Third party inspection in infrastructure and accreditation
Third party inspection in infrastructure and accreditation
Third party inspection in infrastructure and accreditation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
“International Summit PPP <strong>in</strong> Road<br />
Delhi, 16 February 2012<br />
Quality <strong>in</strong> design<br />
Pillars <strong>and</strong> benefits of best <strong>in</strong>ternational rules for improv<strong>in</strong>g quality <strong>in</strong> design<br />
Policy Benefits<br />
separation between design<br />
completion <strong>and</strong> construction works:<br />
(tender<strong>in</strong>g for construction cannot start<br />
without prior design validation)<br />
def<strong>in</strong>ition of each stage <strong>in</strong> the<br />
design process<br />
def<strong>in</strong>ition of deliverables (<strong>and</strong><br />
related contents) required at the end<br />
of each stage of the design process<br />
use of third <strong>party</strong> accredited bodies<br />
for design validation<br />
Reduction of over costs’ risks <strong>in</strong> construction<br />
stage due to changes <strong>in</strong> design requirements<br />
Effectiveness improvement of controls <strong>in</strong> the<br />
design process<br />
Improvement <strong>in</strong> responsibilities identification<br />
Reduction of risks <strong>and</strong> costs ris<strong>in</strong>g <strong>in</strong> the<br />
construction stage due to uncomplete designs<br />
(technical description, draw<strong>in</strong>gs, reports, etc.)<br />
Improvement of design <strong>in</strong>formation reliability<br />
Reduction of over costs due to design contents<br />
(mistake <strong>in</strong> structure calculation, bill of<br />
quantity)