20.11.2012 Views

Third party inspection in infrastructure and accreditation

Third party inspection in infrastructure and accreditation

Third party inspection in infrastructure and accreditation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

“International Summit PPP <strong>in</strong> Road<br />

Delhi, 16 February 2012<br />

DIRECTIVE 2004/18/EU of 31 March 2004 on the coord<strong>in</strong>ation of procedures for<br />

the award of public works contracts, public supply contracts <strong>and</strong> public service<br />

contracts<br />

Italy: Law 163/2006 (ex Decree n. 34/2000)<br />

� M<strong>and</strong>atory pre-qualification for each work above 150.000 euros<br />

� Contractors must be prequalified <strong>in</strong> classes for:<br />

� type of works<br />

� size of works (treshold based on tender amount)<br />

� Only pre-qualified contractors <strong>in</strong> a particular class (SOA) can be <strong>in</strong>vited to bid<br />

� Pre-qualification is<br />

� conducted by Accredited <strong>Third</strong> Party bodies (accord<strong>in</strong>g to ISO 17020)<br />

� granted for 3 years<br />

Regulatory Framework<br />

� subject to yearly surveillance <strong>and</strong> monitor<strong>in</strong>g

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!