10.07.2015 Views

ABC of ABT - MP Power generating company limited

ABC of ABT - MP Power generating company limited

ABC of ABT - MP Power generating company limited

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

at a much higher UI rate. On the other hand, during high-frequencyconditions, a State can draw extra power at a low rate, and is thusencouraged to back down its own costlier <strong>generating</strong> stations. An underdrawalduring high-frequency conditions means that the State pays for thescheduled power quantum unnecessarily. It should either reduce its schedule,or increase its drawal.For the above purpose, the energy is metered in 15-minute time blocks, sincefrequency keeps changing (and the UI rate with it). The metered energy isthen compared with the scheduled energy for that 15-minute time block, andthe difference (+ or -) becomes the UI energy, as illustrated in figure - 3. Thecorresponding UI rate is determined by taking the average frequency for thesame 15-minute time block into account.1000UI800MW6004000 3 6 9 12 15 18 21 24TimeScheduleActualFigure - 3Also, for each Central <strong>generating</strong> station and State, the actual energy has tobe metered on a net basis, i.e., algebraic sum <strong>of</strong> energy metered on all itsperipheral interconnection points, for every 15-minute time block. All UIpayments are made into and from a regional UI pool account, operated by theconcerned RLDC.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!