Supervisor’s Guide to Field Level Risk Assessment Part 2: Training OthersTime Objective Content Method Helps15 minutes Describe the process<strong>of</strong> Field Level RiskAssessment• Read “Removal <strong>of</strong> the Heat Exchanger” Case• Ask participants what went wrong. Get a replyfrom at least 2 or 3 people. Invite others to givetheir ideas.• Lead the discussion to the realization that theworker didn’t realize how serious the hazard wasand failed to steps to control it.• Write ASSESS RISK on the flip chart.• Explain that when we assess a hazard we areassessing <strong>risk</strong>, considering the possibleconsequences <strong>of</strong> a hazard and how likely it is tohappen.• Read the “ Removal <strong>of</strong> the Rope Sling” Case• Ask participants what went wrong. Get a replyfrom at least 2 or 3 people. Invite others to givetheir ideas.• Lead the discussion to the realization that therehad been a change in the plan. Another workerhad been added. Additional hazards had not beenidentified. The <strong>risk</strong> was not assessed andadequate controls were not put into place.• Write CONTROL RISK on the flipchart• Explain the term “controls”. Controls areactions aimed at reducing <strong>risk</strong>s to <strong>level</strong>s that areacceptable.• State that Field Level Risk Assessment is asimple process, carried out every day on every jobby every person working there. It is a way toidentify hazards, assess the seriousness <strong>of</strong> the<strong>risk</strong>s and control the <strong>risk</strong>.Read and Discuss Case Study Overhead#3 Removal <strong>of</strong>the HeatExchangerTube CaseFlip chart -Assess RiskRead and Discuss Case Study Overhead#4 Removal <strong>of</strong>the Rope SlingCaseFlip chart -Control RiskIntroduce the Field Level RiskAssessment ModelOverhead#5 Field LevelRiskAssessment Is:<strong>Construction</strong> <strong>Owners</strong> <strong>Association</strong> <strong>of</strong> Alberta 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!