10.07.2015 Views

field level risk assessment - Construction Owners Association of ...

field level risk assessment - Construction Owners Association of ...

field level risk assessment - Construction Owners Association of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Supervisor’s Guide to Field Level Risk Assessment Part 2: Training OthersTime Objective Content Method HelpsUse the MemoryJogger questions todo a Field LevelRisk Assessment.• Review the use <strong>of</strong> the Risk Assessment Matrix.• Trace the “mental lines” on the overhead as youexplain them. “Find the code for the consequencesand the probability along the left side and the top<strong>of</strong> the Risk Assessment Tool. Draw a mental lineacross the diagram from the consequences codeand down the diagram from the probability code.The point where they meet is the code for the<strong>assessment</strong> <strong>of</strong> the <strong>risk</strong> associated with thisparticular hazard.”• Point to the <strong>risk</strong> <strong>assessment</strong> codes, H, M, and L, inthe bottom right hand nine squares <strong>of</strong> the tool.H means high <strong>risk</strong>; M means medium <strong>risk</strong>;L means low <strong>risk</strong>.• The outcome <strong>of</strong> the <strong>risk</strong> <strong>assessment</strong> will help todetermine the most appropriate kind <strong>of</strong> controls touse.• Ask “ What is the <strong>level</strong> <strong>of</strong> <strong>risk</strong> associated witheach hazard in the ‘ Replacing a Light Bulb’ casestudy?”• You may wish to use the blank overhead and havethe group assess the <strong>level</strong> <strong>of</strong> <strong>risk</strong> or you candiscuss the <strong>assessment</strong> that the is on the overhead.• While using the overhead, direct participants touse the Risk Assessment Matrix in the Worker’sGuide to Field Level Risk Assessment Page 8.• Ask “ What would be the result if we used thismethod <strong>of</strong> assessing <strong>risk</strong> while we are doingwork?”Demonstrate the Use <strong>of</strong> the RiskAssessment MatrixLead a Discussion using the RiskAssessment MatrixLead a Discussion About Using the RiskAssessment MatrixOverhead#15 RiskAssessmentMatrixOverhead#16 and #17Assessing Riskin Replacing aFluorescentLamp (blankand theanswers)Worker’sGuide to FieldLevel RiskAssessmentPage 8<strong>Construction</strong> <strong>Owners</strong> <strong>Association</strong> <strong>of</strong> Alberta 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!