2 Requirements2.1 Technical RequirementsoooEnough space/corridor for taking out 60 numbers of11kV outgoing cables or 30 numbers of 22kV cableswith proper duct arrangement with minimum 150mmspace between the cables.Location of 132/22-11kV substations should beprovided at the load centre and close to district coolingplants if available.When a project requires more than one 132/22-11kVsubstation, the feeding zone of each substation shallbe specified.2.1.9 Site Plan for 132/22-11kV Substation• Approved site plan /affection plan (in the ownership ofDEWA) of the substation plot is required from theconcerned authority. The developer shall confirm, whetherthe building permit for the substation building will be issuedby Dubai Municipality or some other authority.2.1.10 Corridors• 400 kV overhead lineso80m wide corridor (double circuit tower line).• 132 kV overhead lineso32m wide corridor (double circuit tower line).• 132 kV underground cablesoo2.5m for each circuit.Minimum clearance of 2 meters shall be maintainedbetween 132kV corridor and nearby pressurepipelines.Power Supply Guidelines for Major Projects 5 of 14 June 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!