ABC of ABT - MP Power generating company limited
ABC of ABT - MP Power generating company limited
ABC of ABT - MP Power generating company limited
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
at a much higher UI rate. On the other hand, during high-frequencyconditions, a State can draw extra power at a low rate, and is thusencouraged to back down its own costlier <strong>generating</strong> stations. An underdrawalduring high-frequency conditions means that the State pays for thescheduled power quantum unnecessarily. It should either reduce its schedule,or increase its drawal.For the above purpose, the energy is metered in 15-minute time blocks, sincefrequency keeps changing (and the UI rate with it). The metered energy isthen compared with the scheduled energy for that 15-minute time block, andthe difference (+ or -) becomes the UI energy, as illustrated in figure - 3. Thecorresponding UI rate is determined by taking the average frequency for thesame 15-minute time block into account.1000UI800MW6004000 3 6 9 12 15 18 21 24TimeScheduleActualFigure - 3Also, for each Central <strong>generating</strong> station and State, the actual energy has tobe metered on a net basis, i.e., algebraic sum <strong>of</strong> energy metered on all itsperipheral interconnection points, for every 15-minute time block. All UIpayments are made into and from a regional UI pool account, operated by theconcerned RLDC.12