10.07.2015 Views

field level risk assessment - Construction Owners Association of ...

field level risk assessment - Construction Owners Association of ...

field level risk assessment - Construction Owners Association of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

#4“Removal <strong>of</strong> a Rope Sling” CaseA crew was unloading cable from a pickertruck flatbed. There were two people doingthe job as was required in the job plan for aheavy lift. The plan had included carefulpositioning <strong>of</strong> both workers. All had goneaccording to the plan.Another worker on site noticed that the twowere having some difficulty removing thetwo and a half-inch wire rope sling from thecrane hook and came to assist them.While working together, the rope slingstruck the third worker. This worker wasinjured seriously, having a broken nose, andcuts to his lower lip requiring 8 stitches.<strong>Construction</strong> <strong>Owners</strong> <strong>Association</strong> <strong>of</strong> Alberta 38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!