10.07.2015 Views

Supplier Quality Assurance Requirements - Elbit Systems of America

Supplier Quality Assurance Requirements - Elbit Systems of America

Supplier Quality Assurance Requirements - Elbit Systems of America

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Revision Level: PRevision Date: 07/09/2012QP-SQAR<strong>Supplier</strong> <strong>Quality</strong> <strong>Assurance</strong><strong>Requirements</strong>M7 AerospaceProprietary Information<strong>Supplier</strong> <strong>Quality</strong> <strong>Assurance</strong><strong>Requirements</strong>Page 16 <strong>of</strong> 19Buyer requests for corrective and preventive action will be issued to the supplier’s representativein the form <strong>of</strong>, but not limited to, <strong>Supplier</strong> Corrective Action Request (SCAR), and failure analysisreporting, as required by engineering specification or contract data item requirements.M7 retains the right to conduct corrective action verification at the primary supplier and/or sub-tiersupplier facility to assess effectiveness <strong>of</strong> implemented corrective action.NOTE: Material currently undergoing corrective action investigation processing up to andincluding verification <strong>of</strong> corrective action shall not be shipped without the authorization <strong>of</strong> M7<strong>Quality</strong> <strong>Assurance</strong>.5.0 Relevant Records:Record NumberNoneRecord Name6.0 Related Procedures & Instructions:Procedure NumberMSP-CP 7.1.3Procedure TitleDigital Data and Product Definition Plan7.0 Document Revision History:Paragraph(s) Description <strong>of</strong> Change(s)RevisionLevelDateAll Initial Release <strong>of</strong> M7<strong>Supplier</strong> <strong>Quality</strong> <strong>Assurance</strong> <strong>Requirements</strong> IR 12/3/20044 Clarified calibration supplier requirements. A 2/25/200512 Revised part marking requirements. A 2/25/200512 Clarified sub-tier approval requirements. A 2/25/200513 Added Calibration <strong>Requirements</strong> section. A 2/25/2005All Changed section-numbering convention from letter to number format. B 4/21/20063 Added section references to Index. B 4/21/20064 Deleted/moved calibration requirements statement. B 4/21/20064 Clarified statement <strong>of</strong> minimum quality system requirements. B 4/21/200652.2.1, Removed redundant text, added definitive text.2.2.2.1, added for clarification <strong>of</strong> supplier designed product topic.B 4/21/20062.2.2.2, added for clarification <strong>of</strong> proprietary, customer designed product topic.6 2.2.5, added statement concerning corrective action request. B 4/21/20067 2.4, edited for clarity and definition <strong>of</strong> subjects “conformance” and “test reports”. B 4/21/200682.5.4, edited for general clarity and definition; added note to provide test report withmetallic fastener shipment.B 4/21/20062.5.5, added paragraph for requirement <strong>of</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!