10.07.2015 Views

Supplier Quality Assurance Requirements - Elbit Systems of America

Supplier Quality Assurance Requirements - Elbit Systems of America

Supplier Quality Assurance Requirements - Elbit Systems of America

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4.11 Nondestructive Test (NDT) Submittal <strong>Requirements</strong>Revision Level: PRevision Date: 07/09/2012QP-SQAR<strong>Supplier</strong> <strong>Quality</strong> <strong>Assurance</strong><strong>Requirements</strong>M7 AerospaceProprietary Information<strong>Supplier</strong> <strong>Quality</strong> <strong>Assurance</strong><strong>Requirements</strong>Page 12 <strong>of</strong> 19<strong>Supplier</strong> shall review the purchase order and associated drawings/drawing notes, specifications,customer requirements and related documents to determine if NDT is required. NDT generalprocedures and part-specific techniques are required to be reviewed by a Level III prior toproduction testing. After initial approval, any changes to subject documents must be re-submittedto a Level III for approval.<strong>Supplier</strong>s using sub-tier suppliers for NDT shall ensure that the selected NDT sub-tier has M7approval for the NDT procedure/technique used. Where required, the supplier shall have Nadcapaccreditation.4.12 Part Marking <strong>Requirements</strong><strong>Supplier</strong> shall mark all deliverable products as required by the purchase order, engineeringdrawing, specifications and manufacturing planning.As a minimum, parts manufactured for M7, shall be identified with the following information, butare not limited to:a. Part Numberb. Drawing Revisionc. Date <strong>of</strong> Manufactured. Purchase Order Numbere. Indication <strong>of</strong> acceptance by the supplier’s quality system (inspection stamp)f. FAA-PMA for all PMA partsNOTE: Refer to the “Raw Material” section <strong>of</strong> this document for marking requirements specific toraw materials.4.13 Special ProcessesProcessors, and suppliers, including sub-tier suppliers, providing process services (such as;welding, brazing, heat treatment, plating, chemical conversion coatings, chemical cleaning andstripping, prime and paint, NDT processes, structural adhesive bonding and abrasive/mechanicalblast cleaning), will be subject to special approval conditions when required by the processspecification, regardless <strong>of</strong> specification ownership (M7 or its customers).4.13.1.1 M7 Designed Product<strong>Supplier</strong>s and sub-tier suppliers/processors performing special processes to M7Standard Process Specification (SPS) must be approved by M7. <strong>Supplier</strong>/processormust comply with any special conditions regarding the methods for the approval <strong>of</strong>itself and sub-tier suppliers to perform certain M7 Standard Process Specification(SPS) work, if so flowed-down on M7 purchase order. The primary supplier isresponsible for ensuring that the requisite approvals exist before releasing materialsto the sub-tier.Printed Copy is UncontrolledReviewed by: Director, Supply Chain OperationsDirector, ASM QCApproved by: Vice President, <strong>Quality</strong> <strong>Assurance</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!