.2.2 General Requirements1. The main developer shall appoint a reputed consultant to preparethe infrastructure including power supply Master Plan of their MajorProject development, in order to avail DEWA approval.2. The developers or their consultants shall submit the documents aslisted in Annexure – 1 for DEWA review to Power TransmissionPlanning Department:Addressed to:Dr. Awad IbrahimVice President – Power Transmission PlanningDubai Electricity and Water AuthorityP O Box – 564, DubaiFax: 04 - 32492063. The listed documents shall be submitted in three sets of hardcopies and 1 set of soft copy.4. The details as mentioned above shall be submitted well in advanceto DEWA and got approved to avoid any delay in starting theproject.5. Once approved, DEWA expects that the developer will adhere tothe plan and any minor changes in the project plan, changes inphasing, etc. shall be informed to DEWA in time and got approved.Changes on works during the execution stage shall not beentertained.Power Supply Guidelines for Major Projects 8 of 14 June 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!