10.07.2015 Views

Supplier Quality Assurance Requirements - Elbit Systems of America

Supplier Quality Assurance Requirements - Elbit Systems of America

Supplier Quality Assurance Requirements - Elbit Systems of America

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Revision Level: PRevision Date: 07/09/2012QP-SQAR<strong>Supplier</strong> <strong>Quality</strong> <strong>Assurance</strong><strong>Requirements</strong>M7 AerospaceProprietary Information<strong>Supplier</strong> <strong>Quality</strong> <strong>Assurance</strong><strong>Requirements</strong>Page 15 <strong>of</strong> 19c. Scrap: Permanent removal from production and destruction <strong>of</strong> product found to beunfit for use. Scrapped product shall be quarantined until destroyed (mutilated).d. All other dispositions: material shall be submitted to M7 MRB.4.15.2 MRB Dispositions<strong>Supplier</strong>s do not have MRB / concession / design deviation authority for items designedby M7, or items designed by the supplier in compliance with an M7 Source/SpecificationControl Drawing (SCD) or any <strong>of</strong> M7’s customers (e.g., DoD, primes, other OEM’s, etc.)unless delegated in writing by M7. The supplier MRB shall not perform any dispositionon any nonconformance requirements that affect form, fit, function, weight,interchangeability, maintainability, reliability, safety, or any key characteristic <strong>of</strong> theproduct. Nonconformance affecting these parameters shall be submitted to the M7 MRB.4.15.3 Notification/ DisclosuresThe suppliers system shall provide for timely reporting <strong>of</strong> nonconformities that may affectalready delivered product, including any continuing airworthiness actions. Notification tothe buyer shall include a clear description <strong>of</strong> the discrepancy, which includes asnecessary; parts affected, customer and/or supplier part numbers, quantities, and date(s)delivered.4.15.4 Exception to RejectionsIn the event a supplier does not accept the responsibility for a discrepant condition, thesupplier shall initiate a letter <strong>of</strong> exception to the M7 buyer. The letter shall make fullreference to applicable documents, and be specific and clear in defining the area <strong>of</strong>exception.4.15.5 Notification <strong>of</strong> adverse actionThe supplier shall notify M7 in writing <strong>of</strong> any adverse action taken by the supplier’scustomers, Government, FAA or Foreign Equivalent, or changes to the process orprocedures that affect conformity <strong>of</strong> any product.4.15.6 Nonconforming Material<strong>Supplier</strong> manufactured product rejected at M7 shall require a response from the supplierdocumenting actions taken to correct the product (if applicable) and actions taken toprevent recurrence <strong>of</strong> the nonconformance. M7 may issue a formal <strong>Supplier</strong> CorrectiveAction Request (SCAR) containing a timeframe for supplier response and completion;refer to the “Corrective and Preventive Action” section <strong>of</strong> this document.4.16 Corrective and Preventive ActionThe supplier shall respond to all buyer requests for corrective action on or before the requestedresponse due date. <strong>Supplier</strong> shall maintain a documented system for determining root causes <strong>of</strong>documented defects and obtaining corrective action both internally and from its suppliers. Thesupplier is accountable for effectiveness <strong>of</strong> corrective and preventive actions taken.Printed Copy is UncontrolledReviewed by: Director, Supply Chain OperationsDirector, ASM QCApproved by: Vice President, <strong>Quality</strong> <strong>Assurance</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!