10.07.2015 Views

High Resistance Decade M-109R - meatest.cz

High Resistance Decade M-109R - meatest.cz

High Resistance Decade M-109R - meatest.cz

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Basic technical data<strong>High</strong> <strong>Resistance</strong> <strong>Decade</strong> M-<strong>109R</strong><strong>Resistance</strong> range from 1 MOhm to 12,221 GOhmMaximum working voltage 5 kV DCAccuracy from 0,1% to 1%Temperature coefficient < 100 ppm / CVoltage coefficient < 1 ppm / V2,3 - wire connectionInternal accumulator / power line adapterInterface RS - 232o


Front panel ergonomy<strong>High</strong> resistance decade box is aimed for calibrating of insulation meters and megaohm-meters.It is suitable for calibration laboratories and service centres, where can be used also fortesting or setting of high resistance meters. <strong>High</strong> voltage relays with extremely high insulationresistance are used for switching of resistance components.M-<strong>109R</strong> is equipped with indication of input terminal overload. Instrument is supplied fromaccumulator or power line adapter. Control is possible manualy or remotely via serial interfaceRS-232Output terminals2W resistanceLED indicatedmaximum input voltageIndividualrotary buttonsGND terminalprotection earthLED indicatedswitching the decade onLED indicatedmod of remote controlFront panel is divided into logical areas :* output terminals field* LED indicated : - maximum working input DC voltage- REM ( remote control )- ON/OFF mode* individual rotary buttons


Rear panel with interfaceRS-232 interfacePower on/off buttonPower supply connectorPower line adapter<strong>High</strong> resistance decade box is aimed for calibrating of insulation meters and megaohm-meters.It is suitable for calibration laboratories and service centres, where can be used also fortesting or setting of high resistance meters.


2 W <strong>Resistance</strong> calibrationLED indicatedmaximum input voltageLED indicatedswitching the decade on1.Press ON/OFF button2.Set requested value usingindividual rotary buttonsSimple connection two-terminal calibration of UUTs:* Connect UUT input to the resistance decade 2W output terminals* Set requested valueNote:If it is not excluded due to measuring method of tested isolation meter,it is recommended ended to connect ground terminal on resistance decadehousing with ground terminal of power network or any other grounding point.


3 W <strong>Resistance</strong> calibrationLED indicatedmaximum input voltageLED indicatedswitching the decade on1.Press ON/OFF button2.Set requested value usingindividual rotary buttonsSimple connection three -terminal calibration of UUTs:* Connect UUT input to the resistance decade 2W outputand ground terminals* Set requested value


<strong>High</strong> <strong>Resistance</strong> <strong>Decade</strong>!!! WARNING !!!Before using the resistance decade, follow these instructions:1. Check the quality of connection betwen terminals H, L.2. Check the pre-defined resistance value relative to the valueof applied voltage.3. When measuring and manipulating rotary buttons, workwith maximum caution-you are working with high voltage.4. Connect measuring voltage only for the necessary time.5. It is not allowable to leave the resistance decadeunsupervised when measuring voltage is connected.6. Before manipulation with measuring cables, checkswitching off of test voltage source.!!! If you are not absolutely sure aboutthe safety of the connection, do nottouch operating elementsor the instrument shield. !!!


Ordering information - options<strong>High</strong> resistance decade M- <strong>109R</strong>Contents of delivery<strong>High</strong> resistance decade M-<strong>109R</strong>Power line adapterCable RS-232Demo program on CDOperation manual<strong>High</strong> resistance decade M- <strong>109R</strong>OptionRack module 19" , 3HE ( extra ordered )

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!