10.07.2015 Views

Public reports pack PDF 8 MB - Agendas, Meetings and Minutes

Public reports pack PDF 8 MB - Agendas, Meetings and Minutes

Public reports pack PDF 8 MB - Agendas, Meetings and Minutes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Planning Committee - 2 July 2009Phase 3 requires that a scheme of remediation <strong>and</strong>/or monitoring toensure the site is suitable for its proposed use to be submitted to<strong>and</strong> approved in writing by the Local Planning Authority (LPA). Theremediation shall be carried out in accordance with the approvedscheme <strong>and</strong> the applicant shall provide written verification to thateffect.14. The development shall not be occupied until any approved remedialworks, have been carried out <strong>and</strong> a full validation report has beensubmitted to <strong>and</strong> approved in writing by the Local PlanningAuthority. In the event that gas protection is required, all suchmeasures shall be implemented in full <strong>and</strong> confirmation ofsatisfactory installation obtained in writing from a Building ControlRegulator. 14. That notwithst<strong>and</strong>ing the submitted l<strong>and</strong>scapingscheme, no development shall take place until there has beensubmitted to <strong>and</strong> approved in writing by the Local PlanningAuthority a revised scheme for l<strong>and</strong>scaping the site which shallinclude:-a) details of the proposed tree <strong>and</strong> shrub planting including theirspecies, number, sizes <strong>and</strong> positions, together with grassseeded/turfed areas,b) details of the existing trees <strong>and</strong> hedgerows to be retained aswell as those to be felled, including existing <strong>and</strong> proposed soillevels at the base of each tree/hedgerow <strong>and</strong> the minimumdistance between the base of the tree <strong>and</strong> the nearest edge ofany excavation,c) details of the hard surface areas, pavements, pedestrianareas, crossing points <strong>and</strong> steps.15.That all planting, seeding or turfing comprised in the approveddetails of l<strong>and</strong>scaping shall be carried out in the first planting <strong>and</strong>seeding seasons following the occupation of the building(s) or onthe completion of the development, whichever is the sooner; <strong>and</strong>that any trees <strong>and</strong> shrubs which within a period of five years fromthe completion of the development die, are removed or becomeseriously damaged or diseased shall be replaced in the nextplanting season with others of similar size <strong>and</strong> species, unless theLocal Planning Authority gives written consent for any variation.(Councillor Wood requested that it be noted that he did notparticipate in the vote as he had not been present for the Officer’spresentation <strong>and</strong> the debate)37 2 Laburnum Grove, BanburyThe Committee considered a report of the Head of Development Control <strong>and</strong>Major Developments for the removal of a flat roof over a dining area, theconstruction of a single story extension <strong>and</strong> the installation of a lean to roofover the extension <strong>and</strong> existing dining area.Page 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!