10.07.2015 Views

POWER SUPPLY GUIDELINES FOR MAJOR PROJECTS

POWER SUPPLY GUIDELINES FOR MAJOR PROJECTS

POWER SUPPLY GUIDELINES FOR MAJOR PROJECTS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2 Requirements2.1 Technical Requirements2.1.12 Requirement for 22-11kV Network/Design Approval• Latest planning of the development (with both hard & softcopy).• Approved 22-11kV Substation location (Refer to Annexure-2 : Distribution Substation Guideline for approval of 11kVand 22kV substations).• Total connected load, maximum demand and capacity forindividual 22-11kV substation.• Realistic power requirement date.• Zone-wise/phase-wise load details with respective 132/22-11kV substations to be provided if the number of 132/22-11kV substations is two or more.• In case of number of 132/22-11kV substations are more,project loads should be allocated to respective 132/22-11kV substations for effective network design (Phasewise). Also the 132/22-11kV substations need to beplanned for commissioning to match the powerrequirement date of projects.• District cooling loads (if any) should be located adjacent tothe related 132/22-11kV substation.• No source metering is allowed (metering equipment to bearranged in the 22-11kV switchgear room).• 22-11kV corridors details for all the roads within the projectboundary.• No 22-11kV corridors will be accepted under carriageway.• Approved cross section of all the roads (with 22-11kVcorridor indicated) to be submitted at the time of 22-11kVnetwork design request.Power Supply Guidelines for Major Projects 7 of 14 June 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!