10.07.2015 Views

ABC of ABT - MP Power generating company limited

ABC of ABT - MP Power generating company limited

ABC of ABT - MP Power generating company limited

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

100CBAEFGH75DUNIT LOAD (%)50J25049.5 49.6 49.7 49.8 49.9 50.0 50.1 50.2 50.3 50.4 50.5FREQUENCY (Hz)Figure -7In the event <strong>of</strong> unforeseen tripping <strong>of</strong> a <strong>generating</strong> unit or <strong>of</strong> a major auxiliary(forced outage), which brings down the availability <strong>of</strong> the station suddenly, theoperator should quickly assess the possibility <strong>of</strong> bringing back the unit /auxiliary and resuming generation as per the given schedule. In case this ispossible within an hour or two, the operator should inform the RLDC that thestation’s availability declaration (for commercial purpose) and schedule shouldnot be revised. On the other hand, in case the station availability is foreseento remain curtailed for a longer duration, the RLDC should be formallyinformed about the change in station availability, along with the curtailmentduration, to the extent determined. The RLDC would give effect to theavailability change, and corresponding revision <strong>of</strong> schedules, after one hour.During the intervening period, the deviation from schedule would be recordedas UI, and the station would have to pay back for the shortfall at the prevailingUI rate, while getting paid the capacity charge and energy charge respectively24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!