22.11.2012 Views

Schaum's Outline Series

Schaum's Outline Series

Schaum's Outline Series

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

110<br />

SQA—John<br />

Responsibilities: Conduct of all reviews, walk-throughs, and inspections, review of<br />

all documents and reports, tracking of all problem reports, and submission of weekly<br />

problem report<br />

Section 4. Documentation<br />

Software Requirements Specification<br />

Software Design Using UML and OCL<br />

Software Test Plan<br />

Software Test Report<br />

User Manual<br />

Each document will be reviewed in the draft version and inspected in the final version. The<br />

SQA lead (John) will be responsible for conducting all reviews and inspections.<br />

Section 5. Standards, Practices, Conventions, and Metrics<br />

XYZ Corporation Coding Standards will be used. The SQA team will conduct inspections<br />

of all code to ensure compliance. The compliance report will be submitted to the project<br />

lead.<br />

Unadjusted function points will be counted on all components. LOC will be counted on<br />

all classes.<br />

Section 6. Reviews and Audits<br />

The following reviews will be done. The SQA lead will conduct each review and submit the<br />

report to the project lead for approval.<br />

Reviews:<br />

Software Requirements<br />

Preliminary Design Review<br />

Walk-Throughs of Each Class Design<br />

Code Inspections<br />

Section 7. Test<br />

Testing will be accomplished according to a test plan to be developed by the SQA team<br />

and approved by the project lead.<br />

Section 8. Problem Reporting<br />

All problems will be reported to the appropriate lead. If appropriate, the lead will submit a<br />

problem report to the SQA lead, who will enter the problem report into the problem<br />

tracking system. Resolution of the problem will be reported to the SQA lead. A weekly<br />

problem tracking report will be submitted to the project lead.<br />

Section 9. Tools, Techniques and Methodologies<br />

None.<br />

Section 10. Code Control<br />

CHAPTER 7 Software Quality Assurance<br />

The XYZ Corporation configuration management system will be used.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!